“Credibility involves wider problems than mere “demeanour” which is mostly concerned with whether the witness appears to be telling the truth as he now believes it to be. Credibility covers the following problems. First, is the witness a truthful or untruthful person? Secondly, is he, though a truthful person, telling something less than the truth on this issue, or, though an untruthful person, telling the truth on this issue? Thirdly, though he is a truthful person telling the truth as he sees it, did he register the intentions of the conversation correctly and, if so, has his memory correctly retained them? Also, has his recollection been subsequently altered by unconscious bias or wishful thinking or by overmuch discussion of it with others? Witnesses, especially those who are emotional, who think that they are morally in the right, tend very easily and unconsciously to conjure up a legal right that did not exist. It is a truism, often used in accident cases, that with every day that passes the memory becomes fainter and the imagination becomes more active. For that reason a witness, however honest, rarely persuades a Judge that his present recollection is preferable to that which was taken down in writing immediately after the accident occurred. Therefore, contemporary documents are always of the utmost importance. and lastly, although the honest witness believes he heard or saw this or that, is it so improbable that it is on balance more likely that he was mistaken? On this point it is essential that the balance of probability is put correctly into the scales in weighing the credibility of a witness, and motive is one aspect of probability. All these problems compendiously are entailed when a Judge assesses the credibility of a witness; they are all part of one judicial process and in the process contemporary documents and admitted or incontrovertible facts and probabilities must play their proper part.”
“There is no statutory or other legal definition of an MSA although the term is used widely and with varying degrees of precision in a number of contexts and from a number of perspectives, including those of operators and retailers, the travelling public and professionals of various kinds involved in motorway and roadside services industry.”
“… whilst we have pushed the turning rate at Stop 24 via Roger Tym to 15% I believe that we could justify that due to the unique nature of Stop 24.”
“This proposal is unusual in that at the time the planning and highway consents were granted it had permission for the largest element of retail on an MSA in the UK. The scheme would be a hybrid of retail and MSA. The whole concept for this particular MSA is different to most in that terms had previously been agreed with P & O Stena Line to operate a coach park on the site, whereby the drivers/coaches swap over from left hand drive. This process is usually 20/25 minutes and thus their passengers would shop or eat at the facilities. Discussions were also held with Channel Tunnel and the Ferry Operators to have check in desks and LCD displays of train/ferry times and any delays to the timetable. The object of this is to encourage people to arrive early with a view to checking in, then either shopping or eating whilst they wait for their train or ferry. … Consequently this scheme is envisaged as a destination in its own right.”
“In order to assist you I have enclosed a copy of the Planning Permission for the scheme with the approved plans. As discussed the scheme is different from that usually associated with Motorway Service Areas in that we are attempting to create a facility to act as a “departure lounge” for those using either the Channel Tunnel Rail Link of the ferry port at Dover. In the past there have also been discussions with various coach operators regarding the possibility of creating a coach interchange for cross channel travellers. Whilst these discussions took place some time ago this is obviously an area which we will be exploring now that we have exchanged contracts on the site.”
“Comprehensive data regarding traffic flow numbers on motorway, turning rates, customer numbers, profiling of customers (i.e. ABC’s, age profile), projections for growth year on year, nature of customer (business, pleasure, local)”
“Coach traffic in 2003 was significantly lower than calculated in 1999. Both Eurotunnel and Port of Dover statistics show a decline in the number of coaches, cars and passengers since 1999. The decline in coach traffic may be in part attributable to the rise of low-cost airlines in recent years; the closure of cross-channel crossings at Folkestone; and the abolition of duty free status for goods. The decline in coach traffic has meant that not only is coach traffic low for 2003, but also that no growth is forecast in our 2004 report, with a consequent impact on traffic projection figures.”
“… the paragraph assumes that Saltwood MSA will achieve a “slightly higher than average turn in rate”
“Every care has been taken to ensure the reliability of the assessment, which is presented in good faith. However, the calculation is based on a number of assumptions and data inputs from various sources and it should be borne in mind that the final outcome is a “best estimate”.”
“Misrepresentation Act 1967 . Messrs Ashwell Rogers, Gooch Cunliffe Whale and Henry Boot Developments for themselves and for the lessor(s) of the property whose agents they are, give notice that 1. These particulars do not constitute any part of an offer or contract. 2. None of the statements contained in these particulars are to be relied on as statements or representations of fact. 3. Any intending lessee must satisfy himself by inspection or otherwise as the correctness of each of the statements contained in these particulars. 4. The lessor(s) do not make or give and neither Ashwell Rogers, Gooch Cunliffe Whale and Henry Boot Developments nor any person in their employment has any authority to make or give any representation or warranty whatsoever in relation to this property.”
“The Highways Agency’s current policy on MSAs is that there may not be any more than 5,000 2 feet of retail space at the site. My Clients have information that the latest planning consent obtained by your Clients provides for over 17,000 2 feet retail space, and if that should prove to be correct then signing will not be granted. I am instructed that the Highways Agency are currently considering the position and until they are fully satisfied that their policy requirements are being met, they will not agree signing.”
“we have always been sceptical as to how Saltwood had achieved a Blue Signage Agreement with such a large element of retail, they have had a draft Agreement out with the Highways Agency for a number of years, being fully aware of the size of MSA being proposed…. …bearing in mind we have a planning consent, could you please advise what the legal position is i.e. can Highways refuse Blue Signage in which case the consent is useless.”
“extremely well. “Off the record” they are embarrassed about the whole thing, as they had to acknowledge that for some years the Highways Agency have been in discussion with us and have never raised the issue and had been treating matters as a normal extension to the previously signed Agreement. Accordingly they are seeking to assist us in resolving the issue without creating a precedent. They are looking at us being a special case because of our relationship with the Port and the Dover Port Authority are supporting us with a letter to the Highways, so whilst we are not over this hurdle yet, it is looking promising.”
“… we entered into discussions with Henry Boot saying that their facility would not be signed but actually looking for a get out. Fortunately this was rapidly provided…. [What Henry Boot told them about the site] provided the basis for a face-saving solution… We don’t like the arrangement but it was the only way to get all parties out of a sticky situation…. The Minister, DfT and ourselves all agreed that this is a unique site… On that basis no other site of this nature will be signed.” (Emphasis added)
“Whilst historically this site had a blue signs consent, the renewal had proved difficult due to the interference of the landowner who objected to the hotel consent. We could have a signed agreement if we were to reduce the retail element in the scheme to comply with the current standards on retail for an MSA, which is 15,000 sq ft. We currently have planning consent for 17,219 sq ft of retail and with the revised scheme this is slightly reduced to 15,673 sq ft. Accordingly there is no uncertainty that we will secure a Blue Signs Agreement, it is just for what square footage of retail. At present we are pursuing the route of seeking Agreement to the larger square Footage that requires the Agreement to be signed off by a Minister and are encouraged by the Highways Agency approach to date. If we were unable to secure consent for the larger scheme, then the landowner would not be in a position to meet one of the conditions of the Agreement for Lease, [if we were to exercise our Option], and thus there would be no point in exercising the Option and we would at that stage renegotiate the purchase price, to take into account the smaller scheme.”
“I appreciate that this is outside your normal remit for traffic data, however, if you feel it is something you could assist us on, I shall be grateful to hear from you.”
“However, there are assumptions in the Roger Tym Visitor Numbers which do give me concern and while I have no wish to dampen your enthusiasm, I believe that it would only be fair to share this concern. You will see from the traffic figures which I sent you that both car and coach traffic have been falling over recent years. As mentioned in my e-mail, our expectation is that this decline will continue for a few years before commencing a gradual increase round about 2010-2015 for cars. Coach traffic on the other hand is likely to continue to decline since it is this sector which has been most hit by the “glamour” of budget airlines. The same considerations apply to the Channel Tunnel and so the substantial growth predicted by Roger Tym and Partners would only be available from a growth in local traffic. Therein lies my biggest concern since the location is so close to the destination/origin for most users of this road, thus the factor applicable to 30 mile intervals is probably inappropriate with the 15 mile interval likely to be more relevant. Given that there are catering/retail facilities at both the tunnel and the port it is likely that much of the traffic heading for these will continue to the destinations when they are so close. On the other hand, those coming into the country will have had plenty of opportunity for retail/catering therapy in Calais or aboard the ferries. Given that the cross-Channel travellers are likely to provide a high proportion of customers, in view of earlier comments I would suggest that the figures given in 3.16 are very optimistic. I mentioned to you that 75% of the Port of Dover traffic uses the M20. That equates to about 5,000 cars per day. About the same number can be expected to be using the tunnel which provides a total of 10,000 cross-Channel cars per day, half of which will be going out and the other half returning. If these were the only likely candidates for this service area then Roger Tym’s predictions in 3.16 would equate to 62% leaving the M20 to visit the site in 2006 and probably over 70% in 2016.”
“While we appreciate the concern which conflicting statistics can cause, we feel that the viability of our scheme has been proven by the level of tenant interest and the quality of these tenants, all of whom are major covenants and will have conducted their own due diligence into the project.”
“The next point is that any passengers coming into the country from France will have no need to stop so soon and may be expected to press on towards their destination. That removes half this market segment. On the other hand, those that are going out have the opportunity to obtain refreshment at the tunnel or the port and aboard the ferries so there is only limited prospect of their choosing to break their journey when they are so close to these destinations. Accordingly, Roger Tym’s factor of 7.5% based on 15 mile intervals is probably the best that might be expected. If you apply this to the 10,000 cars using the A20 to and from the Tunnel and the Port of Dover last year, half would coming into the country, leaving 5,000 x 7.5% = 375 cars to turn into the MSA. This is less than 7% of the figure projected in the report! Another significant flaw in your assumptions is in respect of potential dwell time of cross-Channel travellers. The tunnel and the ports are unlike most airports in that their customers have a very limited number of destinations but a very frequent number of services. Consequently there is no real imperative to arrive hours in advance of the travel time. Both the port and the tunnel offer three or more crossings per hour and the response which you have quoted from Hoverspeed that anybody trying to book in more than two hours ahead is turned away is totally exceptional and unusual. For most days in the year, at least 90% of passengers who arrive an hour early will travel on an earlier crossing. Conversely those who arrive late will not usually have long to wait for the next sailing.”
“You sent me a report by Roger Tym & Partners seeking to justify a higher usage rate at Saltwood MSA because of its unique status. Nevertheless the passing flows on M 20 are low by motorway standards and Highways Agency would probably accept that one factor that has precluded the implementation of an MSA at Saltwood before now has been concern over viability.”
“Essentially it may be possible to do an update but it could easily give you the wrong answer. I suggest that if the data is available it is ordered and we review it. Cost about£250 ex VAT including the data and our time to look at it. If it looks like we can produce an answer that at least gives a figure that is no lower than before we can do a fuller update …”
“Eurotunnel received this very well commenting that they perceive Stop 24 will enjoy longer “dwell-times” and thus did not see the site as “competition”
“… he was looking at the merits of creating a coach interchange facility on the adjoining land for which Henry Boot have an option agreement. It was noted that the current coach interchange offer at the channel tunnel is extremely poor and there appeared to be demand from various operators to operate a facility at Stop 24.”
“Also we did discuss and agree that it was mutually beneficial to have good quality live time information being fed from Eurotunnel to our facility and to this end I would be grateful if you would confirm who would deal with this on behalf of Eurotunnel in order that discussions at the relevant time can commence.”
“At present we have a bespoke unit designed for the tourist information centre, and you will appreciate that we do not want to build it and it sits empty. Accordingly, we wish to know ASAP not by the time the property is built.”
“You will note that the report contains a paragraph referring to a “High Turn In” scenario. Please ignore this paragraph which was inserted purely for marketing purposes. I have also put a call out to our Highways Consultant who has done some previous studies on the motorway junction to see if there is any further information which would be of use to you.”
“I believe that we should obtain from CACI a breakdown of how they arrived at the turn in rate of 26%. As you know the average turn in rate for a motorway service area is between 7% and 8%? Previously Fripps and Roger Tym worked on 15%. Potentially I believe this figure could, if we cannot back it up, prove quite damaging.”
“… somewhat arbitrarily chosen 26% as the turn in rate which is staggeringly excessive bearing in mind that the current turn in rate is between 7% and 8% and whilst we have pushed the turn in rate at Stop24 via Roger Tym to 15% I believe that we could justify this due to the unique nature of Stop 24.26% however is almost certainly going to lead to this report being ridiculed.”
“As you are aware, over the period that we have been marketing the development we have been informing retailers (verbally) that we are endeavouring to build a coach interchange on site that will be used by the majority or possibly all of the coach companies currently servicing both the ferries and Eurotunnel. The intention is that coaches which are coming in from different parts of the UK will use the site to decant into coaches going across the Channel. As such we will need to be liaising with various coach companies and coach drivers associations and such like to encourage coach drivers to use our facility rather than those either at the port or Eurotunnel or indeed Maidstone.”
“At the current time we are finalising how we will operate the proposed coach interchange, although it is the intention to offer our facility up to coach operators to allow them to transfer from a number of coaches into a single coach or to transfer from right to left hand drive or also as a general meeting point for customers.”
“Q: In relation to any agreements affecting the Property that have been entered into with any planning, highway or other public authority or utilities provider… confirm that there are no breaches of any of their terms A: None as far as the Seller is aware. Q: Are you required to enter into any agreement or obligation with any planning, highway or other public authority or utilities provider? A: The Seller is required under the above s. 106 agreement to enter into a Roads Agreement with Kent County Council for the adoption of the access road prior to commencing development. Q: Are you aware of any breach of, alleged breach of or any claim under any statutory requirements or bye-laws affecting the Property … A: The Seller has received no notice of any breach Q: Except as disclosed in replies to CPSE.1 please give details of … any disputes or complaints relating to the property or to the Development A: There are none so far as the Seller is aware but the Seller has made no particular enquiries into this matter.”
“This Agreement constitutes the entire agreement between the parties hereto and the Tenant acknowledges that it is entering into this Agreement on the basis of the terms hereof and not in reliance upon any representation or warranty whatsoever whether written or oral expressed or implied made by or on behalf of [Henry Boot] (save for written replies given by [Henry Boot’s] solicitors to the enquiries raised by the Tenant’s solicitors)”
“… the site will also be the interchange for all coach services where drivers swap from right hand to left hand drive coaches for [their] onward journey.”
“… you only have to look at the examples we have at Welcome Break-EG Fleet M3 to see how powerful good signage can be – although as an independent they may be looking at more muted operator signs? They should wish for a big brand like KFC to lure in custom? ... Can we ask Henry Boot where they are proposing signs first etc and then go with “deal” requests?”
“MR DUTTON: But you accept you signed up on terms that contained an express acknowledgment which identified the precise representations you relied upon, 16.7, you accept you signed that? A. I do, yes. Q. And you would accept presumably, therefore, that what you said there was true. It was true, wasn’t it? You weren’t relying on anything accept the documents that are referred to in 16.7, were you? A. No. Q. Is that a “yes” no or a “no” no? A. That’s a “yes” no. MR JUSTICE LEWISON: Are you accepting, Mr Budge, that you did not rely on anything apart from the written replies given by -- A. I am. MR JUSTICE LEWISON: You are accepting that? A. I am.”
“MR MATTHIAS: Just assuming that you signed an agreement for a lease containing a term like this, as you look at it now, is it correct? A. When you say is it correct ... Q. Does it tell the truth? Does that clause tell the truth? A. Yes.”
“No planning yet. Why stop because Eurotunnel only 2 junctions ahead… Why fill up there. Cheaper in France. Why biggest service stat in GB on a road going nowhere.”
“toilet access 24 hr Blues sign 2 m + 10 m will know next one there after Maidstone Dover, Ferry Port Eurotunnel, Folkestone out & back”
“… my expectation and belief was that the signage would be in accordance with standard motorway signage with standard wording, normally denoting the name of the service operator and some of the facilities, including the word “services”
“Stop 24 was going to be a hub for coaches. European and British coaches would use Stop 24 as a hub while the luggage was swapped from left hand to right hand drive, travellers would have a dwell time of 30-40 minutes and use stop 24 toilets and services… Coaches from different cities in the UK would also meet there and consolidate before going on to Europe. Customers would have to wait inside.”
“Listen I spoke to someone at Stop 24 and asked him to clarify the position of the coaches which will stop there and transfer to left hand or right hand drive. He said I didn’t know what I was talking about and where did I get that from. I said from the bloke at Henry Boot and you. Do you know if this is happening?”
“Port of Dover, which currently operates a coach stopping area, has indicated that the four acre site to the extreme west of the site could be used in the future as a coaching terminal.”
“Q. …You had your idea about what an MSA was, presumably? A. Well, yes. Q. Would it be fair to say it's a service area next to a motorway that includes facilities, toilets, food, fuel, shops, other conveniences -- that's the first part of it -- and, secondly, it is a service advice area that has some sort of blue signage and takes people off the motorway to use those facilities. Those are the two elements of what an MSA is? A. That's a fair assumption. Yes, I would agree with that. Q. There is no other magic in whether something is an MSA, is there? As long as you have those two things, you are happy, are you not? A. Other than passing traffic.”
“… I had negotiations with Neil Grice who confirmed to me what Kevin Frost had said: this was to be a motorway service area, and it was going to be one of the biggest and best in Europe. He confirmed that the foot-flow figures looked very impressive, and he also indicated to me that this was going to be a major hub for coaches to interchange from left-hand to right-hand drive and vice versa, as coaches made their way to and from the Continent. He told me that it was going to be a consolidation hub for coaches, so that four or five coach companies from the UK with passengers going on to a destination in Europe would converge at about the same time, and then all the passengers would swap onto one or two left-hand drive coaches for their onward journey. Mr Grice made the point of saying to me that, in the process, there was going to be an extended dwell time and the passengers would use the amenity centre.”
“Estimated visitor numbers on opening 4.6m per annum/88,000 per week.”
“The development will be [one of] the best food retailing opportunities in the UK. You would have been unopposed with an exclusivity on burger sale serving 4.5 million people a year with guaranteed growth. We are taking interest from a wide range of food offers and as such can pick and choose our food offer.”
“This Agreement constitutes the entire agreement between the parties hereto and the Tenant acknowledges that it is entering into this Agreement on the basis of the terms hereof and not in reliance upon any representation or warranty whatsoever whether written or oral expressed or implied made by or on behalf of [Henry Boot] (save for written replies given by [Henry Boot’s] solicitors to the enquiries raised by the Tenant’s solicitors)”
“56 There is no reason in principle why parties to a contract should not agree that a certain state of affairs should form the basis for the transaction, whether it be the case or not. For example, it may be desirable to settle a disagreement as to an existing state of affairs in order to establish a clear basis for the contract itself and its subsequent performance. Where parties express an agreement of that kind in a contractual document neither can subsequently deny the existence of the facts and matters upon which they have agreed, at least so far as concerns those aspects of their relationship to which the agreement was directed. The contract itself gives rise to an estoppel: see Colchester Borough Council v Smith[1991] Ch 448 , affirmed on appeal[1992] Ch 421 . 57 It is common to include in certain kinds of contracts an express acknowledgment by each of the parties that they have not been induced to enter the contract by any representations other than those contained in the contract itself. The effectiveness of a clause of that kind may be challenged on the grounds that the contract as a whole, including the clause in question, can be avoided if in fact one or other party was induced to enter into it by misrepresentation. However, I can see no reason in principle why it should not be possible for parties to an agreement to give up any right to assert that they were induced to enter into it by misrepresentation, provided that they make their intention clear, or why a clause of that kind, if properly drafted, should not give rise to a contractual estoppel of the kind recognised in Colchester Borough Council v Smith. However, that particular question does not arise in this case. A clause of that kind may (depending on its terms) also be capable of giving rise to an estoppel by representation if the necessary elements can be established: see E A Grimstead & Son Ltd v McGarrigan (CA)27 October 1999 , unreported.”
“I am quite satisfied, having looked at the cases, that the two forms of “estoppel” are different. I am also satisfied that Mr McPherson is correct in submitting that if he can rely on “contractual estoppel” as analysed in the Peekay case, he does not need to rely on an “evidential estoppel”.”
“In relation to a contract term, the requirement of reasonableness for the purposes of this Part of this Act,section 3 of the Misrepresentation Act 1967 andsection 3 of the Misrepresentation Act (Northern Ireland) 1967 is that the term shall have been a fair and reasonable one to be included having regard to the circumstances which were, or ought reasonably to have been, known to or in the contemplation of the parties when the contract was made.”
“There are, as it seems to me, at least two good reasons why the courts should not refuse to give effect to an acknowledgement of non-reliance in a commercial contract between experienced parties of equal bargaining power— a fortiori , where those parties have the benefit of professional advice. First, it is reasonable to assume that the parties desire commercial certainty. They want to order their affairs on the basis that the bargain between them can be found within the document which they have signed. They want to avoid the uncertainty of litigation based on allegations as to the content of oral discussions at pre-contractual meetings. Second, it is reasonable to assume that the price to be paid reflects the commercial risk which each party—or, more usually, the purchaser—is willing to accept. The risk is determined, in part at least, by the warranties which the vendor is prepared to give. The tighter the warranties, the less the risk and (in principle, at least) the greater the price the vendor will require and which the purchaser will be prepared to pay. It is legitimate, and commercially desirable, that both parties should be able to measure the risk, and agree the price, on the basis of the warranties which have been given and accepted.”
“It is well established that fraud or dishonesty … must be distinctly alleged and as distinctly proved; that it must be sufficiently particularised; and that it is not sufficiently particularised if the facts pleaded are consistent with innocence: … This means that a plaintiff who alleges dishonesty must plead the facts, matters and circumstances relied on to show that the defendant was dishonest and not merely negligent, and that facts, matters and circumstances which are consistent with negligence do not do so.” “As I have said, the defendant is entitled to know the case he has to meet. But since dishonesty is usually a matter of inference from primary facts, this involves knowing not only that he is alleged to have acted dishonestly, but also the primary facts which will be relied upon at trial to justify the inference. At trial the court will not normally allow proof of primary facts which have not been pleaded, and will not do so in a case of fraud. It is not open to the court to infer dishonesty from facts which have not been pleaded, or from facts which have been pleaded but are consistent with honesty. There must be some fact which tilts the balance and justifies an inference of dishonesty, and this fact must be both pleaded and proved.”
“The question is not whether the defendant in any given case honestly believed the representation to be true in the sense assigned to it by the court on an objective consideration of its truth or falsity, but whether he honestly believed the representation to be true in the sense in which he understood it albeit erroneously when it was made.”
“The alleged untrue statement is that, “The company has the right to use steam or mechanical power instead of horses,” and that a saving would be thereby effected. Now, this is certainly untrue, because it is stated as an absolute right, when in truth it was conditional on the approval of the Board of Trade, and the sanction or consent of two local boards; and a conditional right is not the same as an absolute right. It is also certain that the defendants knew what the truth was, and therefore knew that what they said was untrue. But it does not follow that the statement was fraudulently made. There are various kinds of untruth. There is an absolute untruth, an untruth in itself, that no addition or qualification can make true; as, if a man says a thing he saw was black, when it was white, as he remembers and knows. So, as to knowing the truth. A man may know it, and yet it may not be present to his mind at the moment of speaking; or, if the fact is present to his mind, it may not occur to him to be of any use to mention it. For example, suppose a man was asked whether a writing was necessary in a contract for the making and purchase of goods, he might well say “Yes,” without adding that payment on receipt of the goods, or part, would suffice. He might well think that the question he was asked was whether a contract for goods to be made required a writing like a contract for goods in existence. If he was writing on the subject he would, of course, state the exception or qualification.”
“I think the authorities establish the following propositions: First, in order to sustain an action of deceit, there must be proof of fraud, and nothing short of that will suffice. Secondly, fraud is proved when it is shewn that a false representation has been made (1) knowingly, or (2) without belief in its truth, or (3) recklessly, careless whether it be true or false. Although I have treated the second and third as distinct cases, I think the third is but an instance of the second, for one who makes a statement under such circumstances can have no real belief in the truth of what he states. To prevent a false statement being fraudulent, there must, I think, always be an honest belief in its truth. And this probably covers the whole ground, for one who knowingly alleges that which is false, has obviously no such honest belief. Thirdly, if fraud be proved, the motive of the person guilty of it is immaterial. It matters not that there was no intention to cheat or injure the person to whom the statement was made.”
“To make a statement careless whether it be true or false, and therefore without any real belief in its truth, appears to me to be an essentially different thing from making, through want of care, a false statement, which is nevertheless honestly believed to be true. And it is surely conceivable that a man may believe that what he states is the fact, though he has been so wanting in care that the Court may think that there were no sufficient grounds to warrant his belief.”
“… I cannot assent to the doctrine that a false statement made through carelessness, and which ought to have been known to be untrue, of itself renders the person who makes it liable to an action for deceit. This does not seem to me by any means necessarily to amount to fraud, without which the action will not, in my opinion, lie.”
“At the same time I desire to say distinctly that when a false statement has been made the questions whether there were reasonable grounds for believing it, and what were the means of knowledge in the possession of the person making it, are most weighty matters for consideration. The ground upon which an alleged belief was founded is a most important test of its reality. I can conceive many cases where the fact that an alleged belief was destitute of all reasonable foundation would suffice of itself to convince the Court that it was not really entertained, and that the representation was a fraudulent one. So, too, although means of knowledge are, as was pointed out by Lord Blackburn in Brownlie v. Campbell, a very different thing from knowledge, if I thought that a person making a false statement had shut his eyes to the facts, or purposely abstained from inquiring into them, I should hold that honest belief was absent, and that he was just as fraudulent as if he had knowingly stated that which was false.”
“Of course, a representation that something will be done in the future cannot either be true or false at the moment it is made, and although you may call it a representation, if it is anything, it is a contract or promise.”
“A representation as to future conduct has no effect unless it constitutes a contract.”
“My Lords, the distinction in law between a promise as to future action, which may be broken or kept, and a statement as to existing fact, which may be true or false, is clear enough. There may be inherent in a promise an implied statement as to a fact, and where this is really the case, the court can attach appropriate consequences to any falsity in, or recklessness in the making of, that statement. Everyone is familiar with the proposition that a statement of intention may itself be a statement of fact and so capable of being true or false. But this proposition should not be used as a general solvent to transform the one type of assurance with another: the distinction is a real one and requires to be respected, particularly where the effect of treating an assurance as a statement is to attract criminal consequences, as in the present case.”
“29 We consider that the fax of March 30, 1998 contained express representations by SGL as to the commitment of each of the Spice Girls to the future implementation of all the terms of the heads of agreement as subsequently incorporated into the formal agreement to be concluded between SGL and Aprilia. That statement was untrue because SGL knew that the term of the agreement for which provision was made in the heads of agreement was 12 months and that there was a risk that Ms Halliwell would leave after only six of them. The fact that SGL did not know of the terms of the fax and the fact that KLP did know of the risk are not material to the question whether the fax contained a misrepresentation. The unqualified assurance as to the commitment of each Spice Girl to the entire commercial sponsorship described in the heads of agreement contained within it the implied representation that SGL did not know of any matter which might falsify the assurance. That was a representation of fact and it was false.” (Emphasis added)
“SGL did not know and had no reasonable grounds to believe at or before the time of entry into the agreement that any of the Spice Girls had an existing declared intention to leave the group during the minimum term of the Agreement.” (Emphasis added)
“That was not a statement of future intent. It was a representation of fact, as to the services and personnel that FRL would provide to the Defendants. It was indistinguishable from the actionable representation in the Spice Girls case.”
“It seems to me that the case of Esso Petroleum v Mardon[1976] QB 801 has been for the last quarter of a century perfectly good authority for the proposition that in a situation .. a forecast of probable sales potential of a filling station can be a representation which, if negligent or fraudulent, is capable of sounding in damages.”
“I think that the change in circumstances ought to have been communicated to the plaintiffs before they were allowed to close the transaction.”
“If A with a view to inducing B to enter into a contract makes a representation as to a material fact, then if at a later date and before the contract is actually entered into, owing to a change of circumstances, the representation then made would to the knowledge of A be untrue and B subsequently enters into the contract in ignorance of that change of circumstances and relying upon that representation, A cannot hold B to the bargain.”
“If false when made but true when acted upon there is no misrepresentation.”
“In such cases the question is whether the representor can be shown to be fraudulent by the time of the contract. For this to be established, the representee will have to show not only that the representee knew of the relevant change (he had discovered the change in the facts or he has discovered that he has already made a false statement) but also that his knowledge is sufficient to make him fraudulent: he must realise the significance of the change for the statement he has already made.”
“The learned Lord goes on to say that would be fraud, though nowadays the Court is more reluctant to use the word “fraud” and would not generally use the word “fraud” in that connection because the failure to disclose, though wrong and a breach of duty, may be due to inadvertence or a failure to realise that the duty rests upon the party who has made the representation not to leave the other party under an error when the representation has become falsified by a change of circumstances.”
“In this, as in all other normal conveyancing transactions, after there has been a subject to contract agreement the parties hand the matter over to their solicitors who become the normal channel for communication between vendor and purchaser in all matters relating to that transaction. In so doing, in my judgment the parties impliedly give actual authority to those solicitors to receive on their behalf all relevant information from the other party relating to that transaction. The solicitors are under an obligation to communicate that relevant information to their own clients. At the very least, the solicitors are held out as having ostensible authority to receive such information. Whether there be express or ostensible authority, the purchaser is in my judgment estopped from denying that he received the information relating to the transaction which has been communicated to his solicitors acting in the same transaction. In my judgment, such knowledge should be imputed to the principal. If that were not to be so, the consequences to which I have previously referred would follow.”
“Q. I would suggest that whatever faith you may or may not have had in Roger Tym’s report prior to these communications with Mr Fawcus, after these communications with Mr Fawcus, as I have said, you could have had no genuine belief that Roger Tym was correct, yet you left his report in the hands of your tenants and you didn't care whether it was right or wrong. That is the truth, isn’t it? A. No, it is not the truth, and we are just going round in circles because you are just repeating the same thing over and over again and I am repeating the same answers back to you. It was fundamental that we got this right because this was a long-term investment for a major company and if I had no belief in it, I would not have made the recommendations that I did to my board, which is that we would do a turnover rent. I do believe it is the first turnover rents that Henry Boot have ever done, let alone that I had been involved in, therefore if we had no faith in our own information, we would not have agreed to do turnover rents. Also, you have to remember at this stage Henry Boot Developments had only invested something like£50,000 in the option agreement. Their future investment was going to be over£10 million for the billed cost, I think. Why would we, if we had invested£50,000 and thought “No, actually this information isn’t correct”, why would we continue to further invest in the scheme? It doesn’t make sense.”
“4.41 Given that the 2005 TSA is a “conventional”