“there are many more other comments and observations but these are very technical which are mainly needed by us, engineers to progress a design.”
“This drawing is to be read in conjunction with all the architect’s and engineer’s drawings and the specifications. Temporary works are to be to the contactor’s details. All waterproofing, insulation and finishes to floors walls and roofs to architects details. Concrete grade to be RC35 to BS 8500 Part 2 and BS EW 206”
“Structural drawings, preliminary calculations, temporary works design for planning application submission£4,500 + VAT (60% of Structural Engineering work completed) ….Additional involvement: - Structural drawings, details, calculations, specification for construction, party wall and building control purposes:£3,500 + VAT. Please confirm that you wish to me to proceed”
“Please find attached all the structural calculations and specifications from Martin which you had requested in order to complete the quote. I’d be very grateful if you could complete the quote and send it to me as soon as possible…..”
“MG08 Underpinning 20 WORKMANSHIP The work shall be carried out in accordance with the Engineer’s drawings and instructions and to the approval of the Architect and the Building Control officer. This inspection is intended to be used for mass concrete underpinning. ……………… CONCRETE GRADE on works where a full specification has not been provided a FND2 mix should be used. This has a characteristic 28 day strength of 35N/mm 2 and is suitable for Class 2 sulphate soils. ……………. MG10 INSITU CONCRETE 10 MATERIALS and Workmanship are to comply with BS 8110 20 CONCRETE for reinforced concrete structures is to be designated mixed RC35 to BS 8500 Part 2. ………………. 50 READY mix concrete is to be used unless otherwise allowed by the Structural Engineer. This must be obtained from a plant which holds a current Certificate of Accreditation under the Quality Scheme for Ready Mix Concrete. Details of cement type, aggregate grading and sources, with chloride and sulphate content of mixes to be submitted to the Structural Engineer for his approval prior to ordering any concrete. 60 THE use of site mixed concrete for structural elements may only be used following the written approval of the Structural Engineer. Batching and mixing equipment will need to comply with BS1035 and BS 4251 130 THE rate of sampling for compressive testing of concrete is to be agreed with the Structural Engineer prior to commencement of any concrete works.”
“We would like to inform you that due to the bad situation on site we are not going to proceed with any more works for you. We have secured our works on site at this stage and are not going to continue. As you are aware the situation has been bad for the last few weeks. As you know your behaviour was out of control many times. You were very rude, argumentative and aggressive towards us and our employees. As a company with years of experience and good reputation we cannot accept that. All our payments were up to date and the money which is left unpaid from this project is enough for you to carry on and finish all the works which are included in our quote. We hope you will find another contractor to finish your project…..”
“Please see below a breakdown on our fees to date on your project: Measured survey of the house, preparation of accurate existing survey drawings in CAD….. Meetings, consultation, preparing of architectural drawings for the basement and ground floor extension, flood risk assessment, project review with the client submission of planning application for ground floor extension to H&F Planning Department… After our meeting with the Planning Officer I will send you a detailed fee break-down for our involvement on the basement project and submission of a new planning application.”
“I confirm that we have been appointed as the Project Structural Engineers and the temporary works Engineers. We will be visiting a site (sic) approx 2-3 times per month to monitor progress of the construction works.”
“there are many more other comments and observations but these are very technical which are mainly needed by us, engineers to progress a design.” 107.6. MGA provided detailed construction drawings, which Mr Gustyn sent to Miss Martell, and told her she could provide them to contractors for quotation purposes. From that, she clearly understood that they contained the details that the contractors would require. 107.7. When she was unable to get to site as she was looking after her uncle in Northumbria, Mr Gustyn sent her photographs and updates on the progress at site. 107.8. In April 2015, Mr Gustyn emailed Miss Martell saying “generally no issues on site; minor issues and queries are being resolved on site level”
“the drainage, waterproofing, insulation etc has not been detailed on our Engineering drawings. This is usually to the Contractor’s design and to Building Control satisfaction. At the end of the project [GSB] should provide to us (me, you and Building Control) a certificate from the registered installer with min 10 years of guarantee. That’s normally what they do and other contractors do on similar project to this.”