"It is agreed between the parties that the Court's determination of and ruling on each of the Issues contained in the Schedule to the Order dated24 February 2004 , relating to Leeds, Stafford and Chelmsford DCCs, should apply to and bind the parties in respect of every like issue which is, or has been or will by raised by DEFRA on each and every invoice submitted by Ruttle as part of its account under the contract dated20 June 2001 , relating to the Foot and Mouth Outbreak." "
"1.1.4. C & D teams will also have ensured adequate on-site supervision by DEFRA representatives to enable contractor's weekly time sheets (employees and equipment) to be signed to enable subsequent certification of invoices."
"invoices ... [will be] submitted in arrears on completion of the Contract" and that "
"... the Secretary of State's requirements [at] the location where the services are to be performed". "invoices ... [will be] submitted in arrears on completion of the Contract" and that "
"reviewed the invoices submitted by Ruttle against [particularly detailed records maintained on its CPH Files] and have produced a schedule of discrepancies"
"I supervised the entire cleansing and disinfecting procedures and took on general responsibility for the FMD operations on the farm."
"If Ruttle's timesheets looked correct I signed them on that basis. Where guys were absent on farm on a particular day I checked that they had nor been included in the timesheets. I did not want to allow someone to get paid if they did not work. I always understood that the labour timesheets partly prepared by me and the Ruttle timesheets prepared by Joe [Skett] had to be signed in order to allow Ruttle to be paid for the work that they did. I generally left it up to Ruttle to chase me for a signature on the timesheets that they prepared. As I have already indicated, this also appeared to be the understanding of Ruttle's men, including Joe [Skett] and Mick [Grundy]." "
"If Ruttle's timesheets looked correct I signed them on that basis. Where guys were absent on farm on a particular day I checked that they had nor been included in the timesheets. I did not want to allow someone to get paid if they did not work. I always understood that the labour timesheets partly prepared by me and the Ruttle timesheets prepared by Joe [Skett] had to be signed in order to allow Ruttle to be paid for the work that they did. I generally left it up to Ruttle to chase me for a signature on the timesheets that they prepared. As I have already indicated, this also appeared to be the understanding of Ruttle's men, including Joe [Skett] and Mick [Grundy]."
"From March 2001 quantity surveyors were employed by the Department to give independent assurance that it was being charged reasonably for the work carried out by contractors. Quantity surveyors were tasked with agreeing schedules of rates for plant, equipment, materials and labour. They were also responsible for the validation and approval of contractors' invoices and checking that paperwork was correct. The Department employed up to 80 quantity surveyors at Disease Control Centres." [22] "
"Two batches of invoices have been received so far. Approximately 10 invoice per batch with each batch valuing approximately£500,000 -£600,000 . Invoice dates range from the beginning of March to the first/second week of May. If the March invoices are for work carried out in February, then there is a chance that they could be for [Swine Disease] work. [Mr Harrison and Mr Love] need to sort out and separate FMD from [Swine Disease] invoices. Ruttles have been approached over the validity of some of their submitted invoices, ie rates wrong; arithmetical errors; additional personnel." "
"My recollection in relation to the month that I spent at the Gisburn Market is also patchy. However, I would say that I signed the majority, if not all, of the labour and equipment sheets for work done throughout that period by Ruttle because I was the DEFRA representative who was almost always on site." "
"The purpose of me signing the timesheets was to sign for the hours that the men were on site. I can see no reason why Ruttle would have been unable to get their timesheets signed by me even though I was riot on site at all times. The reason for this is that a process had already been put in place by Vincent Harkin before I arrived whereby timesheets were signed on a Friday." "
"Q. (judge) Who decided what items of plant should be brought on to the farm at the outset? A. Initially the vet who diagnosed foot and mouth disease who would be Roger Nelson. Q. Does one conclude from that that for good or bad reason the explanation for there being too much plant on site was because Roger Nelson asked for too much? A. It could possibly be that it was - a lot of it was used or most of it was used in the early stages, but when I became responsible for it, as the time went on, it was not needed. Q. Was there any procedure for instructing the contractor where it was regarded the contractor had too much plant that he should off hire some of the plant? A. I think it was left down to the person on site, which ultimately was me. ... Q. So that, as you saw it, the implementation of your decision that there was too much plant was in obtaining the authority of the Leeds office and then putting them off hire? A. Yes". [24] He also accepted in evidence that originally the number of men on site had been reasonable and that the surplusage occurred towards the end of the clean up operations. He had not immediately instructed a slimming down of the labour force when he first arrived on site because they were on site and, until stood down by DEFRA, had to be paid for. [25] "
"the extent to which such records were maintained differed ... Leeds and Stafford had very little."
"Contractors' Accounts. Contractors should be instructed to send their accounts to the appropriate FMD Centre .... Staff will be provided by the RD to carry out the checking of contractors' accounts. The VO in charge of an outbreak must ensure that records are kept of the number of men and number of types of machines employed, and the hours worked each day so that he can provide information against which the contractors' accounts may be checked. He may delegate this task to an SAHO/AHO." "
"expensive, labour intensive, involves the use of chemicals and may be lengthy."
"To ensure that appropriate written contracts were in place; to negotiate better terms for the Department where they could; to encourage contractors to maintain accurate records of staff, materials and plant deployed; to encourage contractors to maintain accurate records of staff, materials and plant deployed; to monitor contractor performance, giving feedback to Department staff as necessary; and to provide expert advice to the Department." [27] 5.3.4 Stage 3 of the Invoice Validation Process Investigations May 2001 "
"We have been called in by MAFF to audit all of your invoices in connection with the above outbreak. To assist us with this could you please provide us with a copy of the priced proposal that you submitted to MAFF with details of your labour rates and mark ups etc. We would also like to see copies of the correspondence from MAFF accepting your proposal." "
"MAFF realise that staffing problems at the start of the outbreak means that some contractors will not now have timesheets etc signed by MAFF personnel. MAFF are therefore now reliant on the good will and co-operation of these contractors to provide information from their own records, which will backup their invoices. This is of course reliant on the contractors' standard of record keeping." "
"I believe that a team of QSs should be convened together on a National basis to certify and clear invoices, to avoid repetition and ensure conformity between DCCs." "
"As you are aware Ruttles has been among the primary contractors engaged on foot and mouth disease work. The invoices for this work are being examined by quantity surveyors and forensic accountants retained by DEFRA to ensure that all expenditure has been properly incurred, accounted for and authorised. Following detailed investigation of the Ruttles account I am sorry to have to inform you that serious concerns have been raised by our experts and which will prevent any further payments on account until they are resolved to our satisfaction. The concerns are: • · evidence of possible overcharging for both labour and plant time; • · recording of labour hours; • · chargeable hours for plant; • · validity of invoiced items; • · costs for personnel carriers; • · invoicing inaccuracies in general; • · site accommodation charges. In addition to the above we are becoming increasingly concerned with Ruttles' inability to send invoices to the correct DCCs; the slowness of properly presented and checked invoices being submitted including the re-issuing of invoices; and queries not being responded to in a reasonable time period. The ambiguity surrounding an accurate statement of account for Ruttles is a further cause of acute concern. The f act that I have written to you should give you an indication of the seriousness with which we view the current situation. I should like to suggest that we meet at the earliest possible opportunity to resolve this impasse to our mutual satisfaction. My secretary will be in touch with your office to make the appropriate arrangements." "
"Mandate For Invoicing Panels • · Check the validity and value of invoices received by each DCC in whose area the supplier has worked. • · Working closely with QS's and Finance Managers at the DCC, establish the processes to be followed to achieve the above. Items which will require particular attention are the rates being charged for a specified item of equipment or piece of work (including the hours claimed). These may be below the rate allowed by the contract, but must not exceed that rate. All invoices must be supported by appropriate documentation, including timesheets or suppliers, invoices where necessary. • · Where discrepancies are found, these must be noted, with an explanation as to why the invoice is unacceptable (incorrect rates, incorrect quantities, lack of supporting evidence etc.). • · Should supporting documentation be found not to carry a DEFRA signature, the invoices should be recorded and batched, then sent to the Finance Manager for forwarding to the ROD for signature as appropriate. A standard letter should then be sent to the supplier, along with the invoices, stating the reasons why the invoices cannot be paid. • · The lack of a DEFRA signature is no reason why the documents should not be checked for compliance in all other respects. Before sending unsigned documents to the Finance Manager as above, they should be checked for accuracy and technical compliance; they should, if appropriate, be annotated to the effect that once they have been so checked, and that they may be approved for payment once the signature has been added. • · Using the list of problems and concerns identified, and to be identified later, engage in dialogue with the Finance Director and the Quantity Surveyor to resolve. Work closely with any appointed Director of a QS organisation and the allocated Forensic Accountant. • · Keep Monitoring Manager fully appraised and give advance warning of any difficulties within DCCs. • · Conduct meetings with the Company concerned, with a view to resolving difficulties amicably. Meetings with suppliers should be minuted, and the minutes agreed by both parties. • · Mediation - will be determined if no agreement can be reached with the Client and needs to be discussed with the Monitoring Manager. "
"I do not intend to reply in detail to the points made in your letter [under reply], but will confine myself to the fundamental misunderstanding that you and your organisation appear to be labouring under. We appointed an invoicing panel which embarked upon a process (fully understood and agreed with your company) to verify invoices that you claim arise from work Ruttle Plant Hire carried out during the foot and mouth disease outbreak and, separately, invoices you claim arise from work Ruttle Plant Hire carried out some years ago during the classical swine fever outbreak. Despite several requests for information being made to your company for verification, responses to date have been: a mixture of responses not in reply to the questions posed; no responses; and inaccurate and misleading responses. Of 475 invoices check sheets with queries attached supplied to your company, only 45 have been returned and of these many have content inadequate for the invoicing panel to continue its work. Despite this, payments have been made to your company whenever the panel were able to recommend them. Recently, the panel has raised serious concerns about the validity of some of these invoices. These concerns are being reviewed by independent experts as a matter of urgency. In the circumstances we are not in a position to make further payments. Your management and your lawyers have now made it clear in numerous recent telephone conversations that your company is withdrawing its co-operation from the work of the invoicing panel. Clearly, the situation is intolerable from DEFRA's perspective. We have asked you to make proposals, but none have been forthcoming. We have on two occasions suggested appointing an independent firm of accountants or surveyors to audit the accounts and in effect act as experts. DEFRA offered to pay half the fees for that exercise. Your company rejected this and have never given any reasons. We have as stated above asked for information on a number of occasions but it has never been provided; your company generates invoices worth millions of pounds, many months and in some cases years after the work is claimed to have taken place, send them to us and immediately demand payment. Our position is that we wish to avoid litigation but will defend it vigorously if it ensues. We wish the work of the invoicing panel to continue but are considering our position in the light of the latest information. Finally, we will consider carefully any constructive proposal that you or your company wishes to put forward. This does not embrace what you refer to in your letter as a normal business process of checking invoices.....". "
"Ruttle has not fully substantiated its claims for payment in that (i) it has failed to provide all supporting information and (ii) on a full audit and arithmetical check the sums claimed are not due. ... DEFRA will be requesting further material, including original documentation, from Ruttle to enable DEFRA to carry out a full audit and arithmetical check." 2. The additional documentation has since been identified as including all timesheets submitted by each labour supplier, pay records and plant records. These, once disclosed, would be used to identify discrepancies and to reduce Ruttle's claims accordingly. The discrepancies referred to included: (i) any claim for hours of labour supplied by any operative on any site on any day where the invoice and supporting signed or unsigned timesheet records a greater number of hours than appears from the additional material that is requested. (ii) any instance where an operative with the same name and initial appears on two or more timesheets at the same time at different sites. The apparent duplication is disallowed. (iii) any plant claim where it appears from other documents that there was no operative on site capable of operating the plant or where the plant was not in use or was surplus to requirements on the day in question. The period of non-use is disallowed. 3. DEFRA does not accept that a DEFRA signature on any timesheet has any particular evidential or contractual status, certainly in relation to any of the categories of discrepancy summarised above. Thus, if it appears that there were, say, two diggers on site when only one was in use on a particular day but the timesheet recording the chargeable use of two diggers was signed by DEFRA's on-site representative, nonetheless only one digger would now be chargeable. However, where no discrepancy is evident, DEFRA will accept the claimed hours that are supported by a DEFRA signature. 4. DEFRA accepts no obligation to pay any invoice where the supporting timesheets are unsigned. However, by way of concession, DEFRA pleaded: "
"Ruttle has not fully substantiated its claims for payment in that (i) it has failed to provide all supporting information and (ii) on a full audit and arithmetical check the sums claimed are not due. ... DEFRA will be requesting further material, including original documentation, from Ruttle to enable DEFRA to carry out a full audit and arithmetical check." 2. The additional documentation has since been identified as including all timesheets submitted by each labour supplier, pay records and plant records. These, once disclosed, would be used to identify discrepancies and to reduce Ruttle's claims accordingly. The discrepancies referred to included: (i) any claim for hours of labour supplied by any operative on any site on any day where the invoice and supporting signed or unsigned timesheet records a greater number of hours than appears from the additional material that is requested. (ii) any instance where an operative with the same name and initial appears on two or more timesheets at the same time at different sites. The apparent duplication is disallowed. (iii) any plant claim where it appears from other documents that there was no operative on site capable of operating the plant or where the plant was not in use or was surplus to requirements on the day in question. The period of non-use is disallowed. 3. DEFRA does not accept that a DEFRA signature on any timesheet has any particular evidential or contractual status, certainly in relation to any of the categories of discrepancy summarised above. Thus, if it appears that there were, say, two diggers on site when only one was in use on a particular day but the timesheet recording the chargeable use of two diggers was signed by DEFRA's on-site representative, nonetheless only one digger would now be chargeable. However, where no discrepancy is evident, DEFRA will accept the claimed hours that are supported by a DEFRA signature. 4. DEFRA accepts no obligation to pay any invoice where the supporting timesheets are unsigned. However, by way of concession, DEFRA pleaded: "
"Our understanding [from DEFRA's instructions] was that there should have been some management of the process [by Ruttle] and that it there was what appeared to be an excess volume of plant on the site, it should be considered. ... We were conscious, my Lord, that we were looking at this after the event; that we had not been to site and that what we were doing was a paper exercise. Notwithstanding that, we were asked to present our opinion on what appeared to be excessive plant."
"the services to be provided as specified in the contract or purchase order and shall, where the context so admits, include any materials, articles and goods to be supplied thereunder."
"Ruttle Plant Hire Ltd The supplier will, under the terms of this Agreement, provide the Services as detailed below: Plant equipment, materials and labour, as necessary, to deal with operations in relation to Foot & Mouth Disease as directed by the Secretary of State. Supplier will agree timescales for the delivery of equipment with the Disease Emergency Control Centre (DECC) responsible for the infected premises. Usually the supplier will be required to assemble equipment and labour on an infected premises within 24 hours of receiving the request from the DECC. ... Whilst on the Infected Premises the workmen and foreman will be under the control of the DEFRA representatives (eg DEFRA Veterinary Officer/DEFRA Animal Health Officer or Army) and they must not leave the site without fully disinfecting clothing and equipment as directed by the DEFRA Officer. Supplier must comply with relevant Health and Safety standards and Environmental standards whilst on site. Supplier will provide a foreman, or designate one of their operators, to oversee operations on site. Supplier's foreman to ensure that Daywork Sheets are maintained in respect of plant and labour (including subcontractors) and that they are signed off on a regular basis by the DEFRA Officer on site." 8.3 Issue 17 - One or Many Contracts 8.3.1 The Issue "the services to be provided as specified in the contract or purchase order and shall, where the context so admits, include any materials, articles and goods to be supplied thereunder."
"Was the FMD work carried out at each IP undertaken under one contract or under a series of separate contracts with similar terms?" 8.3.2 Answer to Issue 17 "
"Ruttle carried out all FMD work at each of the 334 locations it worked at pursuant to the terms and conditions of a single contract, being that made on20 June 2001 ." 8.4 Issue 18 - Contractual Scope of Work 8.4.1 The Issue "
"What was the scope of work carried out by Ruttle?" 8.4.2 Answer to Issue 18 "
"Provide the Services as detailed below: Plant, equipment, materials and labour, as necessary, to deal with operations in relation to Foot & Mouth Disease as directed by the Secretary of State. Supplier will agree timescales for delivery of equipment with the Disease Emergency Control Centre (DECC) responsible for the infected premises."
"comply with relevant Health and Safety standards and Environmental standards whilst on site." "
"comply with relevant Health and Safety standards and Environmental standards whilst on site."
"The scope of Ruttle's work was such part of the PD and C & D work specified in DEFRA's FMD C & D Manual and further specified by DEFRA's officials on site that was required of it and directed at each farm by the DEFRA supervising official at that farm and such construction or refurbishment work as was directed on site at sites where such work was directed." 8.5 Issue 19 - Annex B 8.5.1 The Issue "
"What is the contractual status of Annex B?" 8.5.2 Answer to Issue 19 "
"The Services shall be provided in accordance with ... 1.1 This Contract Agreement; 1.2 The General Conditions of Contract ("the conditions") annexed hereto; 1.3 the Specification annexed hereto; 1.4 the Pricing Schedule annexed hereto; all of which are held to be incorporated in and form part of the Contract."
"Department for Environment, Food and Rural Affairs, Standard Conditions of Cotnract for Services" was dated "
"Department for Environment, Food and Rural Affairs, Standard Conditions of Cotnract for Services" was dated "
"10. Payment 10.1 Unless otherwise stated in the Contract, payment will be made within 30 days of receipt and agreement of invoices, submitted in arrears on completion of the Contract or as otherwise agreed by the Secretary of State, for the Services completed to the satisfaction of the Secretary of State ..."
"Annex B is a contract document following agreements reached by the parties as to invoicing pursuant to condition 10 of the conditions." 8.6 Issue 20 - HGCRA 8.6.1 The Issue "
"Was the contract dated20 June 2001 a Construction Contract as defined by sections 104 and 105 of theHousing Grants, Construction and Regeneration Act 1996 ?" 8.6.2. Introduction to Issue 20 "
"cleaning surfaces to provide a grease-free, clean surface followed by the application of an approved disinfectant"
"minimise the risk of recrudescence of disease when the IP is re-stocked prior to the removal of restrictions from the farm."
"to bring back to the original state" and: "to reinstate, bring back to a former condition"
"(d) external or internal cleaning of buildings and structures, so far as carried out in the course of their ... restoration. (e) operations which form an integral part of, or are preparatory to, or are for rendering complete, such operations ... including site clearance, earth-moving, excavation, ....erection, maintenance or dismantling of scaffolding, site restoration, landscaping and the provision of roadways and other access works."
"Where an agreement relates to construction operations and other matters, this Part [concerned with adjudication and payment] applies to it only so far as it relates to construction operations. An agreement relates to construction operations so far as it makes provision of any kind within subsections (1) [ie for the 'carrying out of construction operations']." "
"It seems to me that section 104 (5) is intended to make clear that where a contract relates to construction operations and to other activities, that the contract is to be treated as severable between those parts which relate to construction operations and those parts which relate to other activities and that Part II [of the HGCRA] and the provision for adjudication are to apply to the contract only so far as the contract relates to construction operations."
"was the contract of20 June 2001 a construction contract involving the carrying out of construction operations?"
"Yes, the contract was a construction contract as defined in sections 105(d) and (e) of the HGCRA, being essentially a contract for the provision of FMD C & D services on farm premises. Additionally, some works were carried out in relation to the provision of temporary or permanent offices and those were, additionally, a construction operation by virtue of section 105(a) of the HGCRA." 8.7 Issue 21 - Implied Terms 8.7.1 The Issue "
"What terms relating to the preparation, submission and payment of invoices were implied into the contract?" 8.7.2. Payment "
"within 30 days of receipt and agreement of invoices"
"Mr Carty confirmed that since action was now being dealt with on a National basis, [a meeting involving particular DCCs need not take place] . . . . Mr Carty confirmed that following the meeting, Mr De Kock would be making a financial assessment of how much can be paid to Messrs Ruttle on account and would be reporting to the Finance Director after the meeting and advise Messrs Ruttle of the amount being paid by5 June 2001 ."
"To what extent were the contents of and the notes and rates contained in the CECA schedule incorporated into the contract?" 8.8.2. Answer to Issue 22 "
"Plant · All charges to be as agreed schedule. · If items not in agreed schedule then they shall be accurately referred to the FCEC/CECA daywork rate items. · Where either of the above is not possible, then invoices supporting hire rates will be acceptable." 2. In Annex C: Pricing Schedule: "
"Plant · All charges to be as agreed schedule. · If items not in agreed schedule then they shall be accurately referred to the FCEC/CECA daywork rate items. · Where either of the above is not possible, then invoices supporting hire rates will be acceptable." 2. In Annex C: Pricing Schedule: "
"The CECA plant schedule, including the description of all plant items and rates it contains and the notes relating to plant hire were incorporated into the contract and were applicable to the determination of Ruttle's entitlement to payment for plant hired to DEFRA." 8.9. Issue 23 - Control 8.9.1 The Issue "
"Did Ruttle have any responsibility to decide: (1) what numbers and grades or categories of men and which items of plant would be hired for a particular site; (2) the days and hours for which these would be charged on any particular day; and (3) whether any men or plant were surplus to requirements and should be moved off site and off hire?" 8.9.2 Answer to Issue 23 "
"[Ruttle] will ... provide ... plant, equipment, materials and labour, as necessary, to deal with operations in relation to Foot & Mouth Disease as directed by the Secretary of State." "[Ruttle] will ... provide ... plant, equipment, materials and labour, as necessary, to deal with operations in relation to Foot & Mouth Disease as directed by the Secretary of State."
"No. DEFRA was in sole control of: (1) what work was to be performed, what labour was to be used; (2) what the days and hours of working were to be; (3) what plant was to be hired and left in working order ready for immediate use on site whilst men were working on site; (4) the movement of all men and plant onto and off site; and (5) the manner in which the work was to be performed." 8.10 Issue 24 - Status of Signed Timesheets 8.10.1 The Issue "
"To what extent, if at all, was a signed timesheet conclusive as to Ruttle's entitlement to payment for the labour and plant recorded on that timesheet?" 8.10.2 Introduction "
"Is Ruttle entitled, in the light of events that have occurred, to payment for the provision of on site labour and plant hire for any such provision which is backed by timesheets that have not been signed by a DEFRA official?" 8.11.2. Answer to Issue 25 "
"MAFF realise that staffing problems at the start of the outbreak means that some contractors will not now have timesheets etc. signed by MAFF personnel. MAFF are therefore now reliant on the good will and co-operation of these contractors to provide information from their own records which will backup their invoices. This is of course reliant on the contractors' standard of record keeping. QS's should also look at Military records to establish substantiating evidence for invoices."
"Timesheets Hugh Carty then turned to the subject of timesheets. If some timesheets had no definite signature, these would be checked and signed off as technically correct, using one of the standard templates. They would then go to the Finance Managers who would decide whether to try and get a retrospective signature or to pass for payment. DEFRA would have the responsibility for obtaining signatures." "
"Q. Now, what this means is that the timesheet would be checked for accounting accuracy; yes? A. Yes, verified by the panel. Yes. Q. Then sent for signature, if appropriate? A. I cannot comment on that. Q. But that is all that that agreement means; that is right, is it not? A. It says that they would send for retrospective signature or pass for payment. Q. But it does not mean that Ruttle were being forgiven the requirement that timesheets be signed, does it, Mr O'Connor? A. No, because there was not anybody on site to get them signed. Therefore, it was recognised that that was an issue that DEFRA had caused and this was a method that they - as far as I understood it, it was a method that they would implement to rectify that. Q. Yes, if the AH0s thought it appropriate to sign? A. Well, it was just that it was sent for signature. Who signed the timesheets, it is DEFRA's internal workings that has done that. Q. But you were not being released from the obligation to produce signed timesheets, were you? A. No, the contract is quite specific on that, but if we cannot get them signed then there has to be some method of putting in place and getting them signed. We submitted the timesheets with the invoices when the invoices were issued and DEFRA then, because they knew where all their staff were who could sign those sheets, would take them to them." [33] "
"Is DEFRA entitled to disclosure from Ruttle of underlying documentation and, if so, on what terms?" 8.11.2 Answer to Issue 26 "
"DEFRA is not, at present, entitled to disclosure of any of Ruttle's internal documentation but if it hereafter conducts an audit of any of Ruttle's invoices, the relevant and material parts of that internal documentation will be disclosable on reasonable terms. In identifying what those reasonable terms are, account will need to taken of the principles set out in paragraphs [348 and 351] of the judgment." 8.12 Issue 27 - Further On Account Payments 8.12.1 The Issue "
"Are Ruttle currently entitled to further on account payments prior to any further audit work and the finalisation of its entitlement to payment?" 8.12.2 Answer to Issue 27 "
"Yes, Ruttle is entitled to substantial further on account payments following completion of first sweep validation of invoices at each DCC on a DCC by DCC basis." 9. Specific Issues 9.1 Issue 1 - Timesheets 9.1.1 Issue 1.1. "
"1.1. In what circumstances, if any, did the requirement that Ruttle submit to DEFRA signed and dated timesheets in support of any claim for payment for labour or plant not apply?" "1.1. In what circumstances, if any, did the requirement that Ruttle submit to DEFRA signed and dated timesheets in support of any claim for payment for labour or plant not apply?"
"Following the instructions given to Ruttle in February 2001 on site by Dr Todd-Hunter for the Chelmsford DCC and the agreement reached on24 September 2001 between Mr Hugh Carty and Mr O'Connor as part of the Invoicing Panel procedures, the requirement that Ruttle submit signed and dated timesheets in support of any claim for payment was waived or was no longer capable of being relied on by DEFRA." 9.1.2 Issue 1.2. "
"1.2. What information, if any, did Ruttle have to provide to DEFRA to support a claim for payment for labour or plant where the claim was not supported by a signed timesheet, but only by unsigned timesheets?" "1.2. What information, if any, did Ruttle have to provide to DEFRA to support a claim for payment for labour or plant where the claim was not supported by a signed timesheet, but only by unsigned timesheets?"
"Once the Invoicing Panel started work validating invoices, none save the invoices, timesheets and supporting documents defined in annex B. Once the first sweep of invoice validation had been completed, Ruttle was to provide such documents as DEFRA reasonably required on such terms as were reasonable in order to assist DEFRA in conducting its second sweep of invoices, its audit and its determination of the final sum due and owing to Ruttle." 9.1.3 Issue 1.3. "
"1.3. In what circumstances, if any, can DEFRA refuse to meet a claim by Ruttle for payment for labour or plant that is supported by signed and dated timesheets?" "1.3. In what circumstances, if any, can DEFRA refuse to meet a claim by Ruttle for payment for labour or plant that is supported by signed and dated timesheets?"
"Where DEFRA has reasonable grounds, supported by reasonably reliable evidence, that the contents of any timesheet, although signed and dated, are inaccurate or unreliable and where it is reasonable, in the light of those grounds and that evidence, to withhold payment in full or in part of the sum invoiced in reliance on that timesheet." 9.1.4 Issue 1.4. "
"1.4. Do any such circumstances apply in this case?" "1.4. Do any such circumstances apply in this case?"
"On the basis of the evidence and documents adduced in evidence at the trial of these issues, DEFRA has not yet identified circumstances which justify a conclusion that the contents of any signed timesheet are unreliable." 9.1.5 Issue 1.5. "
"1.5. Was an agreement reached, at the meeting on24 September 2001 , relating to unsigned timesheets? If so, to what extent, if at all, is DEFRA entitled to challenge the agreement relating to unsigned timesheets?" "1.5. Was an agreement reached, at the meeting on24 September 2001 , relating to unsigned timesheets? If so, to what extent, if at all, is DEFRA entitled to challenge the agreement relating to unsigned timesheets?"
"Yes, an agreement was reached at the meeting on24 September 2001 relating to unsigned timesheets. DEFRA is not entitled to challenge the agreement. Moreover, it has not sought to challenge the agreement, it merely denies there was one and that, if there was one, it was entered into by Mr Carty on its behalf without its authority. DEFRA is incorrect on both counts." 9.2 Issue 2 - Absence of Supporting Information 9.2.1 Issue 2.1. "
"2.1. To what supporting information was DEFRA contractually entitled in order for Ruttle to fully substantiate its claims for payment?" "2.1. To what supporting information was DEFRA contractually entitled in order for Ruttle to fully substantiate its claims for payment?"
"Prior to the trial of these issues, DEFRA was not contractually entitled to supporting information save such information as the contract required to be submitted with each invoice. However, if and when DEFRA conducts a second sweep of invoice validation and a full audit of Ruttle's invoices, it will be entitled to such supporting documentation as is relevant which it is reasonable to require subject to such terms as it is reasonable to impose on DEFRA." 9.2.2 Issue 2.2. "
"2.2. What was the time for payment of invoices submitted by Ruttle to DEFRA?" "2.2. What was the time for payment of invoices submitted by Ruttle to DEFRA?"
"Ruttle was entitled to payment of invoices pursuant to the IP procedure in two stages: (1) An on account payment. This was to follow the first stage validation of that invoice and a recommendation for payment. This validation was to take place as part of a programme for the validation of all invoices to be undertaken between September 2001 and March 2002. (2) A final payment. This was to be made as part of one final payment of all outstanding sums due to Ruttle to be recommended and paid following the second sweep and audit of all invoices and was to be paid by the end of March 2002". 9.3 Issue 3 - Additional Charges 9.3.1 The Issue "
"a foreman, or designate one of their operators, to oversee operations on site."
"In principle, where it was reasonable and reasonably necessary to employ a roving foreman in a particular area in addition to site-based working foremen, Ruttle is entitled to charge for such foremen whether or not they were directly in control of other foremen and such a charge is not to be treated as part of the allowable percentage mark up for administration charges provided for by the contract." 9.4 Issue 4 - Excessive Hours 9.4.1 Issue 4 "
"Where time has been charged, whether on signed or unsigned timesheets, that is excessive in the sense of not being worked on site, whether because the operative was on standby, on call or because of some other reason, Ruttle is entitled to charge for such additional time but at an appropriate rate reduced from the rate that would be applicable for such working hours had they been worked on site." 9.5 Issue 5 - Reduction of Labour to Match Plant 9.5.1 The Issue "
"Yes, where the alleged insufficiency was said to have arisen as a result of a theoretical pairing exercise undertaken after the event by persons who were not present on site during the course of the relevant work." 9.6 Issue 6 - Number of Foremen 9.6.1 Issue 6 "
"As many as it was reasonable to employ at that site at any one time given industry custom, the needs of the work, the need to comply with health and safety requirement, the need to address any risks identified by appropriate risk assessments and the size of the labour force on site." 9.7 Issue 7 - Mobilisation/demobilisation/transportation 9.7.1 Issue 7.1. "
"Yes, the appropriate hourly rate for transportation and necessary driver or drivers during mobilisation, demobilisation or transportation of plant required for FMD operations was chargeable by Ruttle." 9.7.3 Issue 7.2 "
"Yes". 9.7.5 Issue 7.3. "
"At the appropriate hourly rate provided for in Annex C to the contract." 9.8. Issue 8 - Travel Time 9.8.1. Issue 8 "
"No. Ruttle was not entitled to add travel time to workers' timesheets as well as adding the time on to invoices. Ruttle was only entitled to add on travelling time once." 9.9. Issue 9 - Minibus/van 9.9.1. Issue 9 "
"On the basis of the hourly charge set out in Schedule C at the contractual rate of£11.94 per hour". 9.10. Issue 10 - Mileage Allowance for Plant 9.10.1. Issue 10 "
"No." 9.11. Private Cars and their Mileage Allowance 9.11.1. Issue 11.1 "
"Yes, at the rate of£0.40 per mile." 9.1.2 Issue 12 - Excess Standing Time 9.12.1. Issue 12 "
"Plant Hours - Standing Time It was agreed that plant would be paid for at 12 hours per day or as signed for by DEFRA personnel and that plant would be paid for up to 3 days if left standing on site. If any plant is left standing longer than this period then the invoicing team are to clear requirements with the DEFRA personnel who signed for it."
"Yes, unless a claim for such standing time had been referred to a DCC who had notified a doubt, difficulty or explanation as to why the claim should be refused. If so, the claim was to be audited." 9.13. Issue 13 - Reduction of Plant to Match Labour 9.13.1. Issue 13 "
"Yes, if plant was on site having been instructed to be located on site by DEFRA, had not been instructed to be off-hired and remained on site ready for use and was included in a signed or an unsigned timesheet. Ruttle may charge for the plant unless there is good reason to show that the plant was not in fact on site or that DEFRA had not authorised it to be on site or had instructed it to be removed from site." 9.14. Issue 14 - Wrong Transposition 9.14.1. Issue 14.1. "
"If Ruttle reasonably supplied plant which is not, applying industry standards, covered by an item and its description in annex C, Ruttle may charge for that item using the rate for whatever item in the CECA schedule which, again applying industry standards represents the item supplied." 9.14.3. Issue 14.2. "
"Ruttle may charge for the higher of two rates specified in the contract if it reasonably supplied plant whose description and type equated to the plant with the higher of the two rates, otherwise it is entitled to charge the lower of the two rates." 9.15. Issue 15 - Mobilisation/Demobilisation/Transportation 9.15.1. Issue 15.1. "
"These rates apply only to plant already on site ... inclusive of repairs and maintenance."
"Yes." 9.15.5. Issue 15.3. "
"The appropriate rates set out in Annex C." 9.16. - Issue 16 - Plant Hours 9.16.1. Issue 16 "
"Plant: to be paid as per time in use. If day work sheets have been signed with hours stated then pay as per day work sheet. However, if day works sheets only ticked then pay as per labour hours for operator on site." "
"Yes. " 10. Interim Payment Application "
"The 2001 Outbreak of Foot and Mouth Disease", published on21 June 2002 ("
"The 2001 Outbreak of Foot and Mouth Disease", published on14 March 2003 ("
"Chelmsford Records"