“To date we have still not had the 1 st to 4 th bullet points, in particular the 3 rd and 4 th , demonstrated in any way such that any claim must fail as a result of that failure. That is the starting point for any consideration of the validity of the claim and, if the claim fails at this point there is no need for further consideration.”
“To date your client has not demonstrated that any of the projects meet the criteria for R & D Tax Credits which is the starting point of the claim. Until your client can demonstrate that the claim meets those criteria, the quantum of the claim and the potential subcontract nature do not need to be addressed.”