“(a) the provisions of the development plan, so far as material to the application… (b) any local finance considerations so far as material to the application, and (c) any other material considerations.”
“If regard is to be had to the development plan for the purpose of any determination to be made under the planning Acts, the determination must be made in accordance with the plan unless material considerations indicate otherwise.”
“Section 18A [the parallel provision in Scotland] has introduced a priority to be given to the development plan in the determination of planning matters…… By virtue of section 18A the development plan is no longer simply one of the material considerations. Its provisions, provided that they are relevant to the particular application, are to govern the decision unless there are material considerations which indicate that in the particular case the provisions of the plan should not be followed. If it is helpful to talk of presumptions in this field, it can be said that there is now a presumption that the development plan is to govern the decision on an application for planning permission….. Thus the priority given to the development plan is not a mere mechanical preference for it. There remains a valuable element of flexibility. If there are material considerations indicating that it should not be followed then a decision contrary to its provisions can properly be given. Moreover the section has not touched the well-established distinction in principle between those matters which are properly within the jurisdiction of the decision-maker and those matters in which the court can properly intervene. It has introduced a requirement with which the decision-maker must comply, namely the recognition of the priority to be given to the development plan. It has thus introduced a potential ground on which the decision-maker could be faulted were he to fail to give effect to that requirement. But beyond that it still leaves the assessment of the facts and the weighing of the considerations in the hands of the decision-maker. It is for him to assess the relative weight to be given to all the material considerations. It is for him to decide what weight is to be given to the development plan, recognising the priority to be given to it. As Glidewell J observed in Loup v Secretary of State for the Environment (1995) 71 P & C.R. 175, 186: “What section 54A does not do is to tell the decision-maker what weight to accord either to the development plan or to other material considerations.”
“17. Within the overarching roles that the planning system ought to play, a set of core land-use planning principles should underpin both plan-making and decision-taking. These 12 principles are that planning should: … • take account of the different roles and character of different areas, promoting the vitality of our main urban areas, protecting the Green Belts around them, recognising the intrinsic character and beauty of the countryside and supporting thriving rural communities within it; …” “79. The Government attaches great importance to Green Belts. The fundamental aim of Green Belt policy is to prevent urban sprawl by keeping land permanently open; the essential characteristics of Green Belts are their openness and their permanence. 80. Green Belt serves five purposes: • to check the unrestricted sprawl of large built-up areas; • to prevent neighbouring towns merging into one another; • to assist in safeguarding the countryside from encroachment; • to preserve the setting and special character of historic towns; and • to assist in urban regeneration, by encouraging the recycling of derelict and other urban land.” “87. As with previous Green Belt policy, inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. 88. When considering any planning application, local planning authorities should ensure that substantial weight is given to any harm to the Green Belt. ‘Very special circumstances’ will not exist unless the potential harm to the Green Belt by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations. 89. A local planning authority should regard the construction of new buildings as inappropriate in Green Belt. Exceptions to this are: ….. 90. Certain other forms of development are also not inappropriate in Green Belt provided they preserve the openness of the Green Belt and do not conflict with the purposes of including land in Green Belt. These are: …… ”
“23. In R. (on the application of Jones) v Mansfield District Council [2004] Env. L.R. 21 Carnwath L.J., as he then was, emphasised (in paragraph 58 of his judgment) that “the EIA process is intended to be an aid to efficient and inclusive decision-making in special cases, not an obstacle race”, and that “it does not detract from the authority's ordinary duty, in the case of any planning application, to inform itself of all relevant matters, and take them properly into account in deciding the case.” 24. In R. (on the application of Bateman) v South Cambridgeshire District Council [2011]EWCA Civ 157 Moore-Bick L.J. said (in paragraph 20 of his judgment) that it was important to bear in mind “the nature of what is involved in giving a screening opinion”
“66. It is common ground that the analysis in paragraph 20 of the judgment of Moore-Bick LJ in R (Bateman) v South Cambridgeshire District Council[2011] EWCA Civ 157 continues to apply to the screening process under the 2011 Regulations (Mackman v Secretary of State for Communities and Local Government[2015] EWCA Civ 716 ; [2016] Env. L.R. 6 at paragraph 7). A screening opinion does not involve a detailed assessment of factors relevant to the grant of planning permission; that comes later and will ordinarily include environmental factors. Nor does it include a full assessment of any identifiable environmental effects. It includes only a decision, almost inevitably on the basis of less than complete information, as to whether an EIA needs to be undertaken at all. The court should not impose too high a burden on planning authorities in relation to “what is no more than a procedure intended to identify the relatively small number of cases in which the development is likely to have significant effects on the environment.” 67. The issues of whether there is sufficient information before the planning authority for them to issue a screening opinion and whether a development is likely to have significant environmental effects, are both matters of judgment for the planning authority. Such decisions may only be challenged in the courts on grounds of irrationality or other public law error (R (Jones) v Mansfield District Council[2003] EWCA Civ 1408 ; [2004] Env L.R. 21 (paragraphs 14-18 and 52–55 and R (Noble Organisation Ltd) v Thanet District Council [2005] ECWA Civ 782; [2006] Env. L.R.8 paragraph 30).”
“…. There are features of the development which can only be said to have an adverse effect on the environment, and it is not legitimate to treat them as compensated for elsewhere. It follows that in my view if Mr Scott concluded that there were no adverse features, he erred in law and reached an irrational conclusion. If, as his evidence suggests, he was satisfied that the beneficial effects overrode the adverse effects, he erred because even on the assumption that the environmental statement need only be required where there are significant adverse effects, there is no principle which justifies such adverse effects being ignored or treated as nullified in some way on the grounds that they are outweighed by the environmental benefits of the project.”
“The proposal seeks to limit the harm to the openness of the Green Belt by placing buildings as close as possible to the edge of the settlement and limiting the building height to two storeys. The north and east sides of the site would be developed for school playing fields and thereby help to maintain an open character to this part of the site. Subject to careful consideration of siting, form and massing ….. of the proposed development in respect of the Green Belt, it is considered unlikely there would be any significant environmental effects.”
“…Although the overall size of the development is 17.2 ha, the area of built development will be less than 5 ha. The development is on the edge of a large residential area, bordering a rural area, it is therefore unlikely to cause any cumulation issues…. Although the development is within the Green Belt and must demonstrate special circumstances, it looks to keep buildings near other buildings and retain openness…. All other areas with environmental designations are a sufficient distance away so any significant inputs from the development are unlikely…. While the development may impact the landscape, this is considered to be minimal due to the siting of the buildings….”
“…. There are no scheduled ancient monuments within 1km of the site. A Heritage Impact Assessment should be provided to assess the potential impact upon heritage assets including listed buildings near to the site and archaeology within the site. Subject to the impact on heritage assets being properly assessed and any necessary mitigation implemented, it is considered unlikely the development would result in significant environmental effects.”
“The site is not in an area of archaeological importance. A heritage assessment (archaeological) was undertaken to support the January 2015 town planning assessment. This assessment considered that there was: • Very low to low potential for prehistoric archaeological potential • Very low to low potential for Roman archaeological potential • Low potential for Anglo-Saxon and early medieval potential • Very low to low potential for late medieval, post medieval and modern periods archaeological potential Research was undertaken by a university student studying archaeology who undertook some further investigations. The research raised potential questions about possible anomalies in the southern part of the site. As such it has been agreed that a geo-physical survey of the entire site and trial trenching will be required to uncover potential remains prior to the submission of a planning application. This will be undertaken over the next few months and the reports will be submitted alongside an updated desk-based assessment. This will fully assess the archaeological potential of the site.” • Very low to low potential for prehistoric archaeological potential • Very low to low potential for Roman archaeological potential • Low potential for Anglo-Saxon and early medieval potential • Very low to low potential for late medieval, post medieval and modern periods archaeological potential Research was undertaken by a university student studying archaeology who undertook some further investigations. The research raised potential questions about possible anomalies in the southern part of the site. As such it has been agreed that a geo-physical survey of the entire site and trial trenching will be required to uncover potential remains prior to the submission of a planning application. This will be undertaken over the next few months and the reports will be submitted alongside an updated desk-based assessment. This will fully assess the archaeological potential of the site.”
“7.6.2 There is evidence for prehistoric land use within the site. To the south there were a number of prehistoric features which together demonstrate a general background of activity over a long period between the Neolithic and the Late Iron Age/early Roman periods. This includes a scatter of flints which is suggestive of a knapping site. There is no discernible focus to this activity and no obvious settlement sites. However, to the north, set at a distance from this activity, was a small enclosure of potentially Middle Iron Age date. 7.6.3 A group of fourteen graves tentatively ascribed to the Anglo-Saxon period was discovered on the west side of the site. One of these has been excavated and is awaiting examination by specialists. These remains are likely to constitute an unenclosed cemetery belonging to a rural community. This is an important discovery as Anglo-Saxon cemeteries are rare in Hertfordshire, and no known Anglo-Saxon finds have been previously made in the vicinity of this site. ….. 7.6.5 The recorded archaeological remains survive below 0.26-0.52m of topsoil and, in places, subsoil deposits. It is judged that construction works such as excavation of foundation and service trenches, creation of roads, ground reduction and landscaping, and heavy plant movement will have the potential to adversely impact upon them.”
“Heritage Assets Archaeology 9.144 The archaeological site investigations discovered an unenclosed Saxon cemetery in the north-west corner of the site, an Iron Age enclosure in the northern part of the site, and Neolithic finds in the southern part of the site. The Saxon cemetery and Iron Age enclosure are not located within the building zone and are therefore not a risk of being directly impacted by the development. These remains will continue to form part of a pastoral landscape within an extensive area of meadow planting. 9.145 The proposal is to preserve the significant remains in situ by placing additional soils over the remains. The archaeological consultants submitted two separate method statements setting out how the archaeology would be conserved. The submitted proposals are not acceptable to the County Archaeologist as currently shown, however he would support preservation in situ provided that an acceptable methodology can be delivered. Historic England also confirms that the current proposals do not adequately show how the archaeology will be conserved. The County Archaeologist is able to recommend conditions to require further archaeological works prior to the commencement of development to ensure that the remains are not harmed. Evaluation 9.146 The application documents are sufficient to demonstrate significance of the heritage asset to inform decisions of how they should be treated. The proposed preservation in situ is regarded as the most sensitive way to conserve the Saxon cemetery. 9.147 In determining applications, local planning authorities should: ▪ require an applicant to describe the significance of any heritage assets affected, including any contribution made by their setting (Paragraph 128); and ▪ When considering the impact of a proposed development on the significance of a designated heritage asset, great weight should be given to the asset’s conservation. The more important the asset, the greater the weight should be. Significance can be harmed or lost through alteration or destruction of the heritage asset or development within its setting (Paragraph 132) 9.148 The condition requires further details to be submitted and further investigations to be carried out on site prior to the commencement of development, including excavations of a wider area surrounding the identified remains, and submission of a detailed methodology for preservation in situ, which will be assessed by the County Archaeologist and English Heritage prior to any scheme being agreed. The proposals have given due consideration to the significance of the heritage assets, and the archaeological remains will be properly preserved.”
“Archaeology 46. (A) No demolition/development shall take place/commence until an Archaeological Written Scheme of Investigation has been submitted to and approved in writing by the local planning authority in writing. The scheme shall include an assessment of archaeological significance and research questions; and: • The programme and methodology of site investigation and recording • The programme and methodology of site investigation and recording as required by the evaluation • The programme for post investigation assessment • Provision to be made for analysis of the site investigation and recording • Provision to be made for publication and dissemination of the analysis and records of the site investigation • Provision to be made for archive deposition of the analysis and records of the site investigation • Nomination of a competent person or persons/organisation to undertake the works set out within the Archaeological Written Scheme of Investigation. (B) The demolition/development shall take place/commence in accordance with the programme of archaeological works set out in the Written Scheme of Investigation approved under condition (46A) above; (C) The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the Written Scheme of Investigation approved under condition (46A) and the provision made for analysis and publication where appropriate. Reason: To ensure the archaeological remains are adequately protected in accordance with National Planning Policy Framework 2012 policies aimed at protecting the historic environment. 47. Preservation of Archaeological Remains in-situ – Mitigation Strategy Prior to the commencement of the development, a detailed mitigation strategy for the preservation in situ of the archaeological remains at the site shall be submitted to and approved in writing by the local planning authority. The mitigation strategy shall address: • the range in depth of the archaeology – the methodology must take this into account so that it is clear the proposed strategy will be suitable for shallow remains as well as those that are more deeply buried; • additional information regarding the loading pressure placed upon the underlying deposits during and after soil placement on top of the remains and the type of machine(s) used to carry out the works; • a method statement setting out clear working arrangements demonstrating how the operator(s) charged with carrying out the work will comply with the risk management strategy; • management plan – setting out how the area of the cemetery would be managed as part of the school’s grounds, to ensure that the existence and protection of the site was documented and actively managed, to avoid accidental damage to the remains from works associated with maintenance, services or longer term development. Reason: To ensure the archaeological remains are treated as if they were of national importance and that any harm is avoided in accordance with policies in the National Planning Policy Framework 2012 (Paragraphs 132-134, 139) directed towards preserving the historical environment.”
“23. What the assessments showed was that the most significant archaeological remains were found in the northern part of the site in an area originally proposed for playing fields and subsequently for meadow. 24. From the outset, it was apparent that the archaeological interests could be secured either by the preservation of the remains in situ or by excavation. As the development proposal was to alter the site levels over the burial ground, there was some debate between the County Archaeologist and the Applicant’s archaeological consultants about the method of ensuring that, were preservation to be in situ, the change of levels did not damage the archaeology unnecessarily. There was never any question of the archaeology not being preserved in accordance with policy. The question was the means of doing so. 25. There was, in fact, some disagreement between the experts as to which means of preservation was to be preferred. The County Archaeologist favoured preservation in situ while his counterpart at St. Albans DC preferred excavation. 26. In determining the application the LPA has (a) identified and assessed the significance of the archaeological remains, (b) taken account of how the significant archaeological remains should be treated, and (c) made information about the historic environment publicly available in accordance with NPPF paragraphs 129, 132 and 141 respectively.”
“46. In the present case, there is no disagreement that it was appropriate for the authority to undertake a screening exercise in April 2010, once the application was formally registered. Nor is it now in dispute that the exercise was legally defective. As Mr James Dingemans QC said [2013] Env LR 859, para 60: “in circumstances where the pollution prevention measures had not been fully identified at that stage …. the council could not be satisfied that the mitigation measures would prevent a risk of pollutants entering the river, when the mitigation measures were not known” …… it was impossible at that stage to reach the view that there was no risk of significant adverse effects to the river. All the expert opinion, including that of CMGL’s own advisers, was to the effect that there were potential risks, and that more work was needed to resolve them. It was also clear that the mitigation measures as then proposed had not been worked up to an extent that they could be regarded as removing that risk. This could be regarded as an archetypal case for environmental assessment under the EIA Regulations, so that the risks and the measures intended to address them could be set out in that environmental statement and subject to consultation and investigation in that context. 47. In my view, that defect was not remedied by what followed. It is intrinsic to the scheme of the EIA Directive and the Regulations that the classification of the proposal is governed by the characteristic and effects of the proposal as presented to the authority, not by reference to steps subsequently taken to address those effects….” “53. As far as concerns the present case, it is not now in dispute that the screening opinion should have gone the other way. The mitigation measures as then proposed were not straightforward, and there were significant doubts as to how they would be resolved…. The fact that they were ultimately resolved to the satisfaction of Natural England and others did not mean that there had been no need for EIA. The failure to treat this proposal as EIA development was a procedural irregularity which was not cured by the final decision.” “in circumstances where the pollution prevention measures had not been fully identified at that stage …. the council could not be satisfied that the mitigation measures would prevent a risk of pollutants entering the river, when the mitigation measures were not known”
“54 Having found a legal defect in the procedure leading to the grant of permission, it is necessary to consider the consequences in terms of any remedy. Following the decision of this court in Walton v Scottish Ministers[2012] UKSC 44 ,[2013] PTSR 51 , it is clear that, even where a breach of the EIA Regulations is established, the court retains a discretion to refuse relief if the applicant has been able in practice to enjoy the rights conferred by European legislation, and there has been no substantial prejudice (para 139 per Lord Carnwath, para 155 per Lord Hope). 55 Those statements need now to be read in the light of the subsequent judgment of the CJEU in Gemeinde Altrip v Land Rheinland-Pfalz (Case C-72/12 )[2014] PTSR 311 . That concerned a challenge to proposals for a flood retention scheme, on the grounds of irregularities in the assessment under the EIA Directive. A question arose under article 10a of the Directive 85/337 (article 11 of the 2011 EIA Directive), which requires provision for those having a sufficient interest to have access to a court to challenge the “substantive or procedural” legality of decisions under the Directive. One question, as reformulated by the court (para 39), was whether article 10a was to be interpreted as precluding decisions of national courts that make the admissibility of actions subject to conditions requiring the person bringing the action – “… to prove that the procedural defect invoked is such that, in the light of the circumstances of the case, there is a possibility that the contested decision would have been different were it not for the defect and that a substantive legal position is affected thereby.” 56 In answering that question, the court reaffirmed the well-established principle that, while it is for each member state to lay down the detailed procedural rules governing such actions, those rules— “in accordance with the principle of equivalence, must not be less favourable than those governing similar domestic actions and, in accordance with the principle of effectiveness, must not make it in practice impossible or excessively difficult to exercise rights conferred by Union law” (para 45) Since one of the objectives of the Directive was to put in place procedural guarantees to ensure better public information and participation in relation to projects likely to have a significant effect on the environment, rights of access to the courts must extend to procedural defects (para 48). 57 The judgment continued: “49. Nevertheless, it is unarguable that not every procedural defect will necessarily have consequences that can possibly affect the purport of such a decision and it cannot, therefore, be considered to impair the rights of the party pleading it. In that case, it does not appear that the objective of Directive 85/337 of giving the public concerned wide access to justice would be compromised if, under the law of a member state, an applicant relying on a defect of that kind had to be regarded as not having had his rights impaired and, consequently, as not having standing to challenge that decision. 50. In that regard, it should be borne in mind that article 10a of that Directive leaves the member states significant discretion to determine what constitutes impairment of a right … 51. In those circumstances, it could be permissible for national law not to recognise impairment of a right within the meaning of subparagraph (b) of article 10a of that Directive if it is established that it is conceivable, in view of the circumstances of the case, that the contested decision would not have been different without the procedural defect invoked. 52. It appears, however, with regard to the national law applicable in the case in the main proceedings, that it is in general incumbent on the applicant, in order to establish impairment of a right, to prove that the circumstances of the case make it conceivable that the contested decision would have been different without the procedural defect invoked. That shifting of the burden of proof onto the person bringing the action, for the application of the condition of causality, is capable of making the exercise of the rights conferred on that person by Directive 85/337 excessively difficult, especially having regard to the complexity of the procedures in question and the technical nature of environmental impact assessments. 53. Therefore, the new requirements thus arising under article 10a of that Directive mean that impairment of a right cannot be excluded unless, in the light of the condition of causality, the court of law or body covered by that article is in a position to take the view, without in any way making the burden of proof fall on the applicant, but by relying, where appropriate, on the evidence provided by the developer or the competent authorities and, more generally, on the case-file documents submitted to that court or body, that the contested decision would not have been different without the procedural defect invoked by that applicant. 54. In the making of that assessment, it is for the court of law or body concerned to take into account, inter alia, the seriousness of the defect invoked and to ascertain, in particular, whether that defect has deprived the public concerned of one of the guarantees introduced with a view to allowing that public to have access to information and to be empowered to participate in decision-making in accordance with the objectives of Directive 85/337.” 58 Allowing for the differences in the issues raised by the national law in that case (including the issue of burden of proof), I find nothing in this passage inconsistent with the approach of this court in Walton. It leaves it open to the court to take the view, by relying “on the evidence provided by the developer or the competent authorities and, more generally, on the case-file documents submitted to that court” that the contested decision “would not have been different without the procedural defect invoked by that applicant”
“The High Court – (a) must refuse to grant relief on an application for judicial review; …. if it appears to the court to be highly likely that the outcome for the applicant would not have been substantially different if the conduct complained of had not occurred.”
“9.37 In summary with regards to the options to expand capacity at existing schools and the choice of Harpenden as the location for a new school: - The options to expand capacity at existing school sites would not provide sufficient places, evidenced in the viability assessments, to meet the level of deficit of places, evidenced in the forecast model; - Harpenden is located in the centre of the Harpenden EPA, which it serves and the three other secondary schools within the EPA are located there; - Harpenden is identified as in the upper hierarchy of settlements in the district and serves the local community in terms of services, employment, public transport and recreation; - Harpenden is a hub for sustainable travel, with a choice of buses and trains, cycling and walking; - Harpenden is an appropriate and sustainable location for a new 6FE secondary school. - The construction of a new 6FE secondary school in Harpenden is a reasonable option to provide the right numbers of school places within the area of need.”
“10.12 The education needs assessment has demonstrated that there is an urgent and sustained need for the additional secondary school places required within the Harpenden School Planning Area. Therefore great weight is attached to the educational need in accordance with the NPPF (paragraph 72). 10.13 The education benefits and the development of a new 6FE secondary school within the area of need, combined with the lack of available sites within the built up area of Harpenden, and the lack of any more suitable, available and deliverable sites with the Green Belt surrounding Harpenden are considered to constitute very special circumstances to justify inappropriate development in the Green Belt. 10.14 It is considered that the very special circumstances in this case clearly outweigh the harm to the Green Belt and the other harm that have been identified.”