"6.1 With effect from the Commencement Date and for each Day thereafter during the term of this Agreement, the CATS Parties shall provide the Transportation Service in respect of Capacity Gas delivered from a Designated Field(s). The Transportation Service shall mean a service whereby, subject to the other terms and conditions of this Agreement and the Allocation Provisions, the CATS Parties shall: (a) accept during each Day at the relevant Entry Point Capacity Gas delivered from a Designated Field(s) complying with the Notified Specification up to the Notified Rate; (b) transport such Capacity Gas through the CATS Transportation Facilities; (c) redeliver Capacity Redelivery Gas complying with the Redelivery Specification to [TGTL] on behalf of the relevant Capacity Users at the relevant Redelivery Point…"
"7.4 An amount (hereinafter referred to as the "
"'Commencement Date': means the later of1 April 1993 and the first day of the month commencing immediately after the date on which the CATS Operator notifies [TGTL] that: (a) the CATS Approvals have been obtained by the CATS parties; (b) the CATS System has been tested and commissioned to the satisfaction of the CATS Parties; and (c) the CATS Transportation Facilities are available to perform the Transportation Service for Capacity Gas at the Capacity Reservation Rate."
"(I) Capacity shall be deemed not to be available for the provision of the Transportation Service when (and to the extent that) the CATS Parties are unable or fail to redeliver Capacity Redelivery Gas at the relevant Redelivery Point for whatever reason, including without limitation: (A) periods of maintenance of the CATS System; (B) Force majeure affecting the CATS Parties, the CATS Operator, the CATS Transportation Facilities or the operation thereof; (C) the failure of the CATS parties or the CATS Operator to accept at any relevant entry point Capacity Gas at the relevant Capacity Input Rate and at the relevant Notified Specification… unless such inability or failure of the CATS Parties is due to any of the following: (E) an act or omission of [TGTL]… (G) failure of [TGTL] … to deliver Capacity Gas to any Entry Point at the relevant Capacity Input Rate and at the relevant Notified Specification for any reason…but excluding any such failure caused by an act or omission of the CATS Operator or any of the CATS Parties."
"(A) The CATS Parties intend to construct, own and operate the CATS System. (B) The ICI/Enron Party wishes to reserve capacity in the CATS Transportation Facilities and to procure certain transportation services and the Parties wish to provide herein for such reservation of capacity and the terms upon which such transportation services shall be provided by the CATS Parties. (C) The Gas Sales Agreements have been entered into on the date hereof."
"(10) The T6 Entry Point was first inspected by Rockwater (Phillips' contractors) in late October 1994. A welded connection was then contemplated. The valves were found to be not sealing as they should causing leaks of gas. The probability is that the condition of the valves was the same on1 April 1993 . The leaks were such that a tie-in by either weld or flange could not have proceeded then and investigation of the problem was required."