“Heavy” and will accommodate a uniformly distributed superimposed loading of 50.00 KN/m 2 (1000 lbs/ft 2) and pallet racking of 70 KN/leg (racking leg loading based on leg centres of 2.70m along length, 0.09m centres across width and 0.20m centres for back legs where positioned back to back). Ground floor movement joints will be designed so that no vertical movement occurs. The ground floor slab will be constructed so that the top surface is within the tolerances as defined in Concrete Society Technical Report No 34 of FM2 Property IV and free movement areas, and ±10mm from datum. Local level variations shall not exceed ±3mm in a 3.0m straight edge in any direction. Each warehouse floor slab shall be constructed with not more than 9 No. bays and saw cut joints within the slab shall not be made less than 9.0m apart, unless constrained by pallet layout. Saw cut and bay joints shall be infilled with suitable filler during construction and to accessible floor areas twelve months after the date of practical completion. A floor joint design drawing shall be produced and issued to the Tenant’s representative for agreement before construction commences. On completion of each warehouse area floor slab a profileograph survey will confirm the achieved surface tolerance, prior to any fitting out works taking place. Where appropriate, the slab will be designed and constructed in accordance with the recommendations of “The Cement and Concrete Association Technical Report No 550 and BCA Interim Technical Note II”
“Heavy” and will accommodate a uniformly distributed superimposed loading of 50.00 KN/m 2 (1000 lbs/ft 2) and pallet racking of 70 KN/leg (racking leg loading based on leg centres of 2.70m along length, 0.09m centres across width and 0.20m centres for back legs where positioned back to back). Ground floor movement joints will be designed so that no vertical movement occurs. The ground floor slab will be constructed so that the top surface is within the tolerances as defined in Concrete Society Technical Report No 34 of FM2 Property IV and free movement areas, and ±10mm from datum. Local level variations shall not exceed ±3mm in a 3.0m straight edge in any direction. Each warehouse floor slab shall be constructed with not more than 9 No. bays and saw cut joints within the slab shall not be made less than 9.0m apart, unless constrained by pallet layout. Saw cut and bay joints shall be infilled with suitable filler during construction and to accessible floor areas twelve months after the date of practical completion. A floor joint design drawing shall be produced and issued to the Tenant’s representative for agreement before construction commences. On completion of each warehouse area floor slab a profileograph survey will confirm the achieved surface tolerance, prior to any fitting out works taking place. Where appropriate, the slab will be designed and constructed in accordance with the recommendations of “The Cement and Concrete Association Technical Report No 550 and BCA Interim Technical Note II”