“The technology will be fully operational from next year on the Thameslink service in central London, which will see 24 trains pass through every hour. The Digital Railway Strategy is being launched in York, on the Transpennine route … Digital rail technology will ensure the best use is made of the almost£48 billion being invested in maintenance, modernisation and renewal on the rail network between 2019 and 2024, which includes new and replacement signalling. The government has also earmarked£450 million specifically for digital railway schemes…”
“The southern section of ECML has been identified and prioritised for the deployment of digital train control technologies in the first instance. The southern section of the ECML has a unique alignment of the following factors: i. The need to renew critical signalling assets in Control Period 6 (“CP6”) and Control Period 7 (“CP7”). CP6 runs from April 2019 and CP7 from April 2024. ii. The opportunity to address targeted capacity and performance constraints to delivery passenger and freight benefits, as well as enhance safety for passengers and workers, and; iii.70% of all passenger trains on the southern section of ECML will have digital (ETCS Level 2) capability in the early stages of CP6.”
“(1) In accordance with the principle in Energy Solutions EULtd v Nuclear Decommissioning Authority[2017] 1 WLR 1373 , it is denied that the alleged breaches, either individually or cumulatively, are sufficiently serious to warrant the award of damages. (2) Further and in any event, Alstom’s claim for wasted tender costs at paragraph 32 is excluded by operation of paragraph 2.3.4 of ITT 1.”