‘[0059] References to the amount of data multiplexed according to grants, and the amount of data that can be multiplexed according to a selected E-TFC takes into account MAC header information and other control signalling overhead required in the formatting of a MAC-e PDU.’
‘Next Smaller’, ‘Next Larger’ and ‘Multiplex then Select’
‘..in the former, the round up approach, the grant is a limit on the amount of MAC-d flow data and associated header which may be sent, and in the latter, round down approach, the grant is a limit on the total amount of resources that may be used (i.e. including MAC-d flow data, header and padding).’
“E-AGCH” and “E-RGCH(s)” are the channels on which the scheduling grants are sent. After E-TFC selection and then multiplexing, the data is sent downwards (solid line) to HARQ processing and then down to lower layers for transmission. (HARQ is a system for retransmission of erroneously received data packets.)”
‘(i) The description of the Multiplexing and E-TFC selection entities in Section 7.2.5 and as illustrated in Figure 7.2.5-1 [adding Point B to Point A]; (ii) The description of the Scheduling Grants in Section 9.1 [Point C]; and (iii) The description of the non-scheduled grant in Section 10.[Points D & E]’
“….the original concept for Node B controlled scheduling in HSUPA was to use the spare uplink resources in the cell, i.e. the available headroom taking into account the resources allocated for transmission of the legacy channels. Fundamentally, the resource being allocated is the contribution to interference at the Node B. There would need to be tight control over this because uplink power control is critical in a CDMA system and Node B controlled scheduling would have to operate within the cell’s margin of safety. The way such tight control would work is that the Node B would grant UEs a share of that resource, in the form of a maximum amount of the uplink resource which they could use. That grant would bound/limit the E-TFC which the UE could use. The effect would be to limit the maximum uplink resources which the UE could use, because it would provide a limit on the size of the MAC-e PDU, and therefore on the size of the Transport Block, and therefore on the amount of physical resources that could be used. All of this was CGK and would be in the skilled person’s mind when reading Filiatrault.”
‘The Node B controls the resources allocated to a UE versus other UEs by means of scheduling as specified in clause 9. The UE controls the QoS of all its logical channels mapped on E-DCH by means of E-TFC selection as specified in subclause 10.2 and by HARQ operation, as specified in clause 8.’
‘In addition to these mechanisms, guaranteed bit rate services for MAC-d flows/ logical channels (FFS) are also supported through non-scheduled transmission. A flow using non-scheduled transmission is defined by the SRNC and provided in the UE and in the Node B. The UE can transmit data belonging to such flow without first receiving any scheduling grant.’
‘…fundamentally the difference between them is you would have a single grant versus now you have multiple grants for different things.’
“according to [the grants]”’ ‘85. This leaves the wording which Lenovo originally pointed to in its pleadings. In relation to E-TFC selection, s11.2 says: “Among the supported E-TFCs, the UE selects the smallest E-TFC that maximises the transmission of data according to the non-scheduled grant(s) and the serving grant.”
‘All this shows is that a phone that does not have the patented means and therefore never applies the patented limit on multiplexing, depending on circumstances in which it is operating (particularly the E-TFC sizes, the multiplexing block size and where the grants fall) may by use of completely different means, applying different multiplexing limits, end up selecting an E-TFC for use that might have been arrived at by a phone using the patented means.’
‘I think one must be realistic about these things when construed in a patent specification and must avoid, if one can, falling into the trap of being astute after the event by ex post facto synthesis to build up an anticipation out of a prior document or prior user in order to make it fit the claim.’