“Warranted trading from 15/3/06 until 31/10/06 BDI in territorial waters of Madagascar; not north of Mahajanga, not south of Toulear. Warranted laid up from 1/11/06 until 28/2/07 BDI in port of Mahajanga, but liberty to carry out one round trip to Diego Soares (during the lay up period) for drydocking.”
“4. On the25th December 2006 the vessel was lying at anchor in a laid up condition at Mahajanga (Majunga), Madagascar. At about 1430 hours the cyclone ‘Bondo’ reached the port bringing with it rough seas and strong winds. At about 1515 hours, under the influence of the weather, the vessel started to drift from her anchorage inland towards Mahajanga. A second anchor was dropped and the master tried unsuccessfully to contact local authorities for assistance. The vessel continued to drift under the force of the weather until she hit the quayside at the port, initially with her bow and then with her port side. The vessel also repeatedly touched bottom. 5. At about 1630 hours, as a consequence of distress calls made by the master on the vessel’s VHF, the vessel ‘SAINT RAPHAEL’ arrived and with the use of a heaving line device was able to tow the vessel away from the quay. At 1800 hours the vessel was safely moored. 6. As a result of the matters aforesaid the vessel suffered damage, her rudder became misaligned and her right anchor was lost and the Claimant was put to costs of€253,842.54 plus VAT OF€29,784.53 .”
“I am attaching to this report, as examples, the ‘Guidelines for the Lay-Up of Ships’ issued by Det Norske Veritas (‘DNV’) and the China Classification Society (‘CCS’), both members of IACS, … to which I will refer herein. I should mention that I was not able to find any similar guidelines issued by the HRS (which is not an IACS member) but believe that they would apply similar standards, which are industry wide.”
“In this lay-up condition, the machinery is kept in operation for the sake of fast recommissioning, but measures may be taken to reduce various operational costs.”
“In cold lay-up condition, the machinery is taken out of service, and the vessel is kept electrically dead with the exception of emergency power. This condition usually implies three weeks commissioning time or more, depending on the level of preservation and maintenance during lay-up. The level of preservation is mainly decided based on the age and value of the ship and the most likely recommissioning scenario.”
“In a time policy, there is no implied warranty that the ship shall be seaworthy at any stage of the adventure, but where with the privity of the assured the ship is sent to sea in an unseaworthy state, the insurer is not liable for any loss attributable to unseaworthiness.”