“(1) A local authority shall make full compensation to a person who has sustained damage by reason of the exercise by the authority, in relation to a matter as to which he has not himself been in default, of any of their powers under this Act.”
“(7) Where in consequence of the exercise of the powers conferred by this section the owner or occupier of any premises sustains damage, but section 106(1) below does not apply because the owner or occupier has been in default - (a) the owner or occupier may apply to a magistrates’ court to determine whether the local authority were justified in exercising their powers under this section so as to occasion the damage sustained, and (b) if the court determines that the local authority were not so justified, the owner or occupier is entitled to compensation, and section 106(2) and (3) below applies in relation to any dispute as regards compensation arising under this subsection.”
“The original Hastings Pier was opened in 1872. It was built to a length of 277m with its timber deck bearing on wrought iron lattice trusses, all supported on three rows of cast-iron screw piles via cast-iron columns; the columns were braced with wrought iron ties secured with cast-iron clamps. The width varied from 13.6m at the Central Section to 60m at Head and 39.6m at the landward end. Repairs utilising steel trusses and steel columns have been undertaken at various times since following a fire in 1917 to the Pier Head, partial demolition (sectioning) and actual bomb damage during the 1939-45 war, and widening to both sides of the Pier …”
“Experience has shown the typical life of Victorian piers to be approximately 100 years; during this time continual maintenance would have been required, including the replacement [of] some critical elements. After this time, major reconstruction works would be required if continued use of the pier were to be viable. The general condition of Hastings Pier fits this pattern.”
“With regard to the remaining work it is understood that this cannot be undertaken immediately. However this work should be completed within one year, with regular monitoring of the defective areas until this can be achieved. Unless this is carried out we judge there to be an unacceptable risk to the public.”
“In recent days the council has become aware that major events were still being booked for the Pier ballroom; two of these have been booked for July and one in August. As a result of its concerns over the Pier structure the Council commissioned consulting engineers Gifford of Southampton to look at a specific area of concern under the main covered walkway around the main facade entrance. This inspection was carried out yesterday. It has been established that at least five trusses have ‘failed’ in this area. Our consultant is of the opinion that it is unsafe to allow large numbers of people onto the Pier. This area provides the only method of access onto and off the Pier. Any emergency affecting the rest of Pier, including the ballroom, requiring evacuation would mean crowds of people walking over the area where we have been specifically advised that crowds are unsafe. As a result the council has had no option other than to use its emergency powers to close much of the Pier immediately.”
“… the motivation for the local authority’s closure of the pier to the public on16 June 2006 was the likelihood of large crowds accessing the pier on and after 17 June for reasons unconnected with [Stylus’] business. As at16 June 2006 [Stylus] had not incurred liability to any member of the public for breach of theOccupiers’ Liability Act 1957 . Nor can I see any basis for saying that [Stylus] had committed any breach of the statutory duties which it owed to its employees under the Health and Safety at Work etc Act 1974 ...” (paras 91-92) In his view, the default proviso was the “control mechanism which eliminates claims that are unacceptable on grounds of public policy”
“95. Having said that, I do accept that the structural condition of the pier will be relevant to the quantum of the claim. The local authority will be entitled to argue in the arbitration due to be held under section 106(2) that the loss of profit caused by the local authority’s conduct must be substantially reduced by reason of the structural condition of the pier. Indeed the local authority would be entitled to argue that the quantum is reduced Page 11 to nil, although on the evidence which I have seen that outcome seems unlikely.”
“In my opinion the act, default, or sufferance referred to insection 94 of the Public Health Act 1875 , is an act, default, or sufferance related to the nuisance which it is sought to abate, and default no less than sufferance within the meaning of that section can occur without the breach of an obligation arising from contractual agreement.”
“… in the case of a natural stream a landowner had no duty at common law to keep the bed clear by removing obstructions which might arise from natural causes, and the proviso to (section 259(1)) was designed to prevent any additional duty from being cast on the landowner …”
“I do not think that in this case ‘default’ could mean merely doing nothing, unless an obligation to do something were imposed by the Act. There was no act of the defendants which caused the obstruction either to arise or to continue … In the present case, on the facts found by the justices, there is nothing to show that the defendants did anything which caused this obstruction to arise or to continue; nor do I think that there is anything which can properly be called a default on their part …”
“The provision does not require the court or the arbitrator to conduct a wide-ranging review of other legislation and the common law in order to see whether the claimant is in breach of any duties arising outside the 1984 Act.”