“(5) Any cause of action in respect of a breach of the duty imposed by this Section shall be deemed, for the purposes of theLimitation Act 1939 , theLaw Reform (Limitations of Actions, and etc) Act 1954 and theLimitation Act 1963 to have accrued at the time when the dwelling was completed…”
“Section 1 (1) A person taking on work for or in connection with the provision of a dwelling (whether the dwelling is provided by the erection or the conversion or enlargement of a building) owes a duty – i) If the dwelling is provided to the order of any person, to that person and: ii) Without prejudice to paragraph (a) above, to every person who acquires an interest (whether legal or equitable) in the dwelling… to see that the work which he takes on is done in a workman-like or, as the case may be, professional manner, with proper materials and so that, as regards that work, the dwelling will be fit for habitation when completed.” i) If the dwelling is provided to the order of any person, to that person and: ii) Without prejudice to paragraph (a) above, to every person who acquires an interest (whether legal or equitable) in the dwelling… to see that the work which he takes on is done in a workman-like or, as the case may be, professional manner, with proper materials and so that, as regards that work, the dwelling will be fit for habitation when completed.”
“Foundation depths in relation to trees or hedgerows shown on the site lay out should be indicated. …To enable site supervisors to determine foundation depths in these situations the tables in Appendix 4.2H may be used. If in doubt about any of the information either assume the worst conditions or consult an engineer. (my emphasis)”
“Generally foundations for the new properties may be trench fill and these should be based at a minimum of 1.2 metres below ground level. In the area where the existing trees are to be removed, foundations must be increased in depth to be founded at a minimum of 500mm below the last evidence of roots or desiccation of the clay. Where trees are retained (willows at the front and rear) or where new planting is to be carried out, foundation depths again should be referred to the NHBC tables. The attached sheet shows the minimum depths with respect to these retained trees and the new planting. Generally heave precautions will be required throughout construction and this will be dependant upon the shrinkability of the clay subsoil. On the outer foundations, Claymaster will be required to the inner face of the trench fill and Correx slip membrane on the outer face. Similarly on the internal foundations, Correx slip membrane is required on both faces of the trench fill. A typical detail from Cordek Ltd is shown on the attached sheets… ”
“I have now completed the drawing showing the minimum foundation depth with respect to trees (4.02) and enclose a copy for your information. This shows the minimum depths as regards to the distances from the trees and also shows the positions where steps could be made in the trench bottom to achieve these depths. You may wish to rationalise the lay-out of depths to make setting out easier on site…”
“The test samples also indicate a negative liquidity index for the sample taken from the trial pit 1 which was close to the willow tree. This indicates that the clay sample was dessicated and therefore has potential to heave causing damage to the property. The clay heave precautions shown on my sheets will therefore be required and I would suggest that you allow these for both properties.”
“Further to your letter of 3 December, I have revised our layout plan to show the new planting and existing tree layout as shown on David Brown’s (landscaper) design. This is generally as shown before, although a slight increase in depth is required on the left side of Plot 1 adjacent to the boundary. The remaining depths are as shown. This can be rationalised on site to step at 2.0 metre intervals.”
“Together with the items supplied by you, these drawings have today been issued to the NHBC and copies have also been forwarded to the Council in the form of an application under the Building Regulations.”
“12. The vendor will at its own expense erect and complete a dwelling house and premises on the property in all material respects in accordance with the specification, plans and elevations seen by the purchaser and in accordance with the requirements of the Local Planning Authority…”
“The fact that cracking is slightly wider at the top than the bottom points to possible heave movement of foundations and I note from original drawings that a line of Leylandi were roughly located along the line of this wall. If all dessicated material was not removed in excavation, then some re-hydration and heave of the subsoil could occur.”
“1. Internal cracking continuing to extend in length on ground and first floors. 2. Further cracks developing in the rear wall of the rear en-suite.”
“The tendency since our last visit in September 2003 has been for cracks to open and readings show figures of between 0.2mm and 0.64mm. The degree of movement appears to have accelerated all be it in a small amount in the two months since our last visit and readings. This could coincide with a change in the weather to wetter autumn/winter conditions.”
“If heave is occurring this would be expected as rain replenishes the lower subsoil, although I would have expected it to take some time to penetrate the depth of the footings in this area. Expanding clay would lift the footings and supported wall more in the area of the removed trees as this could well result in damage to finishes noted. Secondary cracking would be caused by stresses set up by the initial movement.”
“3.6 The pattern of the movement and the cracking present was consistent with some heave movement of the foundations having occurred within the central section of the property.”
“3.09 Richard Money Associates drawing number 98/1807-4.02 specifies the minimum foundation depth requirements with respect to the trees to be retained. No increase in depth appears to have been specified on this drawing with respect of trees to be removed.” “3.10 With reference to the NHBC guidelines applicable at the time of foundation design, we consider that deeper foundations should have been specified for some of the foundations, particularly in the central area of the house.” “3.11 The evidence of cracking and movement within the property is consistent with heave movement of the clays in the area of the willow tree removed within the plan footprint of the house. Some heave movement of the clays, within the area of the conifer trees, may have contributed to the movement.”
“In order to confirm the foundations of the property, are, in fact, inadequately constructed as believed, and in order to facilitate the design of necessary foundation enhancements, a ground investigation will be required. As discussed, this will unfortunately necessitate internal excavation works at the focus of the movement to provide sensible results. The small room between the lounge and the kitchen would appear the most appropriate location for these works, which will entail excavations to determine the depth of the underside of the foundations.”
“As can be seen in the attached Engineering Appraisal Report, we have been able to confirm that the damage is the result of heave movement. The ground investigation confirmed the presence of high plasticity clay soil beneath foundations which are of insufficient depth to counter the previous removal of a willow tree located within the footprint of the property. Furthermore there was no evidence to suggest that anti-heave precautions had been taken during construction of the foundations where these were exposed. Root samples were observed within the excavation confirming the past presence of a tree coincident with the apparent centre of movement…”