“Since the completion of the works the traffic has increased and is expected to increase further in future and it is less predictable as a result of the new signal controls that have led to the deceleration and acceleration of vehicles and the use of sirens by emergency vehicles. The Noise Assessment findings are that, although noise level increases are minor, they will be perceptible to the occupant. Light and traffic pollution will also have increased in the switched on scenario although my reading of the reports is that the effects, whilst being perceptible, are not significant. The claimant mentions that since Buckshaw Village/Matrix Park opened, heavy goods vehicle traffic accessing those locations via the Hartwood roundabout during the night has particularly increased. The Traffic Analysis report does not directly refer to this. I have no data to prove or disprove the claimant’s assertion but think it more than likely that night time traffic by HGVs will have increased. In King and Preselo v Dorset County Council[1997] 1 EGLR 245 the Lands Tribunal accepted that prestige properties suffered greater diminution in value as a result of the effects of the physical factors. The claim property is considered to be a quality property albeit located adjacent to a busy road junction. The house is set back within the boundaries of the property (the nearest part of the house is approximately 40m from the edge of the altered carriageway compared to 15m in respect of 162 Preston Road) and the intervening land contains trees and shrubs which will partially act to lessen the effects. In the light of the above in my opinion the percentage diminution attributable to the use of the altered road should be broadly similar to 162 Preston Road but slightly less to reflect that there are fewer lanes and that the claim property is set back from the site frontage and would assess this at 4.5%. Mindful of the King and Preselo decision I would allow for a further 1% to be added. VALUATION Switched off value of house£650,000 Diminution in value 5.5% Compensation therefore£35,750 ”
“Noise level predictions have been undertaken at 77 Preston Road under defined scenarios in order to demonstrate the likely change in road traffic noise resulting from the road improvement works on the A6 (Preston Road)/A674 roundabout. Noise level predictions have been undertaken in accordance with relevant guidance. Furthermore, the noise assessment is considered to represent a worst case approach due to the use of 1996 traffic flow data to define the “Baseline scenario”
“ 5.1 Lighting System intrusion As part of the general improvements to the roundabout, the street lighting system was replaced at the same time. The lighting system through the junction, along adjoining sections of Preston Road and along Millennium Way is provided by 12 - metre columns with 2-metre projecting arms and 250watt lanterns. As part of the signalling scheme, these columns replaced a similar number of older columns, although the individual positions changed as a result of the changed carriageway layout. The setting back of the carriageway meant that the closest column to number 77 is now approximately 20 metres from the nearest part of the property whereas previously the nearest location was approximately 27 metres distant. As lanterns are designed to throw light onto the highway it will not necessarily be the closest columns which throw the most light into the claimant’s property, but those around the junction and on Preston Road either side, as these will throw light sideways onto the claimant’s property. Unfortunately, there are no records of the lighting standard prior to the improvement, in terms of height of columns and lantern intensity. As a result, it is not possible to give a quantitative assessment of the change in light intensity. 5.2 Light intrusion from Traffic Owing to the 30mph speed limit and the high level of street lighting all drivers at night would be using dipped headlights. Because the driveway to number 77 comes out directly onto the roundabout island, there is no position at which a passing vehicle is pointing directly down the driveway. However, vehicles negotiating the southern arc of the roundabout, between Hazel Grove and Preston Road, will cast some light on part of the north-east frontage of the building, from a distance of approximately 40 metres. In that the circulatory carriageway has been relocated about 2.5m northwards compared to the original roundabout, the angle of traffic around this southern arc is slightly ‘straighter’ in relation to the driveway and building than previously and so headlight intrusion from vehicles would be slightly increased, though brief and indirect. However, given the high level of ambient lighting the perception of individual vehicle headlights, in both the ‘Before’ and ‘After’ scenarios will be small.”
“I confirm that my report includes all facts which I regard as being relevant to the opinions which I have expressed and that attention has been drawn to any matter which would affect the validity of those opinions. I confirm that my duty to the Upper Tribunal (Lands Chamber) as an expert witness overrides any duty to those instructing or paying me, that I have understood this duty and complied with it in giving my evidence impartially and objectively and that I will continue to comply with that duty as required.”
“ Noise Assessment A Noise Assessment report has been prepared by Phillip Wilson, Principal Engineer, Environment Directorate, Lancashire County Council. Appendices 21 and 22 refer. The report finds that overall the level of noise experienced at the property on balance is not now nor will in the future be worse than existed pre scheme. Noise recorded at the claim property is lower than at a point 200m to the east where traffic is free flowing. As a result of a lowering of the speed limit from the National Speed Limit of 60mph to 40mph and the change in the carriageway surfacing materials used the findings of the report are such that the effect of noise on the property is positive in that noise will have reduced from its pre scheme level. This reduction is offset by the increases in noise associated with the changing gears in the acceleration and deceleration of traffic at the junction. The overall effect of noise at the property is neutral. In assessing a claim under the Act it is in my opinion necessary to consider the perceptions of hypothetical purchasers at the valuation date. Due to the new junction and the increased amount of stop start traffic movements there will in my opinion be a perception that the levels of noise have increased and they would alter their bid for the property accordingly. Lighting Assessment A Lighting Assessment has been undertaken by Phillip Wilson. Appendix 23 refers. The findings of the report are that whilst there may be some increased light spillage into the property the overall effect of the scheme lighting is such that it is directed more towards the ground and does not disperse as widely as pre-scheme. The assessment does not mention the effect of vehicle headlights when exiting the business park but it is clear from my inspection that lights do intrude into the claim properties although in the case of Stansfield House Farm the lights are shielded somewhat by the boundary hedge screening the road from the property. Indirect light is however noticeable. Air Quality Assessment An Air Quality Assessment has been undertaken by Phillip Wilson, Appendix 24 refers. The findings are that despite the increase in traffic volumes there will be a predicted reduction in the level of pollutants produced by the traffic by 2016. This is due to the improvements in technology and emissions legislation.”
“In the light of the above in my opinion the percentage diminution attributable to the use of the altered road should be slightly greater than the comparables referred to, to reflect the differing circumstances and would assess this at 7.5%. Section 6(1) of the Act allows the compensating authority to offset any increase in value to the property attributable to the existence of or the prospective use of the public works to which the claim relates. As the property will benefit from its proximity to the new railway station in my opinion the percentage will need to be adjusted to take this benefit into account and in my opinion the overall determination should be 6.5%. Valuation Switched off value of house£450,000 Value of Barn with hope value£150,000 Total:£600,000 Diminution in value 6.5% Compensation therefore£ 39,000 If it is determined that the value of the barn can take the planning consent into account the valuation will be as follows: Switched off value of house£450,000 Value of Barn£300,000 Total£750,000 Diminution in value 6.5% Compensation therefore£ 48,750 The valuation assuming a nominal value for the barn would be as follows: Switched off value of house and barn£450,000 Diminution in value 6.5% Compensation therefore£29,250 ”
“The closest part of the property is approximately 25m from the new road at its junction with Preston Road. Buckshaw Avenue inclines steeply from Buckshaw Village and the new business park development and all vehicles but especially heavy lorries struggle to get up it resulting in more noise fumes etc than if it was a level road. The claimant mentions noise at night from lorries being particularly intrusive. The road is one of the main entrances to Buckshaw Village/the business park from the M61 side and with the future development expected the traffic and noise are expected to increase. Switched off value of property:£320,000 Compensating recommended:£ 29,000 Percentage: 9%.”