" As part of this we have been asked to contact all of our UK Dauphin operators and request copies of the MGB Log Cards. I have created this TE for you in order to enable you to upload the log cards and transmit them more easily. Can I please ask you to provide us with this information and I will keep you informed of further developments "
" Regarding the downtime and costs involved, unfortunately I don't have that information yet. For the moment and as a first step in order to have the answers regarding these questions, please send your order as soon as possible with the remaining potential (date and flying hours) on the aircraft. This will start the process with Airbus for the replacement of the gears. "
"Airbus helicopters has introduced a specific commercial policy. All direct consequences of the limitations introduced by this [ASB] are at Airbus helicopters' expense: You can obtain the detailed conditions by contacting your usual commercial contact at Airbus helicopters. "
" Unfortunately we still have no feedback from the factory yet. All the information you have provided regarding [the Helicopter] have been sent to the factory and we are now waiting for the worldwide work plan. Be sure that as soon as we have any information in order to go forward with this ASB we shall pass it on to you. "
" AHUK are asking is the target date for you to run out of hours on your epicyclic still the same? Also they are proposing that you get the [overhaul] carried out at the same time and they will make some sort of 'commercial consideration'. Is this something you have considered? "
" If [Airbus] are able to expand on any commercial gesture terms applied overall [MGB] costs and associated lead times for overhaul we would certainly be interested in hearing their proposal. However, currently, as per [paragraph 2A of the ASB] we would expect the planetary gear set to be replaced by [Airbus] … at Airbus expense "
" I do appreciate its pissing into the wind a little bit, but let's dot the i's and cross the t's – it'll make the lawsuit against AH a little more watertight "
" The last update from [Steve Borrowdale of Multiflight] was pretty negative, with [Airbus] not committing to any timeframes for bearing supply or rectification of the 3 remaining AS365's affected in the UK – of which [the Helicopter] is one. Instead, verbally stating that supply/rectification has been pushed back from the anticipated Feb/March to June. [Airbus] are driving the rectification process and allocating bearing sets to specific aircraft/serial numbers. AHUK have no control input and just re-iterate what they are told by [Airbus] – which is very little. "
" Thank you for making contact today. As a follow up to our phone call I can confirm that the situation for [the Helicopter] is being followed closely. Under the current planning by the crisis team in France there is a set of SNR bearings available from the bearings suppliers at the end of June. These bearings are then installed into a planet gear carrier with 5 planet gears and run on a test bed, this takes about 3 weeks. Once this is done the epicycle carrier is available to be installed into the gearbox by an onsite Airbus Helicopter tech rep. Under the current planning it is likely that some will come and install the unit into [the Helicopter] towards the end of July. This job takes approximately 3 days. Basically Multiflight have to remove the main rotor mast assembly, then the tech rep comes and removes the Epicyclic module, replaces the epicycle carrier, refits it to the Epicyclic module to the gearbox and Multiflight refit the mast assembly, followed by ground runs and air testing. When the ASB was first issue[d] there was approximately 810 aircraft in service, 365/155, and over 185 were immediately effected with 50 hr flight restrictions. As time [has] moved on customers with [MGBs] that required overhaul are also now being effected. Our Airbus Helicopter Crisis team have been working alongside the bearing manufacturer to ensure that everything that can be done is being done to ramp up the number of bearing sets available each month to support the worldwide fleet. It is hoped that the manufacture will be able to increase the production and that this will reduce the timescales for customers to get the epicycle modules they need. Every month I review the current planning to ensure we are doing all we can to keep the UK schedule on track and to try and find improvements. At one point the bearings for LNT were planned for end of July and so we have made a 1 month improvement already. I'll continue to try to improve this. Going forward I will keep both you and Multiflight informed on development concerning [the Helicopter]. We do understand that any down time for our customers is too much and are doing all we can to minimise this. "
" I am awaiting further information regarding the epicyclic (whether a separate order is required as was the situation last time) and will keep you posted if there are any further requirements. "
" If everything works well I'd say we could be able to deliver a retrofitted part by mid-August "
" This modification is very old, so we do not have any more the [planet gears] for this configuration "
" Noise of MGB reduced by modifying the sun gear, planet gear and ring gear teeth. "
" please let us know if you would like to proceed with the potential hire solution or alternatively if you would like us to provide a price for the full overhaul life MGB which is currently available and also if you wish us to continue our research for a lower life remaining unit. Alternatively, please let me know if you prefer to leave matters entirely in the hands of your lawyers. "
" the gearbox we had made available is not "spare"
" You can obtain the detailed conditions by contacting your usual commercial contact at Airbus helicopters "
" The practical procedures for the helicopters concerned by the retrofit will be provided to each customer. Specific commercial conditions will be proposed to process this retrofit "
" we are investigating the solution for this ASB and will update you once we have more information "
" Under normal circumstances for the routine replacement of aircraft parts, a customer (which may be an operator or a maintenance organisation) would be required to place a Purchase Order ("
" … AHUK did not state that the bearings would be compatible with the current modification state of the Aircraft MGB, as the full modification state was not known by [Airbus] until July 2018. Considering the fact that [Airbus] is not aware of the modification state of every helicopter manufactured by [Airbus] flying around the world or the status of the wear and tear of each component on the helicopter, it is unrealistic to expect that a blanket commitment could be made to bring every gearbox to the correct modification / state of repair to accept the replacement epicyclic assemblies currently in production free of charge. "
" Should the requirements affect specification and/or performance of the Product and/or Services, related costs and/or delivery time, the Seller and the Customer shall agree the contractual consequences ."
" Notwithstanding any provision to the contrary in the Contract or elsewhere, the total and cumulated liability of the Seller under the Contract, due to any and all causes whatsoever, whether based on breach of contract or in tort or otherwise, shall in no event exceed in aggregate an amount equivalent to ten per cent (10%) of the total net Contract price. … In no event shall the Parties be liable for any indirect, consequential, incidental, special or punitive damages of any kind, including, but not limited to, damages for any loss of use or profit, loss of assets, loss resulting from business disruption, loss of goodwill or loss of contractual opportunity by the other Party. "