“The primary structural members oscillated violently and I could see the piping and the instruments vibrating. This was caused by the reciprocating action of the fuel gas compressor forcing unacceptable resonance on many structural members, piping and instrument components.”
“Phillips need to consider doing that”
"Downstream of the Zechstein metering skid is an existing 8 inch spare connection and it is proposed that this be used as a source of fuel gas for the gas turbine of the compressor."
"Having discussed the fuel gas take-off it would appear that in order to be fiscally correct the take-off should be upstream of the metering skid, but downstream of the contactors."
“You fail to understand the working principles of a reciprocating compressor”
“For normal control you ignore the fuel gas regulator on the turbine skid will act as the final control element.”
“The Basis of Design data failed to indicate that there was any hydrocarbon condensate produced from the wells. During the design stage Snamprogetti carried out a flash simulation of the gas provided in the contract documents. A flash simulation is a calculation that ascertains the quantity of liquid drop out based on composition of the gas. The calculation indicated no liquid present at the operating conditions as provided by Phillips in the Basis of Design.”
“Two new pressure gauges were also required for the anti-surge controller to operate. Surge control requires mass flow rate and pressure differences to be measured. Snamprogetti provided only for pressure differences to be measured. The new gauges were installed one on the suction one on the discharge side of the compressor.”
“It seems obvious that fire watch would apply to all of the work on the platform and not just to the HAZOP work.”