“Install double glazing windows Install full gas central heating Upgrade partial heating to full Upgrade roof insulation Install smoke detectors Kitchen re-planning Bathroom re-planning Install mechanical extract fans Security Installation of entry phone systems for flats Car parking Solid wall Insulation Environmental Improvements”
“The Group discussed what the standard should include (see notes attached) and Marlene is to produce a more concise version of the standard (see attached) in a draft format, to be circulated with the minutes. All Members agreed to check this for omissions and to respond to Marlene with amendments by18th March 2004 ." The attached notes summarise briefly the headings of the Decent Homes Standard, adding: "But we want better!" The notes went on setting out some general heads like "Structurally Safe-Smoke Alarms”, "Insulation/Energy Efficient-Ventilation", "reasonably aesthetically pleasing to tenants", "Wiring-Sufficient to meet 21st Century Standards", “Bathrooms…Includes security aspects as appropriate-window locks, lighting, door alarms, identislot, magic eye…” and "Safety-exit in case of fire". There were two lists of "what do we want from" windows and doors. Windows would be required to be PVCU, double glazed, to be lockable and provide a fire exit as well as adequate vents. For the doors security was to be by "5 lever locks etc” and "identislots”
“All window designs for the PHS will comply with the standard determined by BS7950 as a minimum and will incorporate any requirements were possible for Secured By Design. 3.1 TC outlined the agreement:- All downstairs windows are able to have key operated window locks provided not an inner room situation. All 1st floor rooms should have at least 1 window that is a fire escape window and not obstructed with locks. These windows may have laminated glass fitted. If more than 1 window in a room then one of those windows can be fitted with a lock…”
“Dwellings and communal areas (when appropriate) should 1) Be free from structural defects that affect the soundness, safety and stability of the dwelling 2) Provide an effective barrier to the elements and normal patterns of weather with no penetrating or rising dampness 3) Provide affordable warmth through programmable, efficient heating and hot water systems, together with adequate ventilation. 4) Have a safe electrical installation conforming to the current IEE requirements with adequate provision of power outlets and lighting points 5) Provide an effective means of escape in case of fire and be resistant to the spread of fire, have appropriate fire detection and alarm systems fitted 6) Provide sanitary fittings with bathing and/or shower facilities together with hygienic services, a clean supply of drinking water and a satisfactory drainage system 7) Provide security measures to deter crime, both in the fabric of the property and in the surrounding environment 8) Provide an aesthetic appearance and design features to satisfy Tenants requirements 9) Provide rooms for sleeping that is separate from other habitable rooms to fulfil current and new Tenants’ aspirations 10) Take into account people's disabilities in terms of design and access 11) Provide modern kitchen with satisfactory cupboard/storage space, worktop areas and hygienic services, with accommodation for a range of white goods wherever possible. 12) Wherever reasonable to provide in-curtilage garden areas with approach paths, parking, clothes drying, fencing and gates appropriate to the dwelling types”
“…debate about the level of detail which should go in the offer document re improvement work. [Mr Deacon] suggested that it should be basic info plus details of the process of how tenants can be involved in making local decisions. Agreed [Mr Roberts] to ask Savills to look at the stock condition survey & break down work needed into the 10 [Local Community Areas]. PJD/NB/AJ/PR to discuss further.”
“1. AJ [Mr Johnson] set out the remit for the Group. Looking at specifics within the offer document. Need to ensure that document is ‘Gatewayised’. 2. PH [Mr Heath, the Wright Hassall solicitor] advised not to go into great detail within the document. Advice notes & information material should underpin the document but not form part of the formal offer. 3. NB [Mr Bliss] advised the offer document is legally binding on the new landlord and contents feed into business plan. 4. AJ important to focus in the document on what is important to tenants… 6. NB concerned that content of document should reflect Community Gateway… 7. PH said it was important for Communications consultant [N Winn of Bridge & Co] to be involved in leading in writing the document. 11. GG advised that tenants needed to be involved via workshops. 12. GG said it was important that offer document is simple for all to understand. Also it shouldn’t constrain future local decisions on how money should be spent. 13. AJ advised offer should have some specifics to make it attractive but not enough to tie up all the funding. 14. GG advised it should say in the offer that there is money for local choice… 16. Re improvement group AJ to take info from stock condition survey and produce discussion document re work needed at City wide level… 19. KP [Karen Perry] said important to link work with tenants on improvements to work already done with tenant reps on Preston Homes Standard (PHS)/partnering etc. KP to send list of names to NB and copy of PHS to all… 21. AJ to lead the improvement working group. First meeting to be arranged for PM on 15/7/04. AJ to produce short pre meeting discussion note…”
“Building control/fire regulations to consider”
"Windows & doors, Kitchens Bathrooms, Heating, Rewires, Roofing, Replaced fascias, soffits, barges & rainwater goods with PVC, Fencing & paths, Off street parking, Curtain walls, Asbestos removal, Security, burglar alarms & identislots [and] External painting, pointing & repairs"
“Items needed to make wind and water tight-e.g. external doors double glazing, central heating, insulation… extractor fans, specifically mentioning condensation issues improvements relating to security environmental works that all homes should have some works done in year one and subsequently on a gradual basis… the Preston Homes Standard-there was a discussion about inclusion of PHS clauses-translated into better English-it was mooted that there is a particular difficulty about including clauses relating to removal of bedsits. GG suggested the CGA Board could adopt a Gateway Homes Standard with the relevant clause removed. PD to give this further consideration…”
“The costs of repairing, maintaining and improving the housing stock are based on the results of the stock condition survey carried out by, and subsequently updated by, FPD Savills in November 2003”
“extractor fans would be provided to those homes that need them to tackle condensation”
“£80m in repairs and improvements in the first 5 years with enough £’s in the Business Plan to keep properties at this standard for next 30 years”
“I have made one further amendment to the Offer Document. I have added the words "when needed" in the first bullet point after the title "The Key Benefits of Transfer" (Section 1). It is essential that the document does not offer new kitchens/bathrooms/windows to all tenants as some tenants may recently have had such work carried out and as such these facilities are already ‘new’. Without such wording, the RSL may potentially be promising to replace all windows etc where in some cases it may not be needed.”
“George congratulated everyone who had been involved in developing a good document. It contains a lot of commitments that are appropriate to set high standards in improvements and tenant involvement…”
“…indicating that the basis for the improvements programme was the stock condition survey that had been carried out, and what had been included in the offer document.”
“3.1 MB introduced a discussion on the improvements programme by suggesting that the overall aim of the programme was to "get the best out of the money that is available, delivering high quality improvements and involving tenants in the decisions about what is to be done and how these improvements should be carried out". The meeting agreed that this was a good definition of the aim of the improvements programme. 3.2 MB went on to discuss information available to inform the programme: • the stock condition survey (SCS)-DG discussed the SCS. It was carried out on approx 3000 homes out of 6607 homes-a comparatively high percentage of homes surveyed. The SCS has informed the business plan in terms of how much money is needed to improve their homes. About£15 million is needed to bring the approx. 50% of homes that currently failed the Govt’s Decent Homes Standard (DHS); and about£15 m is needed to ensure the other homes do not fail DHS in the future. The SCS also carried out an energy efficiency survey. PHS [a tenant] pointed out that there are some cases where previous improvements have not been done satisfactorily, but that the surveyors may not have picked this up. • the asset management plan… • the Offer Document-a "contract" with the tenants. The programme has to deliver what the offer document says about improvements • the Preston Homes Standards Group-a group (that included tenants) that has defined some standards of improvements-most notably on doors and windows. DG outlined that key issues regarding windows had been security, fire safety, lockability (using pushbuttons), being police approved…. • consultation at PNE [Preston North End] event-September 2004-where tenants were invited to view various potential improvements (kitchens, bathrooms, doors, windows etc). MB indicated that most people had been reasonably happy with the proposed level of improvements, but there had been some concerns on windows…PHS indicated that people have been particularly happy with the quality of door on offer…”
“How business plan numbers are derived • Figures from stock survey • Plus fees allowance (8%) • Plus VAT (17.5%) • Above adjusted for VAT shelter (-4.5%) • Adjusted for actual stock numbers • Adjusted for inflation and growth in prices" Under another heading "Other Issues", the following appeared: “SCS set parameters Programmes to be prepared within parameters…”
“…The CGA considered that burglar alarms should only be provided to vulnerable people, or to all the homes in particular area [sic] that have been identified as having particular problems. They should not be provided as a matter of course to anyone accepting a new home…”
“Priority1-external features to buildings that would make homes wind and water tight was seen by all groups to be the most important priority. In particular, the following was seen as high priority by most groups: • windows • external doors • external communal doors • rainwater goods (e.g. guttering, fascias, soffits) • roofs and chimneys • roof and cavity wall insulation • damp proofing External wall finishes, external wooden items, balconies and soil vent pipes were also seen as important priorities probably because they could be done alongside some of the other works listed above. Health and safety items such as security lighting, smoke detectors and carbon monoxide detectors were seen by some groups as high priority Other elements suggested as high priority by only some groups included: • internal communal doors… • central heating and partial central heating • kitchens and bathrooms… • re-wiring • extractor fans…”
“STOCK SURVEY • three separate surveys by FPD Savills… • total numbers of stock surveyed now over 50% • from the merged results of all surveys, whole stock reports can be produced… • costs in the database are current actual costs THE PROGRAMME • The programme covers the first 5 years after transfer of October 2005-October 2010… • It reflects members’ priorities agreed in September 2003 and reconfirmed and further elaborated on at the Member Event on22 April 2005 • All properties to have some work carried out to them within 2 years of transfer… BUSINESS PLAN • The programme is based on the latest version of the BP and cash flow projections. The total provision in the BP will be sufficient to carry out all the promised improvement work • The money available to spend on improvements each year is limited to the total amount included in the BP for improvements for that year… PROMISES • Totals of improvements equal those in the offer document… ELEMENTS OF WORK • The programme groups improvements under headings that contain the detailed elements reported in the stock condition survey database • Windows & doors-installation of PVCU double glazed windows and replacement of at least one external door • External Doors-installation of one or more external doors (for properties that do not require new PVCU windows) • Gas central heating-replacement of existing heating systems for Health & safety reasons, installing heating for the first time, upgrading partial heating to full or replacement of a gas heating boiler. Insulation and ventilation works are also included where required • Roofs… • Rainwater goods… • Kitchens-replacement of kitchens to the Gateway Homes Standard (not like for like), incorporating…smoke alarms • Bathrooms-replacement of existing sanitary fittings, improved layout, wiring for showers, ventilation and wall/floor finishes. • Estate works… • Sheltered accommodation Communal areas… • BISF houses… • Security works- e.g. security lights, fencing/gates, burglar alarms etc. to improve security/safety of properties/occupiers • Curtain walls…”
“Difficulties on this and other unknowns, like IT and accommodation fit, making completion of financial projections a moving target. VAT shelter and additional gap funding looking increasingly necessary to deliver all the planned benefits of transfer." Mr Johnson was charged with using his "best endeavours to get a credible Business Plan ready for Housing Corp.”
"…we were guilty of underestimating the CGA’s management costs. This is linked with the number of changes that are outside the control of the CGA has resulted in a need for a very large increase in the need for Gap funding."
“I thank you for spending time with colleagues last month …when they came to see you, Sally and John about the financial difficulties that we were and still are, unfortunately, facing in relation to our stock transfer here in Preston. …we have very reluctantly delayed the date of transfer from 10th October to 28th of November 2005. None-the-less, we are still committed to ensuring that this stock transfer goes ahead… I can confirm that following a consultation with Tenants, the Board of Community Gateway Association have agreed to seek charitable status and arrangements are now well in hand to achieve this. On the other financial projection issues, over the last four weeks we have been assembling information regarding the items that we discussed. Our discussions with Community Gateway Association have been robust and searching…We believe that we have reached a "bottom line position" that will ensure that Community Gateway Association is able to run its business and deliver the promises made and we feel that the proposal that we are presenting to you represents the most realistic, economical and balanced way forward. However, we do require further assistance from you, the Government and, in particular, the Housing Minister, if we are to realise our ambitions for the future. To ensure that Community Gateway Association is a financially viable organisation we would request that the amount of Gap Funding be increased from£31,291,882 by an additional amount of£16,706,874 . We (the Council) and our Advisers are satisfied that this amount is needed and the justification is contained within the attached report. We have also submitted a new Single Transfer Model and Cost Generation Model and would very much appreciate your assistance and advice…”
“As you will see we can live with most of the changes but are concerned with the increase in the management costs…”
“We have reviewed the stock condition survey to confirm that the promises as identified above have been incorporated within the survey and are scheduled to be carried out by the decent homes deadline of 2010. In carrying through the transfer promises the Board should be aware of the specification to which the stock condition survey has been costed in assessing the delivery of those promises at no greater than the costs projected within the Business Plan.”
“4. The letter we sent to the Council of9 September 2004 indicated that the project had gained a place on the Disposals Programme 2004 and that ODPM intended to pay gap funding grant…up to a maximum of£31,291,883 for the grant recipient on the basis of a minimum valuation of£31,291,883 . Since then the agreed minimum valuation has been revised to£47,998,756 . As a result ODPM now intends to pay gap funding grant to the grant recipient as a contribution to eligible expenditure on the project up to a maximum of£47,998,756 over a period of ten years from 2005/06 to 2015/16 inclusive. Equal payments covering£31,291,883 will be made over the first five years and the remaining£16,706,874 will be made over the next five years. This is subject to the grant recipient meeting the agreed milestones set out in the attached Schedule A… 8. Eligible expenditure consists of payments made by the grant recipient to achieve the transfer and thereafter which contribute towards the costs of meeting milestones for the project…”
“Valuation of the Stock The indicative valuation of the housing stock that has previously been produced will need to be refined in light of current circumstances to produce a Tenanted Market Value satisfies [sic] both parties, ODPM and funders. Working closely with the relevant officers we will review all assumptions used in the valuation calculations, measure their sensitivity and incorporate the agreed offer to the tenants”
“Adaptations to consider progressive nature of disability ie ramp not required now but may be required at a later date. Adaptations built into overall scheme of works Occupational Therapy service to fast track assessments for disabled applicants and incorporate into capital schemes of work.”
“Homes should...Take into account people’s disabilities in terms of design and access.”
“a detailed list of specific works to be done is on a list which can be inspected”