“(1) Where injury is sustained by any person by reason of the exercise by the appropriate agency of any powers under section 165(1) to (3) of this Act, the appropriate agency shall be liable to make full compensation to the injured party. (2) In case of dispute, the amount of any compensation under sub-paragraph (1) above shall be determined by the Upper Tribunal.”
“…the implication is that the old wall, badly damaged during demolition, has become the actual defence and the new sheet piles will be doing little more than support the new capping.”
“there seems to have been a mindset on the Respondent’s part that there was not anything in the Claimants’ claims and that whatever was done for them would not be enough to satisfy them.”
“It is agreed that levels of dampness on the ground floor of the property are higher than prior to the works undertaken by the Environment Agency having taken place and this is very likely to be attributable to works carried out by the EA. Additional cracking to internal finishes has occurred since the work undertaken by the Environment Agency commenced in 2014 and this is very likely to be attributable to works carried out by the EA. The external wall to the side of the main staircase rising from ground to first floor level has moved outwards since the work undertaken by the Environment Agency commenced in 2014 and this is very likely to be attributable to works carried out by the EA. Solid floor finishes on the ground floor of the house have deteriorated as a result of salt crystallisation since the work carried out by the Environment Agency commenced in 2014 and this is very likely to be attributable to works carried out by the EA. The need for further investigations is agreed although the detailed scope of those investigations and who will undertake them remains to be agreed. 13 It is agreed that changes in the water table from its current position could result in significant further damage to the property beyond that which is currently visible. The change could be the result of water levels falling following remedial works to the flood defense wall.”
“it is possible that damage may be caused to the [building] by increased and/or differential settlement of the foundations and/or an increase in moisture content in elements of the fabric that are in close proximity to the ground.”
“that the detrimental effects of an increase in moisture content in elements of the fabric … will likely not occur immediately but will instead likely manifest gradually over a period of time”
“Ground water levels close to rivers would normally be expected to be at about mean river level, rising with distance from the river to give the hydraulic gradient that drives drainage to the river.”
“The water table [at the property] can be expected to have been present at shallow depth and to have shown a slight variation around a mean elevation maintained slightly above mean river level, which will approximate to Mean Sea Level adjacent to the property, estimated to be approx. +1.2m AOD.”
“48. In most circumstances, when it rains at any site, a proportion of the water will be lost back to the atmosphere as water vapour, either through evaporation (caused by the action of sun and wind) or transpiration (by respiring vegetation). Hydrologists generally combine these two processes and refer to “evapotranspiration.”
“With respect to the swimming pool, he accepts the views of Mr Hollingworth regarding relining of the pool in 2004 but considers there to be an atypical response of the ground to rainfall in its immediate vicinity.”
“It was clear from my visit that this site is wholly unsuitable for any replacement planting at present. The top soiling and seeding should not be undertaken until the structural drainage issues are resolved. There is surface water over the entire site and the ground is too boggy to walk on. There is a slight green tinge over the soil that looks like algae and a smell to the soil, suggesting anaerobic conditions. Furthermore it appears from the previous documented history that this water has a high saline content that the agency had been trying to deal with by applying a clay cap to stem the leaching of the tidal water into this area. I am concerned that the area is not free draining therefore planting of almost any tree or shrub will fail very quickly.”
“It is admitted that the [new wall] as originally constructed left a gap at the corner with the dock inlet at the Property. This was remedied by the insertion of the gravity plug referred to at paragraphs 15 and 16. It is denied that there is any ongoing tidal flooding of the garden.”
“(a) chronic failure of the concrete ‘seal’ between the outside of the old river wall and the new RC between it and the SSP (and, by implication, the reinforcing works that were undertaken to prevent inflows in 2017) along the line of the wall and (b) through construction joints within the Works perpendicular to the line of the wall.”
“I believe the house foundations are generally at about 2.7m OD although a deeper one has been recorded. With a ground water table now between 1.7 and 2.0m OD I consider it reasonable to assume that capillary rise can result in soil at foundation level being permanently damp, at least in some areas of the house. 18.6.3 The effects this will have on the house will be covered in the other expert reports in these proceedings.”