“Roof weathering sheets generally deteriorated and have reached end of useful life; Works:- 1. Replace all sheeting, weathering clips, washers, flashings, gutters and cappings with double skin profile metal roof. 2. Renew deteriorating translucent sheets. 3. Roof to be left in good and substantial repair.”
“In order to provide clear, firm advice I should be grateful if you would amend your report to eliminate reference to repair of the existing as this is not an option for the long term benefit of the building. In particular, under paragraph 6.8, you have referred to the fact that the current roof is performing satisfactorily although the weathering is reaching the end of its life span. I shall be grateful if you would review your report and consider the adaptions as noted above.”
“Blackhawk are now faced with a commercial decision as to the best action to take on the building. … with regard to the interim dilapidation schedule already produced, we currently consider the content and cost levels of the report, to be not an acceptable basis for starting discussions”
“Roof – we have been advised that there is no obligation under our Terms to supply a new roof, the cost quoted is excessive.”
“Ladders were available and I took the opportunity to inspect the roof and found it to be a corrugated asbestos roof covering with the majority of hook bolts deteriorating and a small percentage of cracked sheets”
“Unexplored territory – no court rulings as to whether an overhauled asbestos roof might be in ‘good repair.”
“The tenant’s surveyor had indicated that it is possible to purchase non-asbestos corrugated roof sheets of the same dimension and profile than the existing sheeting. If these are of a different colour, it may be possible to argue that we will not accept a non-matching repair. Once we receive specialist comment concerning the roof, I suggest that all the relevant points are put to the tenant so that he is aware that there will be several risk factors that need to be taken into consideration if he decides to carry out the repair project rather than come to a sensible agreement concerning the renewal of the roof.”
“My Client is comfortable with the proposition that repairs are undertaken to the roof using single non-insulated sheet material of suitable profile to match with the existing. Naturally, it may be found that extensive areas of roof sheet will have to be replaced but as you will appreciate, as it is a repair, there is not a requirement to upgrade the roof with insulated panels by Kingspan or others. With regard to the lining sheets, these naturally will have to be taken down, but since the area below has been completely cleared out now, including the mezzanine area, a powered hydraulic platform will be used to take down the linings, clean them with specialist system and reinstall. At the end of the day, whether the cleaning is adequate will be for the Courts to make an assessment of.”
“It is appreciated that the repair solution may not be that which you had anticipated at the outset of the production of the draft schedule produced by your Surveyor but it is considered that the Lease cannot ask for improvements, such as installing an insulated roof albeit that it would be desirable for any incoming tenants. Repairs will be undertaken, in compliance with the Lease, to a satisfactory standard and handed back to you at the end of the term.”
“…We have received categoric advice from specialist roofing consultants that the roof of these premises will have to be replaced if it is to be put in good and substantial condition and moreover certainly if the premises are to be re-let on full repairing terms which we consider to be the ultimate test.”
“Many of the old, original, hook-bolt type main fixings were noticed to be skewed over and not perpendicular to the sheet surface suggesting sheeting may have slipped/sagged/settled down the slope”
“Renewing all fixings can sometimes be done using the newer type of self-drilling/tapping “top-fix” type screws, however, here I do not think this will be entirely possible and I think we will have to use a combination of hook-bolts and top-fixings and there are certain difficulties involved in the proposal. Using the new fixings in the replacement sheets is fine, but we will probably need to use hook-bolt fixings in the old sheets.”
“The new fixing locations are then about 30mm or so down slope of the holes that already exist in the old sheet and this then creates the problem of sealing up the old holes.”
“If we could agree a cash settlement now, it would obviously reduce the claim for loss of rent and costs”
“Do not want to give the landlord/ his surveyor any chance of querying our work via our client because of the ‘bad blood’ that undoubtedly does exist between our client and landlord. Suggest we need to go over job thoroughly as it nears completion to ‘snag’ etc.”
“As you are aware, Blackhawk have spent a substantial sum of money, leaving you with a newly painted and refurbished building. If you should have any points relating to this recent work that Blackhawk can claim as “snagging” with its contractors, please let us know and we will arrange to have this carried out at no cost to yourselves.”