“(a) the claims which LFEPA brought against Halcrow in relation to the uncontrolled fire at The Firehouse on5 January 2005 as set out in paragraphs 271-275 and 279 in LFEPA’s amended Particulars of Claim re-served on30 June 2005 including, for the avoidance of doubt, any claims by LFEPA against Halcrow for fees paid to Halcrow as part of the investigation of the fire post-5 January 2005 and (b) future claims in respect of defects in The Firehouse which were not apparent or could not with reasonable diligence have been discovered at the date of the settlement agreement.”
“1. It is the duty of an expert to help the court on the matters within his expertise. 2. This duty overrides any obligation to the person from whom he has received instructions or by whom he is paid.”
“14.3 Those instructing experts should keep experts informed of the progress of cases including amendments to statement of case relevant to the expert’s opinion. 14.4 If those instructing experts become aware of material changes in circumstances or that information within their control was not provided to experts they should without delay instruct experts to review and if necessary update the contents of their reports.”
“The consultant shall also assess the mechanical ventilation extract systems together with artificial smoke devices and materials for use within the scheme.”
“But where you get a situation which involves the use of some special skill and competence then the test as to whether there has been negligence or not is … the standard of a skilled man exercising and professing to have that special skill. A man need not possess the highest expert skill; it is well established law that it is sufficient if he exercises the ordinary skill of an ordinary competent man exercising that particular art. I do not think that I quarrel much with any of the submissions in law which have been put before you by counsel. Mr Fox-Andrews put it in this way, that in the case of a medical man, negligence means a failure to act in accordance with the standards of reasonably competent medical men at the time. That is a perfectly adequate statement so long as it is remembered that there may be one or more perfectly proper standards; and if a medical man conforms with one of those proper standards then he is not negligent.”
“… put a party who has been injured or who has suffered in the same position as he would have been if he had not sustained the wrong.”
“Damages are designed to compensate for an established loss and not to provide a gratuitous benefit for an aggrieved party from which it follows that the reasonableness of an award is to be linked directly to the loss sustained. If it is unreasonable in a particular case to award the cost of reinstatement it must be because the loss sustained does not extend to the need to reinstate.”
“42. To award the plaintiffs the cost of reinstatement, theoretical or not, if it is intended thereby to put them in the same position as they would have been if the fire had not occurred insofar as money can, can also be reasonable. As between themselves and the defendants one must at least be able to contemplate the possibility if not the probability that the plaintiffs were indeed minded to rebuild their billiard hall and shops.”
“Ruxley also supports the proposition that, although what a claimant does with any damages he receives is irrelevant, his intention to reinstate or not to reinstate, while not conclusive, is relevant to the question whether it would be reasonable to reinstate the property – see Lord Jauncey at page 359C-D and Lord Lloyd at pages 372-373; see also for example the passage from the judgment of Sir Robert Megarry VC in Tito v Waddell No.2[1977] Ch 106 at 132 …”
“It is submitted that the contractual measure of damages for failure to review a design where a claim in respect of the original design obligations is Statute barred should be such as to put a claimant into the position that he would have been in if the design had been properly reviewed. Thus if the failure to review occurred after practical completion a claimant should be obliged to give credit for the (possibly substantial) costs which would have been incurred at that stage in correcting the design.”
“The Authority intends to extend its training facilities at its Southwark Training Centre by providing a firehouse building and associated drill tower on part of the Centre’s No.1 drill yard. The Firehouse building and associated drill tower is a structure providing facilities for recruits and firefighters to develop, maintain and improve their skills in using fire service equipment. This will be undertaken in conditions which simulate operational working conditions (including real fire) in a safe, controlled training environment. Exercises may be of a set programme or varied by prior arrangement by the trainers and the results monitored and recorded. The exercises are to be carried out in increasingly stressful conditions of heat, smoke, fire, water and resulting humidity and steam. They are also designed to be undertaken in a variety of internal spaces which may need adaption as required for the particular exercise. This is required so that students do not become familiar with the building and their approach to any exercise ‘incident’.”
“Although HGa as a company does not have specific experience in designing firehouses, the members of the team have considerable and relevant experience in the issues that need to be addressed in the design of firehouses and other similar projects that require a high level of operator interaction with a process in a hazardous environment. “The team that HGa have drawn together represents expertise at its highest levels in each of the technology areas concerned … It is extremely unlikely that such expertise would be available purely from within a single entity.”
“Accordingly, except as expressly provided for in the conditions neither party shall be obligated or liable to the other in respect of any damages or losses suffered by that other which arise out of under or in connection with the Contract or the Works whether by reason or in consequence of any breach of contract or of statutory duty or tortuous or negligent act or omission.”
“Neither the contractor nor the purchaser shall be liable to the other by way of indemnity or by reason of any breach of the contract or of statutory duty, (including but not limited to negligence) for any loss of profit, loss of use, loss of production, loss of contracts or for any financial or economic loss or for any indirect or consequential damage whatsoever that may be suffered by the other.”
“The Contractor shall be responsible for making good by repair or replacement with all possible speed at his expense any defect in or damage to any part of the Works which may appear or occur during the Defects Liability Period and which arises either: (a) from any defective workmanship or design or (b) from any act or omission of the Contractor done or omitted during the said period.”
“2.iii) Artificial smoke is to be used in The Firehouse. It will provide realistic training conditions but as a liquid it will not behave as the carbonaceous particulate smoke created by fires in a house or light industrial premises that The Firehouse represents. It burns off at a temperature of 80 to 100 degrees C depending on the product selected.”
“HGa wil concentrate on artificial smoke that burns off at 180⁰C”
“The contractor must ensure that all the equipment provided as part of this contract is capable of withstanding the conditions of extreme heat, steam, water from a jet to a fire spray, humidity, foam and flame etc that is likely to occur as well as Water hoses … Breathing apparatus, air cutting cylinders and similar.”
“Ducted supply and exhaust air shall be installed as indicated in the tender drawings. These are diagrammatic and show the philosophy and intended routing. The contractor will provide installation drawings based on those drawings … From the supply plenum, ducted fresh air is provided to each of the smoke/heat zones as well as the fire rooms. Attenuation is provided on each supply duct with smoke generators and zone heaters (both free issue) installed duct mounted for each smoke/heat zone. For the fire rooms in duct mounted smoke generators (free issue) are to be installed.”
“Sealants, joints and materials shall be as specified in DW/142. Where the required temperature rating for sealants, joints and materials exceed those in DW/142 the contractor shall submit with his tender full details together with the type of sealant, joints and materials for temperature ratings within DW/142.”
“All ductwork and connections shall be adequately braced and stiffened where necessary to prevent sagging, drumming and vibration and shall be completely airtight.”
“All site joints for metal ductwork other than flanged joints shall be properly swaged plain slip type with the inside lap in the fire detector airflow and shall be riveted or jointed with self-tapping screws at not more than 60 mm centres. All such joints shall be sealed and rendered airtight with a suitable sealant.”
“Access openings shall be provided in the ductwork at suitable positions for the purpose of inspection and servicing of plant and equipment. They shall be rigidly framed with airtight covers designed for easy removal and replacement … Access panels shall be of 1.2 mm thick galvanised sheet steel with a 25 mm by 6 mm thick approved sealing gasket fixed around the edge with suitable adhesive to form an airtight seating against the duct frame …”
“The test shall be maintained for a period of 15 minutes during which period the aggregate leakage shall not exceed 1 per cent of the total design flow rate. Any leakage must at once be made good before proceeding with tests on the next section of the ductwork.”
“By choosing from the range of options permitted by HGa’s specification LS was able to fabricate an appropriate ductwork system for The Firehouse.”
“1. Design is not included in your scope of works. You are, however, required to carry out elements of design development in turning diagrammatic tender drawings into fabrication/workshop drawings. 2. Selection of equipment is not design … It is the contractor’s responsibility to select the ductwork to comply with the specification. 3. Although the specification calls for low and medium temperature ductwork to be DW/142 there are a number of options, e.g. cross joints. DW/142 does not indicate manufacturers of sealants or gaskets. These need to be confirmed by the contractor. The suitability of the equipment, e.g. the amount of expansion in the joints that can be accommodated can only be provided by the manufacturer.”
“that there is no concise record of the interpreted requirements and the way in which each is to be met by the facilities provided. There is hence no clear “approval of these by [the Authority]”
“Shortcomings in the level of definition of the design process, the appropriateness of design methods used and the certainty of the results”
“2.2 Second Stage Review A resolution of the questions relating to the adequacy of the facilities provided awaits a clear and final definition of the ways in which the facility will be used. This must come from the client. The actual performance of the facility under these operating conditions now becomes an issue for testing and a proper documented basis for this must be developed and agreed.”
“The experimental results indicate that when these smoke generators are properly maintained and used in the prescribed manner under the conditions prevailing during the course of these trials there is little risk of the formation of flammable atmosphere, except possibly in the immediate vicinity of the nozzle. When a smoke generator similar in type to those used in the trials was run for long periods in a small enclosure in a laboratory experiment, concentrations exceeding 100% LEL (lower explosive limit) were detected but such conditions are unlikely to occur in any practical application of these devices.”
“This paper concluded that for droplets (of Ondina oil) below 0.014 mm, (i.e. 14 microns) that due to heat transmission these drops have time to vaporise completely before the flame front reaches them and combustion occurs. Thus they exhibit flammability characteristics essentially the same as the fully vaporised material. As the smoke house concentrations are well below the lower flammable limit, these smoke mixtures should not explode.”
“Both these approaches suggest ‘the smoke atmosphere will not present a flammable hazard’.”
“Halcrow stated that there is a problem with duct work joints and the FH (Firehouse) had experienced leaking of smoke in some rooms. It is believed to be gasket and we don’t know if the gaskets are failing due to the heat or the oil ...”
“15.2 Failed joint sealant visible on some dropper ducts and in plant room. Insufficient flange clips provided cf manufacturers recommendations.”
“1. Lorne Stewart’s ductwork was required to be based on ductwork specification DW/142 which only requires access doors to be provided for access to control dampers. A number of access doors were included in their price for the revised ductwork and these, together with additional instructed access doors have been installed …”
“As stated in our letter to you dated24 October 2003 please rectify all failed joints and other joints that do not comply with the specification ...”
“The documents include ICS statements that the panels would have a life of at least five years … office room panels are showing signs of deterioration within 6 weeks of being replaced. The ceiling installation is also leaking excessively resulting in heavy smoke staining and soot deposits in the ceiling void. A reasonable ceiling integrity is essential to limit temperatures within the ceiling void … We are more concerned that the lack of performance of the Westemp panels suggests that the panels are not suitable for the application.”
“15.2 Lower temperature ductwork and failed joint sealant in plant rooms and insufficient flange clips provided c.f. manufacturers’ recommendations.”
“In the light of experience gained so far with the ventilation system we strongly recommend that oil drainage is also installed to the supply air ductwork in the plant rooms for which we are currently producing a design.”
“It is believed that the fire was external to the zone duct and the medium being condensed smoke oil which had leaked into the duct work insulation through the failed joint …”
“3. Oil leaking down onto smoke injection probe which is directly connected to the smoke generator heater block … and is surrounded by thermal insulation … It is therefore possible that oil migrating through the thermal insulation and reaching the outside of the probe could be the cause of the fire.”
“At the time of preparing his specification for the ductwork I would expect HGa to have recognised that a film of liquid oil would be deposited on the inside of the ductwork caused by the oil based smoke passing over the ductwork surface. By a ‘film’ I mean a light surface coating of oil such that a finger run over the inside surface of the ductwork would feel oily. I would not expect HGa to have predicted that liquid oil deposits would be in excess of a film nor that the quantity of oil would be sufficient for the oil to flow, because it is not self evident that such quantities of oil will be deposited.”
“This specification is not intended to apply to ductwork handling air which is polluted or is otherwise exceptional in respect of temperature or humidity (including saturated air) nor is it suitable for ductwork exposed to a hostile environment, e.g. contaminated air, off-shore oil rigs etc. The design, construction, installation, supports and finishes in such cases should be given special consideration in relation to the circumstances of each case. This specification is also not intended to apply to domestic warm air installations.”
“The specification identifies that the ductwork contains oil smoke and it is obvious on the face of it that any materials within the ductwork system are going to be in contact with the smoke-oil and therefore should be suitable for it.”
“Concept Engineering submitted to Halcrow project representative (Dr R A Cox) data supporting the general safety of their smoke-oil system. The data-pack contained several technical summaries which addressed the use of flammability and toxicity. This included a review by the HSE Research and Laboratory Services Division by Dr J J Smeed in 1982. With respect to flammability their assessment concluded: ‘The experimental results indicate that when smoke generators are properly maintained and used in the prescribed manner under the conditions prevailing during the course of these trials, there is little risk of the formation of a flammable atmosphere except possibly in the immediate vicinity of the nozzle. When a smoke generator similar in type to those used in the trials was run for long periods in a small enclosure in a laboratory experiment, concentrations exceeding 100 per cent LEL (lower explosion limit) were detected but such conditions are unlikely to occur in any practical application of these devices’.”
“(a) 12 months calculated from the date of taking over the Works under Clause 29 (Taking Over), or (b) 12 months calculated from the date of replacement or rectification to the Engineer’s satisfaction of the defect in that section or part of the Works whichever is the later. …”
“The Defects Liability Period shall be extended by a period equal to the period during which the works (or that part thereof in which the defect or damage to which this Clause applies has appeared or occurred) cannot be used by reason of that defect or damage.”
“If any such defect or damage be not remedied within a reasonable time the Purchaser may proceed to do the work at the Contractor’s risk and expense provided that he does so in a reasonable manner and notifies the Contractor of his intention to do so. The cost reasonably incurred by the Purchaser shall be deducted from the Contract Price or be paid by the Contractor to the Purchaser.”
“The Contractor’s liability under this Clause shall be in lieu of any contract term implied by law as to the quality or fitness for any purpose or the workmanship of any part of the Works taken over under Clause 29 (Taking Over) and save as expressed in this Clause 36 neither the Contractor nor his sub-contractors, their respective servants or agents shall be liable whether in contract, in tort, (including but not limited to negligence) or by reason of breach of statutory duty or otherwise, in respect of defects in or damage to such part or for any damage or loss of whatsoever kind attributable to such defects or damage or any work done or service or advice rendered in connection therewith.”
“For the purpose of this sub-Clause the Contractor contracts on his own behalf and on behalf of and as trustee for his sub-contractors, servants or agents. Nothing in this Clause 36 shall affect the liability of the Contractor under the Conditions in respect of any part of the works not taken over ….”
“In all cases the party establishing or alleging a breach of contract or a right to be indemnified in accordance with the contract shall be under a duty to take all necessary measures to mitigate the loss which has occurred provided that he can do so without unreasonable inconvenience or cost.”
“… Neither the Contractor nor the Purchaser shall be liable to the other by way of indemnity or by reason of any breach of contract or of statutory duty (including negligence for any loss of profit, loss of use, loss of production, loss of contracts or for any financial or economic loss or for any indirect or consequential damage whatsoever that may be suffered by the other.”
“What does one mean by ‘direct damage’. Direct damage is that which flows naturally from the breach without intervening causes and independently of special circumstances while indirect damage does not so flow. The breach has brought it about but only because of some supervening event or some special circumstances unknown to the seller. In my judgment the words ‘indirect’ or ‘inconsequential’ do not exclude liability from that which is prima facie recoverable: that is do not exclude liability for damages which are the direct and natural result of breaches complained of.”
“(iv) The Seller will be liable for any loss damage costs or expense incurred by the Purchaser arising from the supply by the Seller of any such faulty goods or materials or any goods or materials not being suitable for the purpose for which they are required save that the Seller’s liability for consequential loss is limited to the value of the contract.”
“I do not see why the clear meaning and effect of condition 44.4 should be cut down. If parties want to limit their potential liability to one another in the manner provided by condition 44.4 there is no reason why the law should stand in their way and prevent them from doing so.”
“Please rectify all failed joints and other joints that do not comply with the specification…”
“Our inspection revealed that considerable amounts of oil were evident in Zone 3 bedroom, lagging of supply air ducts within the plant room and in rockwool insulation which had been used around ducting and services where they penetrated through the plant room walls at high levels.”
“The most likely source of the oil contamination on the rockwool insulation was leakage of oil (either as a vapour or a liquid) through the joints in the ducts used to carry the oil vapour. This theory was supported by the observation that oil contamination was usually heavier on the upper layer of the rockwool insulation and was also heavier in the vicinity of ducts. In some areas there may have been a contribution from natural condensation of the smoke oil on metal surfaces (as observed on the Durasteel panelling). However this would have been unlikely to have caused the saturation of the insulation observed in some area.”
“4.1 The most likely cause of the fire above the ceiling of the Office scenario room of The Firehouse at Southwark Training Centre appeared to be the initiation of thermal oxidation in the oil contaminated rockwool insulation above the Westemp panels.”
“Your assistance will be required primarily in relation to the variations, delay and defects claims. In the first instance, however, you will be required to assist in advising the Authority on remedial works and possible re-design in relation of [to?] problems it has become aware of following the fire at The Firehouse on5 January 2005 .”
“Halcrow stated that oil leaking from the ducts and ignited by soot ‘sparks’ was in their opinion the cause of the fire … Halcrow recommended, as well as carrying out the remedial work to seal the ducts, improvement could also be carried out to the Westemp design and the installation workmanship in order to minimise the soot ‘sparks’ passing through the Westemp panels although this would be an enhancement to the original specification.”
“Halcrow reconfirmed that the remedial work required to the ducts was a contract defect which was already on the defect list and is work which Lorne Stewart is required to complete.”
“Following our discussions and expert advice, we confirm that it is now apparent that oil leakage is brought about by an inappropriate specification for the supply and extract of the oil-laden smoke. It is therefore not feasible to carry out any further work in this respect unless and until the specification is suitably amended.”
“(1) RE (Mr Evans) summarised the options for repair are to replace all supply ductwork with either welded lightweight stainless steel and use existing smoke oil system or discard use of supply ducts and add local smoke generators in each fire room or find an acceptable method to reseal existing ducts (Halcrow’s proposal to seal ducts and use of chemical smoke were concluded as unacceptable. (4) RE is to invite a competent contractor asap to view the installation and advise on resealing the existing ducts and also installing new stainless steel ducts.”
“Rob, When determining the remedial work necessary to put the fire places back on the run we should consider the problem the Training Team raised before Christmas that the cosmetic smoke injected into the fire rooms did not give realistic conditions, due to the heat the smoke hung at low level, allowing trainees to see over the top.”
“From discussion with you last autumn (i.e. 2004) we were aware that generated smoke did not give realistic conditions and hung at low level, allowing trainees to see over the top. This concern was conveyed to the consultant at the time and with the fire has faded from the discussions. I have emailed the consultant to bring back into discussions as modifications may be necessary within the work we will be required to carry out as a consequence of the fire. I am not aware whether this will be a minor or major change to the generation of smoke. Can you please put on paper what exactly is and is not happening, as I expect a response from the consultant to my email below (to Mr Tough).”
“In any fire situation smoke builds from the ceiling or highest point in any structure as there is a build up of unburned gas and products of combustion, the smoke thickens and the visible space between the base of the smoke to the ground (this is referred to as the neutral plane) gets lower to the ground reducing the neutral plane. The fire-fighting tactics are to pulse spray small quantities of water into this cloud to cool any unburned gas so as to prevent it from igniting. This is done beneath this cloud with the Firefighter crawling in the clear space of the neutral plane. The Firehouse failed to recreate those conditions as the neutral plane is between the top of the smoke and the ceiling. This is because the temperatures at ceiling height are greater than the temperature of the smoke. It forces people to want to stand up and look over the smoke, this reinforces negative learning, would be a dangerous practice if carried out at a real incident or carbonaceous facility and it does not simulate realistic conditions of how a fire would develop in a confined space.”
“LFEPA to advise on smoke performance acceptability but nothing can be done about burn-down of oil mist in fire rooms although it is less when rooms run cooler.”
“’Remedial Works’ In order that The Firehouse can be retained to the full range of training activities, it is deemed necessary to replace the supply smoke ductwork with a fully welded and flanged system compliant with HVCA/DW/171 tested to zero leakage and with adequate provisions for oil drainage. It will also be necessary to clean, re-seal with an oil-proof sealant and add drains to the Durasteel extract ductwork, replace the fire damaged wiring, IT, control and communications cabling above the fire room 4. It will also be necessary to inspect, replace and re-seal the ‘Westemp’ panel suspended ceilings throughout the building, add heat shields above all of the propane burners and re-commission all of the systems.”
“ 1. No smoke is required in the four fire rooms. 2. Local smoke generators are to be provided to the heat and smoke zones as indicated on the drawings prepared by Training March 06 (Mr Richards).”
“2. Oil based smoke is acceptable as understood to be the only known method available that will maintain smoke at the temperatures required in the heat zones. See anticipated stratification resulting from the use of smoke oil is accepted by Training. 3. Smoke to the heat zones will be from local smoke generators and the consultant (Jacobs) is to investigate the options of locating within the heat zones or externally outside The Firehouse. 4. Training no longer require smoke to be provided in the four fire rooms and consider that the steam created from water action on hot burners produces sufficient realism of smoke for fire training. 5. Training in the event of requiring smoke in the four fire rooms during cold training will used water based smoke generator mobiles.”
“Following from the fire within The Firehouse Jan 05 opportunity resulted to correct any unacceptable facilities which had been provided as part of the original design and for this work to be carried out as part of the fire repair works. The smoke generation was reviewed with Training and Development.”
“T & D confirmed that smoke will not be required in the four fire rooms and presented drawings indicating the heated zones and non-heated which will require smoke. It is accepted that appropriate smoke to be provided in the heated areas is likely to be oil based as the maximum temperature requirement is 80◦C. In the non-heated areas Jacobs will determine if the smoke will be oil or chemical based. Jacobs are instructed to proceed with the development of T & D’s current requirements for review at 24/25 April meetings, and to consider T & D’s current requirements as part of an alternative option study.”
“(c) None of the above adjustments affected the overall objectives and outcomes required for each training scenario.”
“5.1 Remove hot smoke making ability in all fire rooms as it is not possible to recreate realistic neutral plane conditions in fire compartments. There would be greater benefits for students if no smoke is present on arrival at fire rooms. This would enable the training team to concentrate on students’ firefighting techniques, an essential part of RFT (Real Fire Training) strategy. Those applied techniques would determine how much steam is generated and the subsequent worsening of conditions to fire fighters without measured water application methods. The removal of hot smoke in these areas will also speed up the daily start process for The Firehouse. 5.2 Use of portable or fixed local cold smoke generators for fire rooms that can be used in the absence of fires. Occasionally crews are required to work in or travel through these areas en route to scene of operations. The ability to create smoke in these areas at these times would be beneficial. 5.3 Use of portable or fixed local cold smoke generators in selected areas of Firehouse. This will speed up the daily start process for The Firehouse.”
“6.1 With much of the training outcomes being reinforced during knowledge input, the above suggested changes will have no effect on achieving the desired training objectives and outcomes.”
“The steel ductwork had gaps at some transverse joints and around access panels. It is not clear if these existed before the fire but we suspect that there was some leakage in these areas. The longitudinal joint method may not be suitable for ducts required to contain fumes laden with mineral oil. We have concluded that although the systems were generally suitable to resist the fire conditions, the Westemp wall and ceiling systems and the steel ductwork were not adequately smoke tight in fire conditions. This has resulted in a build up of mineral oil on all internal and external surfaces of the ductwork and on the framework of the wall and ceiling systems. The rock mineral wool also appeared to have oil deposits. In our opinion the fire within the ceiling void was started by the mineral oil igniting at one or more hot-spots on the upper surface of the ceiling. The hot-spot(s) may have been caused by the Westemp cover strips being too thin or cracked or by gaps between the ceiling panels and the cover strips. In our opinion it would not be possible to carry out remedial work on the existing Westemp and steel ductwork systems to prevent a similar fire starting in the future, particularly in those areas around the fire source. It may be possible to develop a suitable system based on a continuous steel skin protected by insulating boards such as the Westemp panels and ceramic blanket, but we are not aware of any access panel system that would remain smoke tight after repeated exposure to temperatures much greater than 100◦C. In the heat and smoke room areas we are of the opinion that the Durasteel-based system is suitable, possibly with steel cover strips bedded on a suitable mastic or gasket over all joints. The design of any access panel would have to incorporate a suitable heat-resisting compressible seal.”
“4.3 Siting of Smoke Generators - Recommendations Heat and Smoke Areas The siting of smoke systems locally within Training Rooms or Training Zones (combination of Rooms) would be a practical solution in the heat and smoke areas where a compartment temperature of 80◦C is expected. Smoke systems could be mounted discreetly on the compartment walls, offered environmental protection from the high compartment temperature and be individually controlled from the control room … Fire Rooms For the Fire Rooms we would recommend if smoke were required, that it be introduced into the Fire Rooms via dedicated smoke ducting (75-100 mm id) into which smoke would be introduced via a centrifugal fan. This smoke could then be concentrated between the entry door(s) and the fireplace, giving the smoke the greatest chance to establish itself and form an effective training tool. It would not be practical to site the smoke generators locally within the Fire Rooms themselves.”
“Based on a number of site inspections at the London Firehouse, Southwark, we have concluded that the Westemp ceiling and wall systems installed were not suitable for use with the type of oil based smoke used. In our opinion remedial work on the existing system would not be successful and it would be difficult to develop a suitable system that could remain smoke and fume tight at such temperatures. In our opinion the most likely type of steam to be successful would be based on a sealed steel liner protected on the fire side by a combination of ceramic blanket and calcium silicate board. Any new system would require further development work and testing in co-operation with the manufacturer. “In those areas where the temperatures are about 450◦C or lower the Durasteel based systems would be suitable in our opinion with some modifications to ensure joints are adequately sealed, including those around the perimeter of the wall and ceiling linings. “An improved access panel also needs to be developed and cavity barriers should be added within the wall and ceiling voids.”
“LFEPA have not instructed the appointment of a Firehouse design expert or a fire risk assessment expert as Jacobs had recommended and on the instructions of LFEPA Jacobs had stopped work on the project. Jacobs had already expressed its reservations about progressing the Project because of its concerns regarding the underlying design.”
“Can we re-instate all Fire Rooms in The Firehouse except Office for all types of cold training which will include use of cosmetic smoke and water? I envisaged the majority of use would be dry and smoke training. However if crews are moving through these areas with firefighting media there is always the chance that accidental water application will take place.”
“I thought that all recommissioning work was on hold until we have a clearer view of the results of the mediation/litigation.”
“GLA are asking about The Firehouse for their draft Capital plan because it is in our budget report’s Capital programme as ‘To be determined’ – Can I ask them to take it out altogether?”
“We’ll discuss with Barbara (Riddell) tomorrow. It is NOT recommended to remove this project from the Capital programme. I am sure that Fiona (Laurence) will also confirm this recommendation.”
“2. The flanges should be full faced stainless steel flanges welded to the ductwork, bolted and sealed with oil resistant gaskets with a temperature rating of not less than 100◦C. 6. The ductwork should be pressure tested in accordance with DW/144 to 0/minimal leakage at high pressure class C.”
“Having agonised over the issues raised by Jacobs’ advice and having reviewed our revised quantum advice in the scheme from Mr Wort and having had numerous discussions within the Authority, we took the decision that we should at this stage simply press on with the litigation in order to see what we are able to obtain by way of compensation. Once we know what we have recovered and how much we have to spend we can then review the options open to us and take a view as to what remedial scheme should be implemented.”
“For health and safety reasons it is thought that smoke production in these rooms is inadvisable.”
“2. Westemp insulating panels have been used for lining the walls and ceilings; these were not adequate for the purpose and as a result have cracked and/or now show other damage. Alternatively the panels were damaged in the course of installation; “5. Halcrow failed to design the ceiling adequately or alternatively failed to supervise the work of the contractors in relation to the ceilings such that smoke and propane can access the ceiling voids (in particular above the garage flashover).”
“3.18 If the temperature of the Westemp panel was to reach for example 400 to 500 degrees C due to its proximity to a burner the temperatures within the lower levels of the insulation above the panel could reach 200 to 300 degrees C (or higher). The temperature would be more than sufficient to initiate an oxidation reaction in oil soaked insulation and lead to a fire several hours later. 3.21 … high concentrations of oil in an area above the Westemp panel where the temperature was high enough may have undergone thermal oxidation leading to ignition. This progressive process could have taken a considerable period of time and in my opinion had probably started when The Firehouse was first commissioned and put into full operation. 4.1 The most likely cause of the fire above the ceiling of the Office scenario room of The Firehouse at Southwark Training Centre appeared to be initiation of thermal oxidation in the oil-contaminated rockwool insulation above the Westemp panels.”
“8.38 It is therefore most likely that the process of thermal oxidation was initiated when sufficient radiated heat has passed through the Westemp panel to start an oxidation reaction in the oil-soaked installation which led to the fire several hours after The Firehouse had last been used.”
“Future smoke contamination avoids leading to a potential fire hazard as described in Technical Consideration Constraints Table, page 2 of 4. The Westemp system does not provide a barrier to the passage of smoke and gases into the voids. Proprietary systems that meet the overall performance specification required for this application are not readily available and a customised solution would need to be developed and tested to prove its suitability for the purpose. It is not certain that a practical and technically viable viability system could be developed within acceptable timescale and cost.”
“Oil contamination of the base wood through long term use of oil-based smoke in this area represents a potential fire hazard. The existing condition of the loft room fabric would need to be assessed by a suitably qualified and experienced expert and a scheme for the treatment of the fabric developed. An acceptable maximum level of surface oil contamination for ongoing operations would need to be determined. A practical cleaning methodology would need to be developed. Given the difficult geometry of the construction, this may prove difficult to achieve. ”