“I’m already received the draft condition of tow and it is too much. In this condition the speed will be 3- 3,5 knots only and in the good weather condition only. The trim is only 1M. Two meters is more best for towing. If possible it is necessary to pump out 15 – 20 thousand metric tonnes of ballast. Crew and me will do all our best to successfully complete of towing”
“[Box] 12. Particulars of Cargo and/or ballast and/or other property on board the tow Nil cargo, Gas free condition; in light ballast condition. Draught Fwd – TBA, Draft Aft TBA” [Box] 20. Estimated daily average bunker consumption in good weather and smooth water: Estimated voyage duration from Malta to Labuan is abt 90 DAYS WP (a) at full towing power with tow 18 tons /day; economic speed – 12.5 tons / day (b) at full sea speed without tow 11TONS / DAY [Box] 22. Nature of Services Towage only, always within safe capabilities of tug but always at discretion of tug master in using 2 or more main engines [Box] 29. Delay payments (a) Port rate US$14,500 - PDPR (b) Sea rate - US$21,000 PDPR [Box] 30. Riding crew to be provided by N /A” [Box] 30. Riding crew to be provided by N /A”
“… 0.92 M is quite less for a ocean towage. We would like to have around 2.00 – 2.25 M trim. Maybe, they can pump out one of the forward tanks to reduce the displacement too. Ballast should be sufficient for stability and all excess ballast must be pumped out to avoid wasting fuel towing water ballast! Pls see how best we can reduce ballast by abt 20,000 Tons and increase Trim.”
“- Regarding Trim / deballasting requirements – we accept Mr. Malek Zaghounai’s email below, wherein it is possible to reduce ballast by abt 15,000 Tons and increase trim to abt 2.0 Mtrs. Appreciate same. As regards passing COGH – this is a long way off – abt 6,000 miles from Sousse; more than 50 days away! There is no need to start preparing now for rounding Cape 50 days away. You have crew on the Tow. Our Tug Master will see the performance of the Tow during passage and will advise if something needs to be done with the ballast during voyage. Further, weather conditions in November are much better round South African coast and we will watch the weather closely as we reach there.”
“… I can understand Regulus wanting a trim on the vessel as it will make it easier to tow as the stern of Ikdam will act like a giant rudder thus stabilising the tow. I also agree with Ian that having a vessel low in the water should minimise the motions, even if the analysis doesn’t show much change. In addition, I am not sure Regulus understand that our bulbous bow is rather flat at the front and therefore it would be better for it to be under the surface rather than slamming into waves. I would suggest that we run some other loading patterns to try and fine something that: 1. Gives us 1 to 2 metres trim by the stern; 2. Submerges our bulbous bow if possible; 3. Gets us below ballast draught at Midships in order to minimise motions. At the end of the day, we need to minimise fatigue usage during the voyage in order to maximum useful working life at the new location and the cost of tug fuel in comparison to life extension of the hull is very little.”
“About the IKDAM draught, they have finalise the vessel draught as attached, when I ask for further reduce vessel draft. Mr Nebil refuse to do it due to the vessel stability issue, which they didn’t justify it. On the hand, Mr Andrew reply is to reduce the pouding effect on the FLAT bolbous bow which may create fatigue stress and failure. Therefore, they need to submerged the FLAT bolbous bow in the water (min Fwd draft 10m) They have increased the vessel trim to 1.868m. NO BODY interested further discuss about this.”
“2. BALLAST CONDITION: we have to reduce ballast further. I had had discussions with Capt Malek who had served as Master on ‘IKDAM’. His contention was that by reducing ballast, the ‘bulbous’ bow gets exposed and this may affect towing speed. HARMONY 1 Master does not feel so. In fact, in the present condition, we will be towing unnecessary dead ballast. Since IKDAM has crew on board, during voyage, if they meet condition when additional ballast is required for better speed or safety, it could be put in. the current ballast conditions are very heavy and will affect towing speed. Further, present Master on board HARMONY 1 had towed a similar FPSO, ‘MODEC VENTURE’ recently, with cut bulbous bow & flare tower, speed was not affected by exposed bulb.”
“Why does the tug wish the FPSO to be at a lower draught when fundamentally this will increase the wind loadings on the tow and make it more difficult to control the vessel passing along the Mediterranean and through the crowded waters at Gibraltar particularly if the scirroco or winds start up. With regard to the specific loading condition it is difficult to comment as there is no graphic showing which tanks are full and which are empty, however, the [s]hear force diagram looks reasonable. With regard to the motions analysis, this was done for an even keel draught of 9m, hence it could be argued that the condition still applies but it would be safer to have the FP draught at over 9m to make sure it applicability cannot be questioned. Given the situation with getting the necessary approvals I do not think a late change in the loading condition is the best idea and should be subject to review, hence my opening question.”
“Kindly note that our Towage offer of the IKDAM in ‘light, ballast condition’. Over 81,000 Tons of ballast is not light, ballast condition. Further, the TRIM of the Tow is not sufficient for efficient towage. This will affect the towage speed and Tug’s fuel consumption. We had quoted basis general average speed of 4.5 knots for the voyage, in normal weather condition and in light ballast condition. Since, Lundin, Tunisia have advised that they cannot reduce ballast any further, we may have a claim for loss of speed due to Tow’s heavy ballast condition. We would request you to re-consider the case, arrange to pump out at least abt 20-30,000 Tons of ballast and achieve a TRIM of about 2 meters plus. In the event of bad weather and if so desire by IKDAM Master, we could have additional ballast pumped in during voyage. It makes no sense towing 81,000 Tons of water. We have towed similar FPSOs in the past with abt 25-40,000 Tons of ballast which is quite sufficient for stability. Understood from my discussions in Tunisia, IKDAM Masters had re-worked the calculations and found it possible to reduce ballast during voyage”
“Lets get the tow going firstly. I want no more iterations with Noble Denton to delay the tow commencement further. It may be the case that adjustments to ballast and trim are needed once the behaviour of the Ikdam is understood. No problem for you to keep your records as you see fit.”
“The towage has to stop when seastates in excess of 5.00 m significant wave height and 1-minute wind speed in excess of 20 m/sec FPSO has to be maintained in sheltered area prior espouser to seastates in excess of 6.80 m wave height and 1-minute wind speed in excess of 25m/sec Maximum allowed towage speed is 4.50 Knots A riding crew of 14 men shall be on board the tow throughout the towage This office, having received no instructions to consider fatigue aspects of the towage, makes no comment and gives no approval of the ability of the cargo and sea-fastenings to withstand fatigue damage.”
“Please note that average speed for the towage convoy for last 24 hours Was about 2.8 knots (Wind force 28 Knots and Rough Sea state). On departure the speed was 4.0 knots with no wind and calm sea state. According to my observations, I believe that it becomes necessary to Lighten IKDAM by pumping out ballast and this for many reasons: 1. The convoy will be subject to excessively delays (e.g. 1 knot Less in convoy speed will result in 33 days of delay to arrive to Malaysia). These delays which can go to more than one month if we take into consideration expected currents and occasionally Bad weather. 2. Expected delays will result in huge increase of bunkers to be used By Tug and IKDAM, as well for all others charges. 3. Reducing displacement of 20.000t (IKDAM Proposal) doesn’t affect The stability of the ship and make the life easier for the tug with More speed and less consumption, remain to confirm motions analysis. 4. Even there is no limitations for arrival time at Malaysia, we have to get there within a reasonable duration (I believe delays beyond 1 month would be unacceptable, if that will be only because of unnecessary ballast water onboard IKDAM, obviously this to be confirmed by recalculation of Motions Analysis. 5. Other costs induced by delays and inherent to charter-party and Warranty Association Coverage period etc … So here I have a proposal to pump out 20.000t of ballast water as per attached Stability condition.”
“The Certificate of Approval is only valid up to a tow speed of 4.5 knots, so whilst I appreciate that a reduction in ballast may enable us to hit top speed, I am also not surprised that the speed has dropped with 28 knots of wind and a rough sea state. 28 knots of wind of around 14 m/s of wind will be using up around a 1/3rd of the available bollard pull just to hold station, hence the speed drops by around a third hence 2.8 knots. That is pretty much exactly what you would expect to happen and is happening. We can take the ballast out and yes it will lighten the vessel, however, it will also potentially increase the drag on the vessel as more of the hull is exposed, which means it could well have a negative effect and we will go through the loop again when they find this, particularly given it will cause the flat part of the “bulbous” bow to emerge causing it to slam into every wave. As I have stated before, and will state again for the record, the more the hull is worked during the voyage the less its remaining fatigue life and potentially the greater CAPEX required to get it fit to go on station in Malaysia.”
“Although we appreciate that the trim of the revised sailing condition is a little different to the analysed condition (although it still only amounts to 0.769 degrees), given that the overall displacement is still some 7.5% greater than the analysed condition and the revised KG (corrected) is some 3% lower than the analysed KG then the condition is still within the analysed envelope and the motions analysis is still valid, particularly given the environmental limitation stated within the Certificate of Approval.”
“We are seriously concerned that our ‘Slow Speed Claim’ has not been settled thus far. It is very important for Owners that Charterers understand our predicament since this towage is getting longer resulting in higher fuel costs for Owners everyday. Every extra day that the convoy spends at sea is costing us by way of bunker costs & operational costs. And the only reason for this delay is the excess weight of the Tow. IKDAM has abt 30,000 tons of extra ballast on board. In addition to towing the IKDAN, our Tug is also towing abt 30,000 of extra ballast. This is not IKDAM in “light ballast condition””
“We are professionals and you will appreciate that fact that we have done a very professional job by towing the IKDAM safely round Cape and delivering the Tow. We would like to be remembered for the professionalism and commitment to do the job given to us safely and efficiently. Our intention was never to squeeze money out of Charterers. We have suffered losses because IKDAM was heavier than we had anticipated. And our anticipation was from the numerous similar towages that we had done in the past. We still maintain that the IKDAM displacement should have been closer to 70,000 rather than the present 90,000t We still have about 7 days to arrival of Tug & Tow in Labuan. We would request you to once again seriously re-consider our claim and offer us a settlement in order to reduce our losses.”
“… as per Cl.16 (c) of BIMCO Towcon Contract, we hereby give you Notice of Cancellation of Contract & withdrawal of Tug. Further, as per Clause 16 (d) we will give you 48 Hrs Notice, which commenced March 21/2000 LT [8pm local time]. As you know, IKDAM is safely anchored and your Master is in full control of the Tow”
“118. … At its simplest it comes to this: ballast is any material placed on board the vessel to add weight and the reference to “light” refers to the least amount of ballast with which the vessel can safely and properly proceed on her voyage.”
“119. The question, therefore, whether there was a breach of the undertaking in the towcon that the "Kent Reliant" was in light ballast condition depends upon whether she was carrying more ballast than was necessary to ensure her stability for the voyage. …”
“For barges and large towed objects, such as FPSOs, the draught and trim should be selected to minimise slamming under the forefoot, to give good directional control, and to allow for the forward trim caused by the towline pull. ………… FPSOs are intended to remain at sea without dry-docking for their entire working life, usually in the order of 20 years. In this respect the integrity of the hull must be maintained and precautions taken to ensure no damage occurs during the tow. A commercial vessel is usually assumed, for design purposes, to spend about 20% of its life in port, and is periodically dry-docked. These differences place much greater emphasis on the reliability, integrity and quality of the hull including its coating. These qualities must not be compromised during the tow other than by reasonable wear and tear”
“... whether, looking at all the circumstances objectively, that is from the perspective of a reasonable person in the position of the innocent party, the contract breaker has clearly showed an intention to abandon and altogether refuse to perform the contract.”