"That you have been negligent, unprofessional and irresponsible in carrying out your duties as Contract Administrator of the Dacres Estate project. Specifically: (a) Mr Lo Sterzo issued a Schedule of Works when the project was re-tendered which reqired insulation to be installed on the balcony return walls as part of the Eternit rain cladding system ("the insulation works") despite his being aware through having been previously advised by Eternit that the insulation were not possible. (b) Mr Lo Sterzo refused to hold prior to22 April 1996 design team meetings involving the sub-contractors, William Verry Limited, despite being requested to do so. (c) Mr Lo Sterzo deliberately failed to inspect work in progress on the balcony return walls."
"You withheld information from senior management, which frustrated proper management of the contract. Specifically during June 1997, Mr Lo Sterzo deliberately failed when asked to brief senior management (Ken Platt and Ralph Harris) on the project. (a) To inform them that he had been advised by Eternit at the initial design stage that the insulation works were not possible. (b) To draw their attention to documentation issued by Eternit which was relevant to the issues of whether the insulation works were possible and of what Eternit had advised him on this point. Allegation 3: You withheld information which affected a satisfactory resolution of the dispute. Specifically throughout Mr Lo Sterzo's discussions concerning the project with his team leader, Ken Bryan, he deliberately failed to inform him that he (Mr Lo Sterzo had been advised by Eternit at the initial design stage that the insulation works were not possible. Allegation 4: "
"The question of substance which we have to decide is whether the activities of the Applicant in supervising works at the site in question amounted to more than professional negligence and could reasonably be classified as gross misconduct. In our view an employer might reasonably conclude that the Applicant was guilty of gross misconduct. On page 11 they say: "
"The specifications put out (twice) for Tender required that the Eternit system should be taken into the balconies. On the face of it this would mean that the cladding inside the balconies should allow for an 80 mm space between the cladding and the wall. In fact this was impossible. At the inside return wall such a projection would extend over the glazed part of the window. On the outside return wall the projection will prevent the balcony door from opening. The Respondent asserts that the Applicant appears to admit, that the Applicant knew about this when he issued these specifications."
"The fundamental fact remains that the design submitted by Verry and formally approved by me, 50mm thick mineral wool insulation between timber battens behind cladding boards, without an gap, can be constructed within this space existing in the balconies. This has always been the case and I have always been aware of this."
"The wrong belief that the work could never have been done and that I, as a professional, knew this from the beginning has coloured the whole situation."
"Clauses 2.3 and 2.5 of the LEED Report of June 1997 (see bundles) clearly and simply explain this test and its implications. The said clauses 2.3 and 2.5 also establish that firstly the building work to the balconies could always have been done as there was at all times sufficient space to do it, and that 2. – the employer (Lewisham) knew this before any action had been initiated against the applicant on15 July 1997 (suspension from work). Furthermore, evidence in the bundles as well as that provided orally at the hearing proves that the said LEED Report was prepared by the employer's representative, and this makes it impossible to suggest that a.- the work could never have been done, and 2.- that there was any issue of concealment, let alone deliberate, on my part. The charge of gross misconduct cannot therefore be supported."
"The fundamental fact remains that the design submitted by Verry and formally approved by me, 50mm thick mineral wool insulation between timber battens behind cladding boards, without an gap, can be constructed within the space existing in the balconies. This has always been the case and I have always been aware of this."
"Clauses 2.3 and 2.5 of the LEED Report of June 1997 (see bundles) clearly and simply explain this test and its implications. The said clauses 2.3 and 2.5 also establish that firstly the building work to the balconies could always have been done as there was at all times sufficient space to do it, and that 2. – the employer (Lewisham) knew this before any action had been initiated against the applicant on15 July 1997 (suspension from work). Furthermore, evidence in the bundles as well as that provided orally at the hearing proves that the said LEED Report was prepared by the employer's representative, and this makes it impossible to suggest that a.- the work could never have been done, and 2.- that there was any issue of concealment, let alone deliberate, on my part. The charge of gross misconduct cannot therefore be supported."