“d. Sequence of backfilling - what spec. of material do we need? Can we re-use dumped in situ material or do we base it on “as dredged”
“2.3 Technical proposals – [Van Oord] to provide suitable wording for submission to Engineer for requirement and licence of Grimsby middle sand for backfilling. Clarification required whether side casting of fill is acceptable. 2.4 Grimsby middle sand - self replenishing used generally about every two years. [Van Oord] will shortly be dredging from it for filling Grimsby docks.”
“(c) We are considering using “as dredged sand” (D 50 ~ 250μ) from the “Grimsby Middle” as backfill. We understand that the authorities prefer that the licence application is made by the client. Can you assist in this matter? In respect of our commercial position is it possible not to publish this question (c) and your reply to our competitors?”
“It is the intention of Kier Construction to use Mouchel for the provision of tender design and support for the project and if the bid is successful for that design to be developed into working details.”
“Review all available data particularly hydro graphic and siltation data. … Determine requirements for …: Scour protection …
“(a) review client brief. licensing aspects, relevant reports, hydro graphic and siltation data and identified problem areas including potential for siltation; … (d) investigate wave conditions, frequencies and wave forces on intake and outfall; (e) determine type and extent of scour protection.”
“Van Oord and Smit between them would take on the risks associated with the volume of sand in the bed of the trench. They would also agree on a good quality of sand suitable for the bed, not necessarily the Grimsby Middle as the sand had to be suitable for pumping. … The outfall diffusers would be installed on the last unit before it was lifted from the casting yard. The intake diffusers would be installed as separate units, with the navigational lights already attached to one of them. Van Oord would supply and place the scour protection, to be designed by Mouchel.”
“Scour protection: Proposal is for 500 kg to 1000kg rock. Quantity about 2,600 Cu m (spread to a distance of 10 metres all round intake structures).”
“1.0 Review tender design and agree modifications with Kier. 2.0 Obtain, review and interpret additional wave data to obtain 1 in 100 year design wave. … 5.0 Detailed design, design basis statements and preparation of working drawings and bending schedules for : … (vii) scour protection to intake and outfall 6.0 Review of Client materials and workmanship specifications and preparation of additional clauses as required. 7.0 Preparation of design submissions for the Client to review and participation in the review process.” 2.0 Obtain, review and interpret additional wave data to obtain 1 in 100 year design wave. … 5.0 Detailed design, design basis statements and preparation of working drawings and bending schedules for : … (vii) scour protection to intake and outfall 6.0 Review of Client materials and workmanship specifications and preparation of additional clauses as required. 7.0 Preparation of design submissions for the Client to review and participation in the review process.”
“● supply and placing of approx. 500 kg to 1,000 kg rock; indicated volume by Kier max. 2,600 m 3 approx. layer thickness of 600 mm we refer to your fax dated15th April 1994 ● spreading of rock to a distance of 10 metres all around intake structure at 2 locations ● rough grading and levelling of the rock” we refer to your fax dated15th April 1994
“In the case of a conflict between our specific conditions detailed herein and any of your standard conditions or any of the Main Contract Conditions, then our conditions shall prevail.”
“We have based our offer on the tender documents and drawings received from you, further clarified in our Addendum 1.1 with our Scope of Works and the subsequent Tender Addenda No.1 and No.2 subject to the conditions detailed hereafter.”
“We are not in a position to accept this clause as we are not responsible for the design of the offshore tunnel structures. We will backfill the trench to the levels as indicated and requested by you and after completion of the backfilling works we have not allowed for any maintenance period/defects correction period.”
“Our Lump Sum rate for backfilling is based on providing “as dredged” sea sand from the Grimsby Middle borrow area approx. 4.50 nautical miles from site. In our offer we have allowed for the current royalties of£0.90 /m 3 but require reimbursement for the actual cost net at the time of execution.”
“The proposal is based on the assumption that the rock can be placed directly after backfilling the works with sand, and that there are no obstacles in place such as diffuser domes etc. during the rock placing operations.”
“The design works for which the contractor is responsible will be carried out by [Mouchel].”
“Query: Please provide details of the backfill material for the culverts and your assessment/calculation of the stability of the backfill. Contractor’s reply: Grimsby Middle sand to 2 metres minimum above the culverts. We do not expect it to be significantly disturbed by tides or currents.”
“Query: With reference to your response to K31, how will you satisfy yourselves that the selected back fill materials will provide a stable river bed during the design life? Contractor’s reply: The fill material is no less stable than the surrounding estuary bed and should therefore not suffer long term erosive effects. Furthermore, there is a minimum of 2m cover provided ensuring adequate margin against extreme events.”
“i) Likelihood of problems occurring ii) The adequacy of existing data iii) What additional information should be obtained iv) What additional studies and/or numerical modeling would we recommend should be undertaken.” iv) What additional studies and/or numerical modeling would we recommend should be undertaken.”
“1) The expected gradings of the Grimsby Middle sand with which you intend to backfill over the culverts within the trench. This is required in order for our Consultants to complete the stability calculations. This follows requests by ABB Power Plants Ltd for ‘assessment/calculations of the stability of the backfill’. 2) Your fax to us on the 25/2/94 referred to using this material (D50~250m) please also advise of this significance.”
“Please note that we have used this method to backfill the following trenches in the past 1) 1992/93 1395m long outfall for Ciba Geigy at Pyewipe 2) 1991350 m long cooling water intake trenches at Killingholme Power Station (Powergen)” + old Zanen projects + old Zanen projects 4) 1982 2600m long Pyewipe outfall for Anglian Water. We are not aware of any stability problems with the backfill on any of these past pipeline projects which are all very close to [South Humber Bank Power Station].”
“A series of samples collected from the Grimsby Middle Sand source have shown that the medial grain sizes is 210 to 222μm with an average of 214μm. The source is well sorted with <5% of the material finer than 1—μm. Material from this source has already been used to backfill trenches at the following locations: Ciba-Geigy outfall at Pyewipe, 1395, long, 1992-1993 Tioxide outfall at Pyewipe, 2500m long, 1987 Anglian Water outfall at Pyewipe, 2600m long, 1982 We are not aware of any stability problems with the backfill on any of these projects which are all close to the South Humber site. ”
“Given the nature of the site, periodic erosion and deposition of the existing organic clay at the seabed is likely under existing and post construction conditions. With Grimsby Middle Sand in place the fine material will tend to fill the interstices and to smooth the roughness of the bed. As a result the potential for erosion at the bed will be reduced. Any changes in bed level post construction are unlikely to be outside those which currently occur given the dynamic tidal and wave conditions at the site. Under extreme conditions some movement of the backfill is likely but not to the extent that the buried culvert (>2m below bed level) will be exposed. It should be noted that erosion of the backfill under extreme conditions will be no more severe than that of the existing bed material. A more detailed analysis using the full capabilities of LITPACK will be undertaken during the detailed design stage to verify these preliminary conclusions.”
“The Works comprise both offshore and onshore sections. The offshore works are to be procured on a fixed price lump sum design and construct basis and the onshore works on a measure and value basis from the Employer’s design. The offshore works include the intake and outfall structures, with the intake and outfall culverts up to the external north-east face of the pumphouse and seal weir...” (2) Clause 4.4.16 of Section A Particular Requirements (Volume 2 Part (i) of the Employer’s Requirements): “Scour protection shall be placed around the intake structures to prevent erosion of the bed. The top of the layer shall be flush with adjacent bed level.” (3) At Clause 4.4.25 of Section A Particular Requirements (Volume 2 Part (i) of the Employer’s Requirements): “Scour protection will be placed around the outfall structure to prevent erosion of the bed. The top layer shall be flush with adjacent bed level.” (4) At Clause 4.4.27 of Section A Particular Requirements (Volume 2 Part (i) of the Employer’s Requirements): “The minimum cover to the offshore conduits shall be 2.0m.” (5) Clause 1.2.4 of Section B Technical Specification for the Civil Works (Volume 2 Part (ii) of the Employer’s Requirements): “Portions of this specification provide performance requirements for materials and workmanship to be furnished by the Contractor. The Contractor shall perform and assume responsibility for his design and/or testing for product qualification as needed to justify the work and satisfy this specification.” (6) Clause 1.3.1 of Section B Technical Specification for the Civil Works (Volume 2 Part (ii) of the Employer’s Requirements): “All Articles and material shall be new and of good quality suitable for the purpose specified and shall, unless otherwise specified in the Technical Specification, conform to the appropriate Specifications, British Standards, Codes of Practice, IEE, American Standards or other recognised Standards where stated, in that order of precedence.” (7) In relation to immersed tube tunnels at Clause 22.1.2 of Section B Technical Specification for the Civil Works (Volume 2 Part (ii) of the Employer’s Requirements): “The Contractor shall be entirely responsible for the design and provision of all permanent and temporary works associated with immersed tube tunnels in accordance with the requirements of Section A.” (8) In relation to specific design parameters at Clause 22.7.4 of Section B Technical Specification for the Civil Works (Volume 2 Part (ii) of the Employer’s Requirements): “The backfill material to the finished structure shall be so designed and constructed as to maintain the tunnel in the required position, provide protection from erosion and restore the sea bed to its original profile and condition.” (9) In relation to specific design parameters at Clause 22.7.5 of Section B Technical Specification for the Civil Works (Volume 2 Part (ii) of the Employer’s Requirements): “Anti-Scour material shall be placed around the intake and outfall structures so as to prevent localised erosion of the sea bed and ingestion of sediment into the culvert.”
““The Sub-Contract works” means the works described in the documents specified in the Second Schedule hereto.”
“Save where the provisions of the Sub-Contract or otherwise require, the Sub-Contractor shall so execute, complete and maintain the Sub-Contract works that no act or omission of his in relation thereto shall constitute, cause or contribute to any breach by the Contractor of any of his obligations under the Main Contract and the Sub-Contractor shall, save as aforesaid, assume and perform hereunder all the obligations and liabilities of the Contractor under the Main Contract in relation to the Sub-Contract Works.” (5) In the Second Schedule at paragraph B the “sub-contract works” were described as: “The provision of plant and/or tools labour and materials for the sub-contract works of dredging and backfilling as specified and in accordance with the above mentioned documents and terms at South Humber Power Station CW Works.”
“Having completed this aspect of the design, we would note that the type of material required for scour protection around the risers corroborates our earlier concerns regarding the potential stability of Grimsby Middle Sand for backfilling the dredge trench up to original seabed level. We are still awaiting information from Van Oord relating to performance of their proposed material on previous projects in the area, and would appreciate your assistance in expediting release of this. If in fact there is no data available demonstrating that the Grimsby Middle sand is stable under the prevailing conditions then we will need to further consider laying of a larger grading protective layer at the top of the trench backfill.”
“Generally, the surveys suggest that the seabed has not significantly eroded over the 3 month period. However, Van Oord have not provided the supplementary data requested detailing depth and width of the dredged trench, and caution should therefore be exercised in concluding that the South Humber trench will also be stable if backfilled with Grimsby Middle sand. As we have discussed, our predictions are that Grimsby Middle sand placed as trench backfill may be liable to erosion by river currents, this conclusion being based on the limited river current data available. However, prediction of erosion of bed material in this context is not well documented. Indeed, Van Oord’s experience is that the proposed backfill is stable in a similar environment, albeit in narrower trenches. Following our recent discussions on the subject we confirm our opinion that, whilst Van Oord have been unable to demonstrate using previous project data that erosion of the Grimsby Middle Sand will not occur, it would be reasonable to backfill over the culverts with this material as proposed and to monitor stability over the one year of the contract period remaining after programmed completion of construction. In the event that erosion does occur during that time, then a larger sized protective layer may be installed over the lengths of backfill found to be the subject to erosion.”
“Backfill material has been assessed by M. West and M. Caporilli. Possible instability identified and basis for proceeding agreed with Kier.”
“The trench round the units will be backfilled using Grimsby Middle Sand. Due to its fineness, this material may be susceptible to scour. However it is understood that the culverts are situated in an area of deposition where siltation is likely to take place. It is therefore proposed that the backfill will be monitored over a six month period and suitable measures could be taken if necessary.”
“Please justify your selection of backfill material. “May be”, “it is understood” and “taken if necessary” are unacceptable terminology. Your answer to questionnaire K306 gives a preliminary assessment and states “a more detailed analysis…will be undertaken during the detailed design stage to verify these preliminary conclusions”.”
“The trench around the culvert units will be backfilled using Grimsby Middle Sand. Due to its fineness, this material may be susceptible to scour. However the culverts are situated in an area of deposition where siltation is likely to take place. The backfill will therefore be monitored over a six month period to identify any occurrence of scour and to take any ameliorative measures necessary, such as armouring of the backfill.”
“It can clearly be seen that the as-constructed sea bed profile in the vicinity of the intake and outfall culverts is substantially lower than the existing sea bed either side of the culvert trench, and in particular, is lower than the required minimum cover. Although the report states that there is good rock cover around the structure, the depth of the rock was not determined and it is unlikely that the required depth of scour protection has been achieved. It obviously has not been achieved around the intake structures, where the total cover to the culverts is less than the required rock thickness. Based on the available information from the Divers Report, we are also concerned that the backfill over the rest of the culverts may be below the required level. We would like to see further survey reports which could confirm this or otherwise. On the basis of the survey information submitted, additional rock placing around the Intake and Outfall structures appears to be required.”
“Results of ABP survey show fill to culvert trench is missing. A Van Oord representative present during the survey requested a different frequency be used at certain points during the survey - this only yielded differences in result of the order of 100mm. Results will be forwarded to [Kier] shortly.”
“The survey shows significant differences in level from your out survey particularly between the [inlet] and outfall structures.”
“It would appear that the scour protectionaround the outfall structure is still relatively intact, but the scour protection around the intake structure has already been partly undermined. There is particularly heavy scour evident just to the landward and eastward sides of the intake scour protection and, although we do not have any survey information on the seaward limit of the intake we would assume this area may also be undermined. We feel there is no danger of the scouring undermining the culverts themselves as they will act as an obstruction to the scour effects.”
“it appears that the scour protection has been placed below the correct levels and with insufficient thickness.”
“a) From chainage 1750 eastwards to the deep channel remedial works are the liability of Kier. b) From chainage 1750 to chainage 1590 [Van Oord] accept the liability to replace the backfill material to the originally reinstated levels once only if the loss of this material is due to the action of normal river currents. Van Oord liability would be limited to the volume assessed from a hydrographic survey to be carried out in early June 1996. Should the loss of material prove to be due to the turbulence effect from the diffusers and corresponding lack of designed scour protection then remedial works are not the liability of [Van Oord] Van Oord aim to fully discharge any liability by providing an appropriate commercial rebate to be agreed prior to mobilization for the remedial works. c) From chainage 1590 to 1480 remedial works are the liability of Kier. d) From chainage 1480 inshore up to the cofferdam the liability lies as in b) above. All of the above does not relieve [Van Oord] of their originally envisaged liability for backfill between initial reinstatement and seabed levels. ”
“The three inlet towers are surrounded by rock to similar levels to our previous survey of February 1996 and except for one location (see plan) the bed is completely covered in rock around the towers out to 15 metres in all directions except offshore where the rock ends at 10 metres away from the tower. … Close to the inshore tower on the up river side there is a large scour hole. This has been caused by [an] eddy-current based by the tide hitting the tower wall and scouring out the thin layer of rock close to the tower. The bed in this area is now backfill sand in the bottom of the hole and this problem needs backfilling generally…. Our survey of Feb 1996 picked up the low rock cover close to the towers with the guides exposed and this scour hole is a problem caused directly from this lack of rock cover.”
“With reference to our ongoing discussion with respect to the remedial works and with particular reference to the section from chainage 1750 to chainage 1590 referred to in (b) of your letter, we understand that you/your designers consider it necessary to blanket the whole of this area with not only rock armour but also a filter layer on top of replaced Grimsby Middle sand. In our view this revised design, by inference, confirms the inadequacy of the initial design. We therefore consider that we have no liability for replacing Grimsby Middle sand in this section.”
“Field data, modelling and desk calculations have confirmed that the Grimsby Middle sand used as backfill is susceptible to erosion at the outer end of the Power Station intake outfall. Inshore of about 1,400m it will remain stable except under the most severe storm conditions. During neap tides however some deposition should occur. Erosion is predominantly influenced by spring tidal currents. Wave action particularly storm events will increase the erosion rates particularly on springs. The flow regime in the Humber between Grimsby and Immingham shows that the erosion potential at the ends of the Ciba-Geigy (Tioxide) and Anglian Water (Pyewipe) outfalls is less than at the new outfall and generally equivalent to the conditions which would be experienced from about 1,400m shorewards on the new outfall. This would therefore explain why erosion of these outfalls has not been a problem.”
“We will not be responsible for the design of any of the permanent and temporary works for the offshore and onshore works as defined in Section 1.3.1 of Volume 2 - Part (I), Section ‘A’ and Section 1.2 of Volume 2 - Part (II), Section ‘B’. We can only take responsibility for the design of the trench slopes during the duration of our sub-contract works.”
“All Articles and material shall be new and of good quality suitable for the purpose specified.”
“The backfill material to the finished structure shall be so designed and constructed as to ... provide protection from erosion and restore the sea bed to its original profile and condition.”
“A person who has made or agreed to make any payment in bona fide settlement or compromise of any claim made against him in respect of any damage (including a payment into court which has been accepted) shall be entitled to recover contribution in accordance with this section without regard to whether or not he himself is or ever was liable in respect of the damage, provided, however, that he would have been liable assuming that the factual basis of the claim against him could be established.”
“When any claim for contribution falls to be decided the following questions in my opinion arise: (1) What damage has A suffered? (2) Is B liable to A in respect of that damage? (3) Is C also liable to A in respect of that damage or some of it? ... I do not think it matters greatly whether, in phrasing these questions, one speaks (as the 1978 Act does) of "damage" or of "loss" or "harm", provided it is borne in mind that "damage" does not mean "damages" (as pointed out by Roch LJ in Birse Construction Ltd v Haiste Ltd[1996] 1WLR 675 , at p 682) and that B's right to contribution by C depends on the damage, loss or harm for which B is liable to A corresponding (even if in part only) with the damage, loss or harm for which C is liable to A. This seems to me to accord with the underlying equity of the situation: it is obviously fair that C contributes to B a fair share of what both B and C owe in law to A, but obviously unfair that C should contribute to B any share of what B may owe in law to A but C does not.”
“The critical words are "liable in respect of the same damage." Section 1(1) refers to "damage" and not to "damages": see Birse Construction Ltd v Haiste Ltd[1996] 1 WLR 675 , 682 per Roch LJ. It was common ground that the closest synonym of damage is harm. The focus is, however, on the composite expression "the same damage"…. The legislative technique of limiting the contribution principle under the 1978 Act to the same damage was a considered policy decision. The context does not therefore justify an expansive interpretation of the words "the same damage" so as to mean substantially or materially similar damage. Such solutions could have been adopted but considerations of unfairness to parties who did not in truth cause or contribute to the same damage would have militated against them. Moreover, the adoption of such solutions would have led to uncertainty in the application of the law. That is the context of section 1(1) and the phrase "the same damage". It must be interpreted and applied on a correct evaluation and comparison of claims alleged to qualify for contribution under section 1(1). No glosses, extensive or restrictive, are warranted. The natural and ordinary meaning of "the same damage" is controlling.”
“The extent of a person’s responsibility involves both the degree of his fault and the degree to which it contributed to the damage in question. It is just and equitable to take into account both the seriousness of the respective parties’ faults and their causative relevance.”