“Nothing contained in the Specification shall override or modify the application or interpretation of that which is contained in the Agreement or the Conditions of Contract”
“1. Consent to discharge from site (if required) underWater Resources Act 1991 2. Special orders for abnormal load movements 3. Waste Management Licence during construction 4. Consent under Town and Country Planning Act for erection of signage together with any non-planning related or temporary consents, licenses, permissions, assessments, orders and approvals require[d] in relation to the construction of the Works and the Contractor’s construction methodology but not including the Purchaser’s permits.” (b) Schedule 15 “The Presumed Ground Conditions are those described by items 1 to 6 of the Agreed Conclusion to Tender Questionnaire Item AA 010b, which is included in Part 4 of the Purchaser’s Specification”
“The Contract is based upon the following assumptions… 5. Water Table: For open excavations, inflowing groundwater will not affect the stability of the excavation and can be controlled using sump pumping provided by the Contractor… The tenderer confirms that no other assumptions regarding the existing ground conditions at the Site have been necessary in arriving at the design of the Works…”
“QUESTION TITLE: GROUND CONDITIONS: "CURRENT UNDERSTANDING”
"Should ground conditions prove to be different from our current understanding we reserve the right to revise our price."
“8.3 Design Mitigation 8.3.1 Construction Phase It is not anticipated that there will be any environmental impact or effect on the marine environment associated with the construction of the Seawater FGD Process, hence no mitigation is proposed… 8.4 Predicted Impacts and Effects 8.4.1 Construction Phase The Seawater FGD Process will use the existing outfall structures to discharge waste water to the marine environment. Hence there will be no construction impacts.”
“3.1 A release from the Authorised Process into controlled waters from a release point specified in Table 3.1 shall arise only from the source specified in that Table and shall be released only into the receiving waters specified in that Table. TABLE 3.1 Outlet Number Location Effluent Receiving waters 2 Twin concrete discharge structures [grid references given] Releases from B station: Water treatment plant, condenser cooling water, boiler blow-down combined with water from dirty drains within B Station power plant building discharge via underground oil interceptor pit and, surface water run-off. The Severn Estuary 3 0.9 metre (36’’) diameter pipe at [grid reference] Surface water drainage from fuel oil storage via the tilting plate oil separator and coal plant areas and associated road drainage The Severn Estuary 3.3 The determinands measured in releases from the Authorised Process into controlled waters shall not exceed the relevant limits or criteria specified in Tables 3.2 and 3.3. TABLE 3.2 Discharge reference Location of Outlet Nature of Discharge Daily Volume (m) 1B Twin concrete outlets at [Grid reference] Condenser cooling water - 2B Twin concrete outlets at [Grid reference] Water treatment plant effluent 540 3B Twin concrete outlets at [Grid reference] Storm water and surface drainage Dependent on weather 4B Twin concrete outlets at [Grid reference] Boiler blow down water 1705 5B Twin concrete outlets at [Grid reference] Boiler gas side washings dust and acidic deposits 455 6B Twin concrete outlets at [Grid reference] Dirty water from drains within B power plant building - TABLE 3.3 Determinands Outlet No 2 Outlet No 3 Suspended solids determined as the differential concentration between incoming and outgoing water (mg/l) (a) 50 - Suspended solids ((mg/l) (a)… - 200 (a) One sample shall be taken and analysed each week. Suspended solids are to be measured following drying at 105°C…” “Authorised Process” was defined in Part 9 as meaning "the process subject to this authorisation", which clearly meant the power station process. (a) One sample shall be taken and analysed each week. Suspended solids are to be measured following drying at 105°C…”
“(1) A person contravenes this section if he causes or knowingly permits any poisonous noxious or polluting matter or any solid waste matter to enter any controlled waters.