"6. The purpose of the planning system is to contribute to the achievement of sustainable development. The policies in paragraphs 18 to 219, taken as a whole, constitute the Government's view of what sustainable development in England means in practice for the planning system. 7. There are three dimensions to sustainable development: economic, social and environmental. These dimensions give rise to the need for the planning system to perform a number of roles: – an economic role – contributing to building a strong, responsive and competitive economy, by ensuring that sufficient land of the right type is available in the right places and at the right time to support growth and innovation; and by identifying and coordinating development requirements, including the provision of infrastructure; – a social role – supporting strong, vibrant and healthy communities, by providing the supply of housing required to meet the needs of present and future generations; and by creating a high quality built environment, with accessible local services that reflect the community's needs and support its health, social and cultural well-being; and – an environmental role – contributing to protecting and enhancing our natural, built and historic environment; and, as part of this, helping to improve biodiversity, use natural resources prudently, minimise waste and pollution, and mitigate and adapt to climate change including moving to a low carbon economy."
“370. There is no dispute from anyone about the importance of the horse racing industry to Newmarket. It is a pre-eminent centre for the breeding, training, racing and sale of thoroughbreds. The stables, stud farms, training grounds and two racecourses all give Newmarket a special and unique quality that is greatly valued by those that live, work and visit it. Racehorses are moved around the town from their stables to the training grounds along specially constructed horse walks. This happens from early in the morning until about 1300 hours and the sight of the strings of these fine animals being taken for exercise is a very impressive spectacle. This was covered in considerable detail in the Report of the previous Inspector and I do not intend to repeat the same points again here [48; 169; 170]. 371. It was made quite clear at the Pre-Inquiry meeting that the important matter was what has changed since the earlier appeal and that repetition of the previous evidence would not be helpful. In 2012, the Secretary of State recognised the importance of the industry both in local terms and also to the national economy and in the global context. The conclusion that was reached was that the additional traffic from the development, which was a much larger mixed use scheme, would not have an unacceptable impact on the safety of racehorses or the horse racing industry overall [30; 31; 48; 49; 62]. 372. The NHG response to this conclusion, which it should be noted has not been challenged through the Courts, was basically that the Inspector and thus the Secretary of State had got it wrong. In particular they were said to have misunderstood the situation regarding horse behaviour and the motivations of wealthy racehorse owners. Indeed this was a recurring theme throughout the Inquiry and the impression was given by some participants that only those connected to the industry were able to understand it sufficiently well to make informed judgements. This attitude discourages reasoned challenge and is not particularly helpful, in my opinion [168; 178; 185; 190; 208].”
“389. There was no dispute that the application proposal would result in a 5% rise in traffic moving through the Rayes Lane horse crossing in the morning peak period and for the reasons given above, this would be expected to increase the potential accident risk. The point at issue is therefore whether the mitigation proposed would be sufficient to counteract the increased risk. The Applicant undertook an exercise which sought to assess this by taking the total number of observed incidents and the daily traffic flows and working out, on a pro rata basis, the number of incidents per vehicle per day. This was then assigned to the generated development traffic and compared with the potential incident savings of the mitigation proposals. The conclusion was that the SCC scheme would result in a net saving of just over 2 incidents a day. On this basis it could be concluded that the proposed development, with its mitigation scheme in place, would not increase the risk of accident or injury at the Rayes Lane horse crossing [61-63]. 390. However, the analysis was criticised by the NHG on the basis that the behaviour of thoroughbred racehorses is unpredictable and that a pro-rata approach to assigning an incident to a vehicle was therefore flawed. However the exercise included all horse crossing incidents whether traffic related or not. As already mentioned some, but by no means all, of the non traffic related incidents would be affected by increased traffic by virtue of the memory associations of the racehorses. The number of incidents in the analysis is therefore likely to be too high. Furthermore, the total number of observed incidents was 96 and so there could not be a greater number of incidents per vehicle than in the pro rata assignment. If anything the Applicant's analysis is therefore likely to be on the conservative side. It is accepted that on some days there would be less or no savings and on other days more. The relationship would not be a linear one as the mathematical exercise assumes. However overall the analysis has validity in terms of a quantification of the improvement that would ensue through incident savings. Furthermore, there is no alternative evidence that the 5% increase in traffic arising from the application proposal would give rise to 20% more incidents, whether traffic related or not [64; 186-188]. 391. In the circumstances it seems to me that on the available evidence the Secretary of State can have sufficient confidence to conclude that whatever the existing risk, the SCC Scheme would result in a net safety improvement with the application development in place. There was some discussion about whether the reference to a severe transport impact in Paragraph 32 of the Framework” (NPPF) “concerned the capacity or the safety of the network. It seems to me that in the circumstances of this case the improvements to the Rayes Lane horse crossing would provide an improvement to the network and a safety benefit and that whether or not safety is the relevant consideration, Paragraph 32 would not be offended [65; 183].”
“It seems to me that the advantages of the cluster and the importance of the horse racing industry to Newmarket, Europe and the world was understood by the previous Inspector and taken into account by the Secretary of State in his decision.”
“485. The Framework establishes that sustainable development should be seen as a golden thread running through both plan-making and decision-taking. The district has a short term deficit of deliverable housing sites. Although this may be relatively small at the present time, the Council itself considers its situation in terms of housing land supply as “fragile”
“1. I am directed by the Secretary of State to say that consideration has been given to the report of the Inspector, Christina Downes BSc, DipTP, MRTPI who held a public local inquiry from 14 April –1 May 2015 into your client’s application for outline planning permission for up to 400 dwellings plus associated open space (including areas of habitat enhancement) foul and surface water infrastructure, two accesses onto the A142, internal footpaths, cycle routes and estate roads at Hatchfield Farm, Fordham Road, Newmarket in accordance with application reference DC/13/0408/OUT dated2 October 2013 . Inspector’s recommendation and summary of the decision 2. The Inspector recommended that outline planning permission be granted. For the reasons set out below, the Secretary of State disagrees with the Inspector’s recommendation and he has decided to refuse outline planning permission. A copy of the Inspector’s report (IR) is enclosed. All references to paragraph numbers are to that report. Matters arising since the inquiry 3. …………………………………… 4…………………………………….. 5……………………………………….. 6………………………………………… Policy and statutory considerations 7. In deciding this application, the Secretary of State has had regard tosection 38(6) of the Planning and Compulsory Purchase Act 2004 which requires that proposals be determined in accordance with the development plan unless material considerations indicate otherwise. 8. In this case, the development plan consists of the saved policies of the Forest Heath Local Plan (1995), the Forest Heath Core Strategy Development Plan Document (2010) (CS) and the Forest Heath and St Edmundsbury Councils Joint Development Management Policies Document (2015) (JDMPD). The Secretary of State considers that the development plan policies of most relevance to this application are those set out by the Inspector at IR16.1-16.4 and IR17.1-17.4. 9. Other material considerations which the Secretary of State has taken into account include: the National Planning Policy Framework (the Framework); the Planning Practice Guidance (the Guidance); and theCommunity Infrastructure Levy (CIL) Regulations 2010 , as amended. Emerging plan 10. In terms of emerging policy, the Single Issue Review (SIR) of Core Strategy Policy CS7 – Overall Housing Provision and Distribution, and the Site Allocations Local Plan – Preferred Options were published for consultation on4 April 2016 . The Secretary of State considers that the most relevant policies include: Policy N1 (Housing and Mixed Use Development in Newmarket); Distribution Option 1 (Higher growth at Mildenhall and Red Lodge and Primary Villages and lower growth at Newmarket); and Distribution Option 2 (Higher growth at Newmarket, enabling lower growth at Mildenhall, Red Lodge and Primary Villages). Distribution Option 1 is the Council’s preferred option. Policy N1 allocates Hatchfield Farm for mixed use development, including 400 dwellings, while stating that the policy will be reviewed, if necessary, following the Secretary of State’s decision on this case. 11. Paragraph 216 of the Framework states that decision makers may give weight to relevant policies in emerging plans according to: (1) the stage of preparation of the emerging plan; (2) the extent to which there are unresolved objections to relevant policies in the emerging plan; and (3) the degree of consistency of relevant policies to the policies in the Framework. 12. The Secretary of State has taken into account the early stage of the emerging plan, which has not yet gone through an independent examination. With regard to the second limb, he has taken into account that there are unresolved objections relating to development at Hatchfield Farm. With regard to the third limb, the Secretary of State considers that at this stage the relevant policies do not contain inconsistencies with the Framework, but are still subject to change. On balance he considers that little weight can be afforded to the relevant policies in the emerging plan. 13. A Neighbourhood Plan for Newmarket is in preparation, and a Neighbourhood Plan Designated Area Application has been submitted to the Council. The Neighbourhood Plan is at an extremely early stage of preparation. There are not yet any relevant policies, but draft objectives have been published and are consistent with the Framework. Overall the Secretary of State considers that very little weight attaches to the emerging Neighbourhood Plan. Main issues 14. The Secretary of State agrees with the Inspector that the main considerations in this case are those set out at IR355. Housing land supply and the contribution that the proposal would make to the market and affordable housing needs of the District 15. The Secretary of State has given careful consideration to the Inspector’s analysis at IR356–364, and has also taken into account representations on housing land supply following the inquiry. 16. He notes that on10 February 2016 the Council published an updated ‘Assessment of a five year supply of housing land’. This sets out that under the Sedgefield approach, Forest Heath has a 6.2 year supply of housing land, and that if this application is refused by the Secretary of State, there is a 5.2 year supply. Sellwood Planning, on behalf of Lord Derby, indicated in its letter of19 February 2016 that given the uncertain nature of some of the sites relied on, it is considered that the land supply situation is, at best, only around 5 years. The Secretary of State has taken account of representations on this matter, and considers that the Council has demonstrated it has a 5 year supply of housing land and therefore relevant policies for the supply of housing should not be considered out of date through the operation of paragraph 49 of the Framework. 17. The Secretary of State has considered the weight that should attach to the provision of housing. He agrees with the Inspector that the proposed 30% affordable housing is in accordance with Spatial Objective H 2 and Policy CS 9 in the CS, and that meeting affordable housing needs is an important objective in the Framework (IR363). He has also taken into account paragraph 47 of the Framework, which seeks to boost housing delivery significantly. Overall, he considers that the proposed provision of market and affordable housing is a substantial benefit and carries substantial weight in favour of the scheme. Whether the traffic generated by the proposed development can be accommodated on the network without severe residual highway impact, and effect on the Rayes Lane horse crossing 18. For the reasons given by the Inspector at IR366–368, the Secretary of State does not consider that the application development would result in an unacceptable increase in congestion, and that the residual transport impact of the development would not be severe (IR369). He also agrees with the Inspector that the scheme would comply with development plan policy in this respect, in particular Spatial Objective T3 and Policy DM45 in the JDMPD (IR369). He agrees with the Inspector at IR495 that the improvements to the A14/A142 junction would result in wider benefits to those travelling on this part of the road network in peak periods, and that the significant improvement to southbound queues along this part of Fordham Road, and the reduction in rat running along Snailwell Road carry significant weight in favour of the proposal. 19. Notwithstanding the above conclusions, the Secretary of State notes that there would be an increase in traffic of about 5% (IR368). He has carefully considered the Inspector’s analysis of highway safety issues, in particular in relation to the Rayes Lane horse crossing (IR375-391), and her conclusion that there would be associated improvements to the Rayes Lane horse crossing which would at the very least mitigate the impact of the additional traffic generated but also result in a material safety benefit (IR400). However, he has also taken into account the particular nature of the thoroughbred horses that would be using the crossing, and the evidence that was put forward that even the most skilled and experienced riders can lose control as a result of the unpredictable and extreme behaviour of their mount. He shares the concern expressed at IR380 that these behavioural traits coupled with the inevitable interaction with traffic at the road crossings has the potential for danger that could escalate to a serious injury to the rider, horse or road user. He therefore considers that material safety benefits which the Inspector cites are not certain. Overall he considers that the additional risks arising from the increased traffic are a material consideration which carries moderate weight against the proposal. The effect on the horse racing industry in Newmarket 20. The Secretary of State has considered very carefully the arguments which were put forward in relation to the potential effect of this proposal on the horse racing industry and the Inspector’s analysis at IR370–399. He has taken into account the unique nature and structure of the industry, the global context in which owners make their decisions, and the huge economic importance of the continuing success of the horse racing industry at Newmarket. 21. His conclusions on the risks associated with increased traffic are set out above. Policy DM48 seeks, amongst other things, to prevent development that would threaten the long term viability of the industry as a whole, unless the benefits would significantly outweigh the harm. The Secretary of State notes that the policy takes a precautionary approach, by requiring consideration of whether development would ‘threaten’ the long-term viability of the industry – it does not require a finding that there would be specific and identifiable adverse impacts on the industry arising from this development. He considers that the question of risk is highly relevant, and that there is a substantial risk that the potential adverse consequences of increased traffic at the Rayes Lane horse crossing will create perceptions among owners and others in the industry of a more negative context for the industry in Newmarket. The Secretary of State considers that this would threaten the long-term viability of the horse racing industry, and that the benefits of the scheme would not significantly outweigh the harm to the industry. The proposals are therefore in conflict with policy DM48 of the JDMPD, and also with Vision 2 of the CS, which seeks to preserve and enhance Newmarket’s position as the international home of horse racing; with Spatial Objective ECO 5, which aims to protect its unique character; and with Policy CS1, which seeks to protect and conserve the importance of the horse racing industry and Newmarket’s associated local heritage and character. In the light of the economic importance of the horse racing industry in Newmarket, the Secretary of State considers that the threat to its continuing success carries substantial weight against the proposal. The effect of the proposed development on nearby sites of nature conservation importance and whether Habitats Regulation Assessment is necessary 22- 25……………………………………………. . 26. The Secretary of State is therefore satisfied that the application proposal would not give rise to conflict with Spatial Objective ENV 1 or Policy CS 2 in the CS or Policies DM10, DM11 and DM12 in the JDMPD. He also concludes that the proposal would comply with Paragraph 118 of the Framework. Whether the proposed development would be premature 27. The Secretary of State has taken into account the progress that has been made on the SIR since the inquiry, but has concluded (paragraphs 10-12 above) that the emerging plan carries little weight. He has considered the Inspector’s analysis at IR455-464, and taken into account that there is now a 5 year housing land supply. He has also taken into account the Council’s statement in their representation of 20 March, that the RAF Mildenhall site is not expected to come forward until 2020, and that should the position change fundamentally, the Council will undertake a review of their Local Plan. The Secretary of State agrees with the Inspector at IR462 that he proposed development would not constrain decisions on the timing, location and amount of development to be allocated in the SIR (IR462), and does not consider that the proposed development would be premature. Loss of countryside and agricultural land 28. The Secretary of State has taken account of the Inspector’s remarks that the proposal would result in the loss of about 20 hectares of best and most versatile agricultural land and that it would involve development in the countryside (IR468). Like the Inspector (IR469) he considers that the loss of countryside and best and most versatile agricultural land would not accord with local and national policies. The Secretary of State considers that the proposal would be in conflict with policy DM5 in the JDMPD, which seeks to protect the countryside from unsustainable development, and with policy DM27, which permits small scale housing developments in the country (IR468). He considers that this would be an adverse effect that carries moderate weight against the application proposal. Other matters 29. For the reasons given by the Inspector, the Secretary of State agrees with her conclusion that the character and appearance of the Newmarket Conservation Area would be preserved and that there would be no conflict with Policy DM17 in the JDMPD (IR467) . 30. For the reasons given by the Inspector at IR490, the Secretary of State considers that the economic benefits of the proposal carry moderate weight in favour of the proposal. Whether any conditions and obligations are necessary to make the development acceptable 31………………………..He agrees with the Inspector (IR471) that the proposed conditions are reasonable, necessary and otherwise comply with the provisions of paragraph 206 of the Framework. However, he does not consider that the imposition of these conditions would overcome his reasons for refusing outline planning permission. 32. The Secretary of State ……………(also) concludes that the obligations provided are in accordance with Regulation 122 of the CIL Regulations and paragraph 204 of the Framework. He agrees with the Inspector that at the time of the inquiry the provisions of Regulation 123 were not offended. Given his reasons for refusing outline planning permission, which do not relate to the obligations and would not be overcome by them, he has not considered it necessary to seek an update from the Council on this point. Overall conclusions and planning balance 33.Section 38(6) of the Planning and Compulsory Purchase Act 2004 requires that proposals be determined in accordance with the development plan unless material considerations indicate otherwise. For the reasons given above, the Secretary of State concludes that the proposal is not in accordance with development plan Policies DM5, DM27, DM48, Vision 2 of the CS, Spatial Objective ECO 5 or CS1, and is not in accordance with the development plan as a whole. He has therefore gone on to consider whether material considerations indicate that this application should be determined otherwise than in accordance with the development plan. 34. The Secretary of State considers that the proposal is in accordance with the emerging development plan. However, the emerging plan carries little weight, and the Secretary of State considers that the proposal’s accordance with the emerging plan carries little weight in the planning balance. The emerging Neighbourhood Plan carries very little weight, and the Secretary of State considers that the proposal’s accordance with the draft objectives of the emerging Neighbourhood Plan carries very little weight in the planning balance. 35. He considers that the provision of market and affordable housing in this case carries substantial weight in favour of the development, and that the economic benefits of the development carry moderate weight in favour. The road improvements referred to in paragraph 18 above carry significant weight in favour of the proposal. 36. However, he considers that the threat to the horse racing industry carries substantial weight against the proposal. He further considers that the risks arising from increased traffic at the Rayes Lane horse crossing carry moderate weight. He considers that the loss of countryside and best and most versatile agricultural land also carries moderate weight against the proposal. 37. The Secretary of State agrees with the Inspector’s conclusions at IR452 that there would not be a significant impact on nature conservation interests, and that there would be no significant impact on European sites, and that an appropriate assessment would not be required. He considers that these matters do not weigh against the scheme. 38. Overall, he concludes that there are no material considerations which indicate that he should determine the case other than in accordance with the development plan. Formal decision 39. Accordingly, for the reasons given above, the Secretary of State disagrees with the Inspector’s recommendation. He hereby refuses outline planning permission for up to 400 dwellings plus associated open space (including areas of habitat enhancement) foul and surface water infrastructure, two accesses onto the A142, internal footpaths, cycle routes and estate roads at Hatchfield Farm, Fordham Road, Newmarket.”
"Those general principles have since been applied by the courts in various circumstances where the principle of consistency is said to arise (see, for example, the decisions of the Court of Appeal in Dunster Properties Ltd. v First Secretary of State[2007] EWCA Civ 236 and R. (on the application of Fox Strategic Land and Property Ltd.) v Secretary of State for Communities and Local Government[2012] EWCA Civ 1198 , and, in the context of a licensing decision, R. (on the application of Thompson) v Oxford City Council[2014] EWCA Civ 94 ). In R. v Secretary of State, ex parte Baber [1996] the Court of Appeal found the requirement for the two cases be "indistinguishable" too onerous a test of materiality, at least in the particular circumstances of that case, Glidewell L.J. preferring (at p.1041) the formulation "sufficiently closely related", and Morritt L.J. (at p.1041) "sufficiently related" (see Holgate J.'s illuminating analysis of the relevant case law in his recent judgment in St Albans District Council Secretary of State for Communities and Local Government[2015] EWHC 655 (Admin) , at paragraphs 66 to 126). In Fox the Secretary of State had rejected a proposal for major residential development, giving "no weight" to his own previous decision on development on a similar scale nearby, in which he had taken a materially different view of the "spatial vision" for the area. Pill L.J., with whom Rimer and Black L.JJ. agreed on this point, referred (at paragraph 14 of his judgment) to the observation of George Bartlett Q.C., sitting as a deputy High Court judge, in J.J. Gallagher Ltd. v Secretary of State for Local Government, Transport and the Regions[2002] EWHC 1812 (Admin) (at paragraph 58) that where the inconsistency between two decisions is "stark and fundamental" it will usually not be enough to leave the explanation for the inconsistency to be inferred by the reader, because "unless the decision-maker deals expressly with the earlier decision and gives reasons that are directed at explaining the apparent inconsistency, there is likely to be a doubt as to whether he has truly taken the earlier decision into account"
“If the explanation of the inconsistency is obvious, a formal statement of it will be unnecessary. Where the inconsistency is stark and fundamental, as it seems to me it is in the present case, it will in my judgment usually be insufficient to leave it to the reader to infer the explanation for the inconsistent decisions. The reason for this is that unless the decision-maker deals expressly with the earlier decision and gives reasons that are directed at explaining the apparent inconsistency, there is likely to be a doubt as to whether he has truly taken the earlier decision into account. In the present case, moreover, the inspector has thought it appropriate to place reliance on the earlier decision and had referred to it no less than 33 times in the course of his report. The claimant was entitled in these circumstances to an express explanation on the Secretary of State's part, and it has been substantially prejudiced by the lack of such an explanation.”