“Further to our recent conversation in respect to water ingress within our unit, I have been advised today that further ingress occurred over the weekend, and I am extremely concerned that our finishes will be damaged. I have spoken to BSC this morning who advised that all weathering works to structural openings and steels supports installed by ourselves have been completed, and must assume ingress is via defects elsewhere in the roof surface. Could you please take urgent action to remedy this situation before any significant damage is caused. HBM replied on21st September 1992 , refuting the allegation that it was responsible and inviting Woolworths to take up with BSC the matter of the completion of the weathering works (C/93). There the correspondence on that topic seems to end. BSC advised that all openings had been sealed and no further ingress should occur,”
“…As would normally be the case, I attended site after the initial visit with Iain Fisher to check that the site was indeed ready and to then arrange for a Foreman to be available on site for deliveries of materials to be made. I can confirm when I attended site the screed was of a normal colour and did not look damp/wet. If running water was beneath the screed, it would look wet and be greenish in colour. Prior to attending site to carry out the works, various readings were taken to confirm that the floor area was sufficiently dry. The particular piece of equipment used was a Protimeter Concrete Master II gel bridge test. This is a quick and easy test which was commonly used at that time by flooring contractors, adhesive and screed manufacturers, as a first check of the dryness of sub-floors. The practice would be that if the readings of the Protimeter gave cause for concern, we would then propose carrying out a hygrometer test… The Concrete Master II function was for the gel bridge test. At the time this was the quickest test technique for determining the moisture level in sand/cement screeds of known ratios. It can be used to obtain relative values in screeds containing admixes and concretes to identify areas which may warrant a detailed investigation using hygrometry techniques. These tests showed no cause for concern. I was therefore satisfied that the screed was sufficiently dry to carry out our works. Hygrometer tests are still in the British Standard requirement for assessing the kH content of screeds, however, these instruments, although easy to install, need to be sealed to the screed for in excess of 48 hours. They are extremely sensitive, if kicked or knocked in any way they can lose calibration and give false readings. The site in question was a typical site of its kind where various trades are competing against time for work space. In my experience, even where hygrometers have been set and clearly barricaded with signage, they are still moved and tampered with even if by error. This makes them impracticable and were not, and are still not the first test used to test the level of moisture in the floors. We like most adhesive, screed and flooring contractors would use protimeters or similar manufacturers with the sleeve method. We commenced flooring works to staff areas on Monday 7th September and on that day Steve Watson, our Surveyor at the time, went to site. We had been advised that rainwater had entered through a hole in the roof in Unit C which had been temporarily opened to install plant. Steve therefore undertook further protimeter tests around this area where the water ingress had occurred and again no suspect readings were recorded…”
“I was Foreman at Solum at the time that these works were carried out and was involved in the works. I cannot recall exactly when we commenced the flooring works, but it was probably in or around 7th September. The first thing that we did was to latex the floor, I can recall that there were no problems with this. If there had been too much moisture in the screed, then the latex would not have laid normally. The latex as a product has an extra high rubber content which acts as a suppressant and also absorbs the moisture. When it was put down, it did dry very quickly, literally almost within half an hour and immediately the area was being trafficked with no adverse effects. I also can confirm that when the Amtico flooring was put down, the adhesive used which is an acrylic based adhesive trowelled normally and dried normally, within 15 to 20 minutes. The adhesive was laid without adhesive bleeding through the joints and the flooring was then rolled, again during and on completion there was no bleed through.”