“It would be a huge benefit if we could see the vessel’s technical construction file so that we can see exactly which standards have been used in the construction. So if you could bring some copies of the standards used etc. this will save us time later.”
“ … include our involvement with the coding requirements.”
“Please attend to the following special instructions. Build to MCA coding standard. Additional equipment, life raft etc. to be provided later and checked at that time. It is understood and agreed that the surveyor’s report will be a factual examination carried out within the stated limitations and with opinions given in good faith as far as seen at time of inspection. It implies no guarantee against faulty design, latent defects, general safety or suitability of the vessel for any particular purpose. The survey will not include examination in respect of performance or otherwise to the Recreational Craft Directive 94/25/EU, the EMC Directive 89/336/EEC and the Machinery Directive 98/37/EC.”
“An inflatable boat or rigid inflatable boat, of less than 8 metres in length, which it is intended to operate as an independent vessel in Area Category 4, 5 or 6 should be of a design or construction which would meet the requirements of ISO 6185 part 2 or 3. Paragraph 4.5.1.3: The structure of the rigid hull in a rigid inflatable boat may alternatively be assessed in accordance with Section 4.2.2.”
“The CE plate looks different to others that we have seen but leave this for you to ascertain that the formal/legal requirements have been met.”
“It would be a huge benefit if we could see the vessel’s technical construction file so that we can see exactly which standards have been used in the construction.”
“… The specifications of the layout and construction were mostly of your design and requirements and built as such therefore (using) the specification that were detailed on our website have no relevance here as the boat built for you was not in conjunction with the boat specification given on the internet, as the boat was completely different.”
“… so that we can see exactly which standards have been used in the construction …”
“Both authorised surveyors/examiners commented that the outward appearance of the hull was particularly good. Whilst this may have been the case it is not necessarily representative of the inboard condition of the hull. Such an assessment can only be done by examining the areas under the deck. This was not possible because in common with many other RIBs no deck accesses were fitted. It therefore follows that it is important to closely examine drawings, construction photographs and calculations when assessing the status of hulls for which there are no under-deck access facilities.”
“(1) The price paid to Pro Sports,£47,742.00 (2) Storage and insurance 5,982.88 (3) Investigation of transom by Challenger 1,461.75 (4) Delivery trip Southampton to Scilly to Falmouth 1,033.00 (5) Engine parts to Challenger 274.00 (6) Repair work and modifications by RK Marine 3,126.77 (7) Investigation by Mr Carter and Mr Cox 3,198.00 (8) Less the present value of the boat -£10,000.00 Total£52,818.40 ”