“Meridian Water is located in the London Borough of Enfield within the Lee Valley and is part of the London-Stansted- Cambridge Corridor. It is a huge investment opportunity that will provide up to 5000 new homes and 3000 new jobs. Meridian Water is only six miles from Junction 25 of the M25, 25 minutes from City Airport, 30 minutes from Westfield Stratford, 35 minutes from the O2 Arena, 43 minutes from Heathrow and two hours 50 minutes from Paris via Eurostar, creating an excellent and well connected location for development and growth in London. This Masterplan sets out proposals to connect the east and west of the area using a new community spine, a pedestrian friendly route that joins Harbet Road to Glover Drive, which will strengthen linkages with Edmonton, Tottenham, Walthamstow, Chingford and beyond. This is important because Meridian Water is a plan for everyone. The Masterplan sets out development principles for a new neighbourhood shaped around this link, creating development that will become part of the surrounding neighbourhoods and communities. A vibrant mix of uses will create a distinctive place that people will call home; quiet residential streets and busy waterside apartments will form attractive places to live.”
“Meridian Water is a complex site with many constituent parts. Aspects of the masterplan which are complete and not commercially sensitive have been shared publicly including the Meridian Water draft Supplementary Planning Document (SPD) which was consulted on in November and December 2022. A draft copy of the document can still be seen here and this constitutes the entirety of the masterplan which has planning policy in place to bring forward development. The Council intends to formally adopt the SPD this summer following amendments which resulted from consultation engagement and this will be a publicly available planning document. This SPD covers development for the next 10+ years and conforms with the Edmonton Area Action Plan – this is the work that is substantially complete. Other aspects of the masterplan are not complete and work is ongoing on these elements; they cannot yet be shared due to commercial sensitivities. However, once information is shareable this will be published for feedback. The Council plans to engage with landowners and the wider community as work progresses. Officers also update Cabinet from time to time as the Meridian Water programme progresses. Please also keep an eye on our website. The Meridian Water team are engaged in collaborative work with the London Borough of Waltham Forest regarding Banbury Reservoir. Both boroughs plan to work with Thames Water to explore future opportunities to improve public accessibility of this asset as part of a wider connectivity strategy. An emerging vision has been prepared between the boroughs, some of which was shown for community discussion as part of the SPD consultation process. I have appended relevant emerging project ideas which have been worked up with some prior engagement from CPRE. In the event that projects receive funding and can be taken forward, wider community engagement will be undertaken and predominantly led by Waltham Forest (as Banbury Reservoir sits within the Waltham Forest borough boundary). The Banbury Reservoir work forms part of a wider wayfinding strategy which is an ongoing piece of work at Meridian Water. Wayfinding will play a key role in connecting the masterplan with the wider community. The Council is exploring meanwhile wayfinding interventions which can be installed as the scheme develops.”
“[The] completed components of the Meridian Water masterplan are precisely the Meridian West SPD (which is due to be formally adopted very shortly). The remainder of the masterplan will include land to the east of the SPD area. This area is currently Strategic Industrial Land, there are a series of planning matters to resolve before the team can start to show a comprehensive long-term approach to the latter stages of the masterplan. As such, the only corporately approved information on the entire masterplan internally is in the format of a spreadsheet which contains financial forecasting information associated with future development – this was the document associated with the latest Meridian Water Cabinet report (April 2023). It should be flagged that associated spatial masterplan information is not complete.”
“I would firstly like to highlight that following the Council’s publication of the 2013 Masterplan, Enfield Council’s master planning process for Meridian Water comprises of a series of evidence based ‘masterplan documents’ to support delivery across the different parcels and phases of the programme. As a result, there is not, a single ‘masterplan’ document that exists but rather a series of complete evidence-based documents, which form the Masterplan and set out the intentions for the site. In their original request, the requester asked for a copy of the latest Masterplan, which he understood to be complete. The Meridian Water Team has reiterated that there is a misunderstanding on this front, as the Masterplan is not complete nor has the Council made a statement that it is. The Meridian Water Team has reiterated that for something to constitute a ‘Masterplan’ it has to have been agreed upon and adopted. In previous responses there has been reference to aspects of the Masterplan currently being progressed to inform the emerging Enfield Local Plan. The Enfield Local Plan will provide a single planning policy document for the borough and a vision for how Enfield will spatially develop to 2039 and beyond. There are aspects of the draft local plan, which contain specific sections on Meridian Water. However, this document would only form part of the Masterplan if it is adopted and agreed upon. At this moment in time, it has no current status and therefore the Council does not consider it to form part of the Masterplan. This is because the emerging Enfield Local Plan proposals still need to go through a formal Regulation 19 consultation and then an Examination process. I have outlined below the information/documentation that the Council considers to be the Masterplan. • The original 2013 Masterplan, a link to which I have included here. planning-informationmeridian-water-masterplan-july-2013.pdf (enfield.gov.uk) • The Supplementary Planning Document (SPD)(Meridian West) – Originally provided in draft form at the time of the original request and then a link was provided to the final version, which was published later. Please note that this SPD document does address some aspects of the East of the site Meridian West Supplementary Planning Document (enfield.gov.uk) • The Council’s Cabinet Papers (KD5463) dated19 April 2023 . Please see links below to the Council’s Democratic Pages where this report is saved as part of the Cabinet Papers for this meeting. https://governance.enfield.gov.uk/ieListDocuments.aspx?CId=107&MId=14308&Ver=4 https://governance.enfield.gov.uk/documents/s97357/PL2223%20xxx%20KD5463%20MW%20Finan cial%20Model%20Part%201%20v6.pdf • The information provided regarding the plans for the IKEA site, which was originally withheld on grounds of commercial sensitivity, and has since been provided in our correspondence with you. • The Strategic Infrastructure Work Planning Permission (which is a key planning application that forms part of the Masterplan) This can be found on the Council’s online planning portal https://www.enfield.gov.uk/services/planning/the-planning-register . The reference number for the application is 19/02717/RE3 Therefore, I can confirm that the requester has received everything that the Council holds that constitutes the Masterplan. We have nothing further to disclose and are not relying on any exceptions to withhold any information.”
“The Council would firstly like to clarify that Meridian Water Masterplan 2.0 (or V2) is the name the Meridian Water team gave to the process of refreshing the original masterplan (a copy of the 2013 Meridian Water Masterplan has previously been provided). • The supporting evidence provided dating back to 2020 refers to this masterplan design process, and the ongoing work, not a completed document. There is not one complete Masterplan 2.0 (or V2) document that been used as a basis for decision making. The Council considers that it is important to draw the focus back to the requester’s original request, dated 16 th May 2023. This asked the following: • Please provide me with a copy of the latest Meridian Water Masterplan, which I understand has now been completed. As explained within previous responses, the dynamic masterplanning process at Meridian Water is ongoing and will continue throughout the 30+ year lifespan of the project. Our approach is continually evolving, informed by changing factors including land ownership, planning policy, building safety, environmental and technical standards. Enfield Council’s website will continue to provide updates on the masterplanning process. Details of public engagement and formal consultation will be shared as plans for Meridian Water develop over time and across different phases and parcels. As of the date of the original request, the key masterplanning document is the Meridian Water SPD. A draft version of the SPD was provided in our original response to the complainant dated 12 th June 2023. The full document was provided in our response dated 31 st October 2023. The complete 2023 Meridian West SPD document has been published to inform decision making for Meridian Water. It contains policy guidance that covers the following: • MW1 – Movement and connectivity • MW2 – Carbon reduction • MW3 – Blue and Green network • MW4 – Sustainable construction management • MW5 – Housing and design quality • MW6 – Commercial activity areas • MW7 – Delivering a new town centre • MW8 – Social infrastructure • MW9 – Managing transitions • MW10 – Tall building strategy Details of the full planning permission for Strategic Infrastructure Works (reference 19/02717/RE3) and information relating to third party owned “IKEA” land have also been provided. These cover large portions of the Meridian Water masterplan area. The Council hopes the above clarification is helpful. For completeness, we respond to the key points raised in your communication, as follows: • Your enquiry has referred to ‘Meridian Water Masterplan V2 (also referred to by the Council as the ‘Meridian Water Masterplan 2.0) as being ‘functionally complete’ and used as a ‘basis for decision making’ I can confirm that Meridian Water Masterplan V2/2.0 is a workstream process, not a single document that has been completed and used for decision making. The SPD is the copy of the latest masterplan that has now been completed, which is what the complainant originally requested. • Your enquiry makes reference to the fact that extracts from the Meridian Water Masterplan V2 appear in other documents. You have asked that, in light of this, why the Council has not listed the Meridian Water Masterplan V2/2.0 in the documents Please refer to the explanations provided above. The references to V2/2.0 that appear in the documents refer to the ongoing masterplanning process – not one complete document used for decision making. Please refer to the previous explanations. The third party owned “IKEA” land forms part of the Meridian Water masterplan area. A copy of the third-party marketing information has been provided and this has been informed by the policy guidance and vision set out within the Meridian Water SPD. I trust the above clarifies why the Meridian Water Masterplan V2/2.0 has not been referenced in the Council’s response to the complainant’s request which was for “a copy of the latest Meridian Water Masterplan, which I understand has now been completed”
“Any person making a request for information to a public authority is entitled – (a) to be informed in writing by the public authority whether it holds information of the description specified in the request, and (b) if that is the case to have that information communicated to him.”
“The Meridian Water Masterplan is currently being revised, and the Masterplan, along with the Financial Model, and various site wide strategies will inform the future Phasing Plan and phased delivery strategy. The Meridian Water Masterplan 2.0 is being developed in coordination with other borough-wide planning studies and initiatives including the Enfield Local Area Plan 2036 which is currently under preparation. The masterplan will be a critical evidence piece to inform new area-based policies for Meridian Water in the new Local Plan for the next 10 years. It is likely to be a material consideration in planning decisions and will be used to inform the new Local Plan and site-specific planning briefs, the study may be taken further as a Supplementary Planning Document (SPD).”
“We are preparing the second version of the Meridian Water masterplan which also demonstrate how these housing and employment targets can be achieved. The next version of the masterplan will be subject to public consultation and we would welcome your feedback at that stage. … …The new masterplan, guided by the Meridian Water Environmental Sustainability Strategy (ESS), sets out ambitious plans for Meridian Water to have 30% quality green open space which is considered best practice within London. … … That level of rail service, combined with new bus routes, supports the housing density proposed in the new masterplan. Planning Policy requires all development sites to achieve optimum levels of homes to address the chronic shortage of homes nationally. The new Meridian Water masterplan demonstrates how the optimum level of density can be achieved within a high-quality environment.”
“The current draft version of the Meridian Water masterplan contains plans for 30% publicly accessible open space. The research materials to support the provision of greenspaces are still in draft form and in the course of completion. They are subject to further comments, change and approval from Cabinet. These plans, inclusive of supporting evidence, will be available for release following Cabinet approval which is expected to occur in summer 2021.”
“The masterplan layout is under development and currently comprises interim areas, to be further developed through the ensuing masterplan design process, during which detailed maps will also be provided.”
“The Masterplan is undergoing financial review and will be brought forward to Cabinet for approval to consult in summer 2022… The Scrutiny Panel input is pivotal to the success of the Masterplan and resident engagement following cabinet approval planned in summer 2022”
“Work continued on refining and updating the project masterplan including incorporating changes required due to planning. A separate report is scheduled for presentation to Cabinet in Autumn 2022 which includes an update on the Meridian Water financial model.”
“The Meridian Water Corporate Brief sets out Enfield Council’s corporate priorities and requirements on the IKEA development site against the Meridian Water 20 year Masterplan.”
“The purpose of this document is to present the aspirations for the Ikea site as part of the Meridian Water masterplan 2.0 vision. This reflects Enfield Council’s core strategies and the development’s Placemaking Pillars in the context of emerging policy documents and works delivered to date, current as of May 2022. This document has been compiled by Periscope and Kjellander Sjoberg, on behalf of Enfield Council. Images produced by Periscope and Kjellander Sjoberg, with information support from Mae.”
“Masterplan vision substantially complete. Ongoing amendments to the masterplan to be transferred to in-house capacity to save costs and reflected in urban designer and design manager roles, as such this post can be deleted.”
“The Placemaking Team has not been deleted just reduced to reflect the number of the workstreams coming to an end and the new delivery strategies – for example the Masterplan is not expected to be revisited for a number of years and the SPD has now reached the final stages of approval and is being led by the Strategic Planning Team.”
“In addition to testing the new parameters of building areas and use classes presented in the Meridian Water master plan, the financial model development required a robust review and update of all financial assumptions to reflect the current market where we are experiencing unprecedented levels of inflation, In this changed landscape, the assumptions in the Financial Model have been interrogated and updated by market experts.”
“Pregnancy and Maternity The Master Plan ensures all infrastructure to be accessible wherever necessary as well as ensuring the inclusion of health provisions.”