33 Grosvenor Road Westcliff on Sea Essex SS0 8EP CAM/00KF/LDC/2024/0006
FIRST-TIER TRIBUNAL
PROPERTY CHAMBER (RESIDENTIAL PROPERTY)
Case No CAM/00KF/LDC/2024/0006
Between
Together Property Management LimitedApplicantThe leaseholders named on theRespondent
Before
Mrs E Flint FRICSDate 2 April 2024Property: Sea Essex SS0 8EP Together Property ManagementType of application: requirements under S.20 Landlord and Tenant Act 1985 Mrs E Flint FRICS
DECISION
This has been a remote hearing on the papers which has been consented to by the Applicant and not objected to by the Respondent. A face to face hearing was not held because it was not practicable, no-one requested the same, and all the issues could be determined on the papers. The documents that I was referred to were in a bundle of 46 pages, the contents of which I have recorded. 2 Decision of the tribunal(1) The Tribunal grants dispensation from all of the consultation requirements under S.20 of the Landlord and Tenant Act 1985 in relation to the replacement of the soil and vent pipe and associated works.(2) The question of reasonableness of the works or cost was not included in this application, the sole purpose of which is to seek dispensation. The Background[1]The application under section 20ZA of the Landlord and Tenant Act 1985 (“the Act”) was made by the Applicant on 19 January 2024.[2]The Applicant has applied for dispensation from the statutory consultation requirements under section 20 of the Landlord and Tenant Act 1985 and the Service Charges (Consultation Requirements) (England) Regulations 2003 in respect of the replacement of soil and vent pipe and associated pipe works.[3]Directions were issued on 13 February 2024 requiring the applicant to prepare bundles to include statements(i) Setting out the full grounds for the application, including all of the documents on which the landlord relies and copies of any replies from the tenants;(ii) The Leaseholders were asked to confirm whether or not they would give their consent to the application by 8 March 2024.(iii) In the event that such agreement was not forthcoming the leaseholders were to state why they opposed the application and provide copies of all documents to be relied upon.[4]The Applicant confirmed that copies of the application were emailed to all the leaseholders on 20 January.[5]No objections were received from the leaseholders.[6]The Leaseholders were informed in the Directions issued by the Tribunal that the question of reasonableness of the works or cost was not included in this application, the sole purpose of which is to seek dispensation. 3 The Evidence[7]The building comprises a three storey semi-detached house converted into five flats.[8]In 2023 one of the leaseholders on the ground floor advised the managing agents that there was a dip in the bathroom floor which they suspected was due to a leak in the communal soil and vent pipe which had resulted in damage to the joists below the bathroom floor.[9]A contractor inspected the premises on 20 June 2023 to investigate the leak inside the boxing at a cost of £276 inclusive of VAT. The works were considered to be urgent to prevent further damage to the ground floor flat.[10]Established Energy Solutions Limited attended on site to replace the soil and vent pipe which was leaking at high level, replaced the ground floor joists and provided new drainage pipework under the ground floor. The new joints on the soil and vent pipe were solvent welded rather than the previous push joints, to prevent future problems. The new pipework was tested and making good completed. The Decision[11]The relevant test to be applied in an application for dispensation was set out by the Supreme Court in Daejan Investments Ltd v Benson & Ors [2013] UKSC 14 where it was held that the purpose of the section 20 consultation procedure was to protect tenants from paying for inappropriate works or paying an inappropriate amount. Dispensation should not result in prejudice to the tenant.[12]The Tribunal determines from the evidence before it that the works were necessary, were required to be completed urgently and that no prejudice to the lessees has been demonstrated or asserted.[13]On the evidence before it, and in these circumstances, the Tribunal considers that the application for dispensation be granted. Name: Evelyn Flint Date: 2 April 2024 4 RIGHTS OF APPEAL[1]If a party wishes to appeal this decision to the Upper Tribunal (Lands Chamber) then a written application for permission must be made to the First-tier Tribunal at the Regional office which has been dealing with the case.[2]The application for permission to appeal must arrive at the Regional office within 28 days after the Tribunal sends written reasons for the decision to the person making the application.[3]The application should be made on Form RP PTA available at https://www.gov.uk/government/publications/form-rp-ptaapplication- for-permission-to-appeal-a-decision-to-the-uppertribunal- lands-chamber[4]If the application is not made within the 28 day time limit, such application must include a request for an extension of time and the reason for not complying with the 28 day time limit; the Tribunal will then look at such reason(s) and decide whether to allow the application for permission to appeal to proceed despite not being within the time limit.[5]The application for permission to appeal must identify the decision of the Tribunal to which it relates (i.e. give the date, the property and the case number), state the grounds of appeal, and state the result the party making the application is seeking.