“So in one sense, it is true that SpiceJet does have a general commercial strategy of trying to get itself into a position to honour its proper obligations. Delay is a significant, but not the only, aspect of that. It is not a dishonourable delay, but rather the reverse. Sometimes creditors, who wish their due, must appreciate this and it is no use saying there is a ‘hell and high water’ obligation if there is no financial ability to satisfy it.”
“Under an operating lease…. the lessee takes possession of the aircraft and becomes responsible for its maintenance and insurance. After delivery the aircraft, engines and every part are at the sole risk of the lessee, who therefore bears the risk of loss, theft, damage, destruction and unexpected mechanical problems.”
“On the Redelivery date… each Engine installed on the Aircraft shall have no less than 3,500 Flight Hours and 3,500 Cycles on-condition life remaining to the next anticipated Engine Performance Restoration shop visit (based on the Lessee’s mean time between removals for engines of the same model and thrust rating in a similar operating environment) and shall have no defect, which provides less than 5,000 Flight Hours and 3,500 Cycles of remaining life pursuant to Manufacturer's or airworthiness requirements until removal.” b. Paragraph 3(c): “On the Redelivery date… each Engine installed on the Aircraft shall have just completed at the location for the Lessor’s acceptance on or about the Delivery Date an all module, hot and cold section video borescope inspection, which inspection shall be performed at the Lessee’s expense. Lessor will also have just completed in respect of each Engine an inspection of each magnetic chip detector, laboratory oil sample analysis, main oil screen and oil and fuel filter inspections. Any defects discovered in such inspections which exceed the Engine manufacturer’s in-service limits shall be corrected at Lessee’s expense. No Engine shall be “on watch” for any reason requiring any special or out of sequence inspection. Each such Engine will comply with and have been maintained in accordance with the Lessee’s Maintenance Program without waiver or exceptions. All items beyond the Engine manufacturer’s in-service limits shall be repaired.”
“The APU shall have just completed a borescope inspection and shall meet all air outputs and temperature limitations under load in accordance with the Manufacturer’s Maintenance Manual, and any defects discovered in such inspection, which exceed the APU manufacturer’s in-service limits, shall be corrected at Lessee’s expense; and the APU will be serviceable and have not more than 3,000 APU Operating Hours since previous off-wing shop visit (hot section inspection or overhaul) and not less than 3,500 APU Operating Hours and 3,500 APU Cycles (whichever is applicable) to the first Life Limited Part restriction. APU Life Limited Parts will be supported by certification documentation necessary to demonstrate traceability back to birth.”
“On the Redelivery Date… the Aircraft will… have installed the full complement of systems, equipment, parts, accessories, furnishings and loose equipment as normally installed in the Aircraft for continued regular airline service operating within limits specified in the Manufacturer’s Maintenance Manual and functioning in accordance with their intended use and in compliance with operations under FAR 121 equipment standards.”
“On the Redelivery Date… the Aircraft will… have immediately prior to Delivery completed a block ‘C’ Check so that all structural, systems, zonal and CPCP Airframe inspections falling due within the next following 3,500 Flight Hours and 3,500 Cycles and 18 months of operation in accordance with the Lessee’s Maintenance Program and the Manufacturer's Maintenance Planning Document, have been accomplished.”
“On the Redelivery date, the Aircraft interior including cockpit, main cabin and cargo compartments shall have been maintained in accordance with Lessee’s Maintenance Program without deviation or waiver and shall have been fully refurbished in accordance with Lessee’s major interior refurbishment or overhaul standards specification (or in the absence of such documentation and policy, in conformance with major airline standards) at an interval of no less than each Airframe structural check.”
“On the Redelivery Date… the Aircraft will… be rubbed down and scuff sanded, or stripped if more than two previous subsequent rub down and scuff sanding have been accomplished, and painted in such external livery as advised by the Lessor. Such painting will be accomplished in such a manner as to result in uniformly smooth and cosmetically acceptable aerodynamic surfaces on the fuselage, doors, wings, nacelles and empennage have all signs and decals clean, secure and legible.”