“1. Indications in documents before the court that those acting for [Noble Denton], including Mr Murray and Captain Gregory, might have contemplated that people working for the Mumbai authorities should be bribed. 2. The credibility and reliability of the answers of Mr Murray and Captain Gregory about the documents. 3. The fact that the witnesses [Mr Murray and Captain Gregory] in their statements, although referring to the possibility of repairs at Mumbai, did not allude to any possible payments of this kind. 4. The fact that the relevant documents were disclosed late, only in the course of the hearing (and the possible suggestion that they were withheld deliberately).”
“(1) In certain circumstances a court may be entitled to draw adverse inferences from the absence or silence of a witness who might be expected to have material evidence to give on an issue in an action. (2) If a court is willing to draw such inferences they may go to strengthen the evidence adduced on that issue by the other party or to weaken the evidence, if any, adduced by the party who might reasonably have been expected to call the witness. (3) There must, however, have been some evidence, however weak, adduced by the former on the matter in question before the court is entitled to draw the desired inference: in other words, there must be a case to answer on that issue. (4) If the reason for the witness’s absence or silence satisfies the court then no such adverse inference may be drawn. If, on the other hand, there is some credible explanation given, even if it is not wholly satisfactory, the potentially detrimental effect of his/her absence or silence may be reduced or nullified.”
“The Main Engine unit No.3 was leaking out exhaust gasses from the cylinder head area. The Fresh water Generator pump was damaged and out of order. Auxiliary Engine No. 3 had a crank case explosion and was out of order after it was run on Heavy fuel oil after the Diesel oil was exhausted. Two cylinder heads from this engine were removed and used on other engines as spares. The Boiler was also run on heavy oil and the burner system and assembly was reported to be malfunctioning. Motors of Fresh water Generator, No. 1 L.O pump. No. 2 JCW pump and 1 Reefer cooling water pump were reported to be out of order. The pipeline of the reefer cooling system had burst. There were no pilferages reported from the Engine room.”
“It was reported that the pirates used the Main Engine to transport their boats and equipment to various locations. As the diesel oil got over the Generators and the Auxiliary Boiler were run on fuel oil. When the fresh water reserves were exhausted the fresh water cooling systems of the Main engine, Boiler water and Auxiliary engines were reportedly topped up with sea water. The vessel feared hidden damages to the [engine room] machinery because of the use of Heavy fuel oil for the Generators and the Boiler which were originally run on diesel oil. Damages due to contamination of fresh water cooling system by sea water were also feared”
“More specific, there is exhaust gas leaking between cylinder head and liner. Also note that vessel safety [sic] from the berth to anchorage with cylinder no 3 out of use”
“Pull out [main engine] cylinder head cyl no 3. Replaced with recondition spare lower and new spare upper cover”
“The temperature was normal and that pistons were normal”
“Pull out [freshwater] cooling pump of [generator] no 1 and dismantled. Welded crack [freshwater] cooling pump cover if [generator] no 1. Fitted back and overhauled [freshwater] cooling pump cover of [generator] no 1”
“transfer anchor position due to dragging”
“At 09.45 hrs [local time]30 October 2009 , the duty officer called me that the vessel is dragging her starboard anchor”
“One of the sets of soundings was taken at low water and I think the other was carried out at high water. With respect to the accuracy of these soundings, it was very difficult to take accurate soundings because of the current”
“As a result, the cross-sectional area decreases nearly exponentially with distance from the open end. The resulting confinement of the tide must lead to amplification.”
“Tidal stream: The flood tidal stream in Tankari Road continues for 1 hour after the time of [high water]; the streams in the roadstead attain a rate of 5 [knots] at springs”
“During inspection of main engine, lube oil filter, found with various pieces of metal, all of them carefully collected/removed and filter cleaned. We will inspect again tomorrow after manoeuvring from anchorage to berth”
“When the vessel pull out and going to outside anchorage area, main engine running at full ahead. Every one hour in a half [sic], changed lub oil filter due to pressure decrease. Found various pieces of metal. All of them collected/removed and filter cleaned for ready spare. Main engine thrust bearing shaft connected to fly wheel, overheat and create smoke. But the thrust bearing temperature is normal. Reduce speed at 65 RPM. The smoke reduce and slowly disappear until the vessel arrived at anchorage area.”
“1. Starboard tank top and hopper heavily buckling almost waving, measuring the Length about 10.28 meters and width about 2.50 meters from tank top flooring. 2. Tank Top flooring heavily buckling almost waving. 3. Corrugated bulkhead after part crack Length about 54 cm and width about 3 cm and measuring from portside shell plate about 4.13 meters and from tank top flooring about 4.45 meters. 4. Corrugated bulkhead forward part between cargo hold no. 4 and 5 all middle parts heavily dented. 5. Vertical ladder at forward bulkhead welded part detached.”
“Fuel oil tank no. 5 portside (double bottom) found with sea water sounding 2.90 meters previous sounding was 0.02 meters. Fuel oil tank no. 5 stbd side (double bottom) found with sea water sounding 1.90 meters previous sounding was empty. Fuel oil tank no. 6 portside (double bottom) found fuel oil mixed with sea water sounding 0.53 meters previous sounding was 0.18 meters. Fuel oil tank no. 6 stbd side (double bottom) found fuel oil mixed with sea water sounding 0.67 meters previous sounding was 0.33 meters.”
“The auxiliary machinery was working during [the time that the vessel was held by pirates] without any maintenance as this was prohibited by the pirates. Accordingly the reliability of the generators and auxiliary equipment cannot be relied upon. Note the port outer generator [sc the no 3 generator]has already seized during piracy period and is out of commission”
“The vessel has to be moved by18 December 2009 . She can go nowhere on her own and will require tug assistance. But the reality is, given her lack of longitudinal strength, that she cannot leave the Gulf of Khambhat. In all the circumstances, the obvious conclusion is that the vessel should be sold for scrap to a buyer at Alang - 20 or 30 miles south of her present location. Delaying the decision puts at substantial risk the residual scrap value presently in the vessel by avoiding salvage/wreck removal costs”
“Having assessed the extent of structural damage to the hull and main engine damages, Owners consider that the cost of repairs to the hull, alternatively the cost of hull and engine repairs will well exceed the insured value of the vessel …”
“the only efficient way to carry out the recommended repair in the double bottomed tanks i.e. replacement of bottom plate, bottom longitudinals, girders, floors, webs, tank top etc, in double bottom tanks and hopper tanks as well as replacement of hopper plate together with longitudinals is to prefabricate sections of the tank structure and then to fit outboard, including tank tops and side shell. Each double bottom tank will require 8 blocks. Cutting and filling will take place in 4 or 6 places at the same time. Taking into account the amount and scope of steel works in the tanks, trying to repair them by cropping and renewed of the steel structure in situ, much likely will result to deformation of the ship’s structure”
“the whole affected deck plating with the associated internals to be examined and renewed as required”, and “The whole ship’s deck plating to be checked for alignment, ship’s longitudinal strength to be recalculated and restored as original. The whole ship’s original structure integrity which has been impaired due to grounding to be returned to its pre-damaged condition”
“Due to the nature of the damage i.e. extreme hogging/misalignment and twisting of the vessel’s hull, she has to be placed into a ship building graving dock for further investigation of the hull structure damages. Thus re-instate the longitudinal and the transverse strength integrity returning her in all respects to the pre-damage condition including but not limited to alignment of the vessel. All above repairs to be dealt with according to the Class requirements/supervision.”
“a) It appears that there is extensive damage leading to permanent deformation at and around the main deck in the area of cargo holds five (5) and six (6). Similar damage also appears in the double bottom in the same area including the hoppers. Unfortunately this type of damage cannot be repaired. The only acceptable method is replacement of the affected/damaged area. This is due to the fact that the damaged area has been subjected to plastic deformation from to (sic) bending moments exceeding the capacity of the vessel. Due to the global nature of the deformation the only way to restore the vessel to her pre-accident condition is the refabrication and replacement of the damaged section. b) Given that almost 30% of the cargo hold area of the vessel will be cut at two sections, the repair process is a challenging task. Special attention needs to be paid on the logistics of the repairs and the welding sequence of the new section to avoid high residual stresses and welding induced distortion. These are by themselves challenging technical problems. c) We suspect that the main engine and the propulsion shafting arrangement of the vessel might also have been heavily damaged. This has to be verified and checked and proper corrective actions to be taken. It’s almost a certainty that the alignment of the propulsion shaft needs to be reworked due to its sensitivity to hull deflection. d) We are concerned on the matching/alignment of the new and old sections. This process necessitates extensive repairs at the old sections of the vessel as well, to achieve an exact match. e) The cost estimate of such repairs is beyond the scope of Classification. Nevertheless it is surmised that it will be extremely high.”
“It is not feasible to carry out an underwater survey at the present anchorage due to the very poor clarity of the water and thus it is not possible to ascertain the full extent of damage at this time. Though it would appear from internal inspection that the damage extends from No 3 to No 7 hold and quite possibly beneath the engine room. However it is evident that the [fuel oil double bottomed] tanks no. 5 and 6 have buckled. In addition the transverse bulkheads and side frames have buckled in holds 4-7. All plans etc were reportedly burnt whilst the vessel was under captivity and therefore the thickness of plates, framing spacing etc is unknown at this time but it is assumed that the damage extends across the full width of the vessel we can arrive at a likely renewal in the order of 80x27 metres, which assuming 18mm plate and allowing 25% of internals very roughly gives a steel renewal in the vicinity of 390 tonnes. The main engine needs to be stripped down to ascertain the full extent of damage but clearly the journal bearings, thrust bearings/pads are damaged and it is possible that crankshaft is also damaged and that the engine may need realignment and re chocking. At the time of attendance no work/stripping down of the main engine had been commenced.”
“1. Clearly the vessel would have to be towed to the Far East which would be a 30 day tow with costs of a minimum of US$500,000 . 2. Steel renewals in Dubai the nearest port which could handle this are US$6 – 8 kilo which gives about$2,100,000 for steel renewals, even in China you won’t get better than US$3 per kilo which gives about US$1 million plus towage costs. 3. A Sulzer RN76 is a large engine, repair costs given that we are going to have to strip the engine right down are easily going to be US$500,000 before we start talking line boring, crankshaft renewal etc. Probably US$2,500,000 is more likely. 4. Dry-docking costs, 300 tonnes of steel is a minimum 30 day job, whilst engine repairs are more likely to be 90 days, US$350,000 is very conservative. 5 Superintendence for 90 days is US$90,000 . 6. Technicians for 90 days US$150,000 7. Chuck in ventilation, staging, class, cranes, parts etc etc another US$500,000 minimum.”
“In respect of damage to the double bottom structure we would recommend that consideration be given to using block construction, although care has to be taken to prevent the hull from distorting when cutting out the damaged section”
“Everybody was saying it was hogged and I looked at the paint and said, ‘Okay, this looks a bit hogged’, so I have to agree”
“The tank top towards the starboard side was set up by about 20 cm. The port side tank top was satisfactory”
“Tank top plating was found to be set up by about 40 cms sloping down towards the forward bulkhead”
“… it was reported to [him] that sea water has been observed on the sounding tape of no 5 [double bottom fuel oil] Tanks (port and stbd) suggesting seawater ingress through a crack or hole in the bottom shell plating”
“It was expected [from the observations of the vessel at anchorage] that the bottom shell would be compressed and be touching the tank top. However that was not to be the case”
“During low tides about half the vessel’s length just forward of the engine room sat completely unsupported on the beach. This occurred twice daily for several hours for at least a month after the cutting commenced. During this time it was possible to observe the Vessel’s bottom plating. The double bottom structure remained intact and showed no failure in way of No 5 and 6 holds or elsewhere ie there was no evidence to suggest that the bottom structure had collapsed”
“Told them USD 5 million a few weeks ago, and they need it ‘soonest’, as always, to include numbers in the Defence pleadings. So if you could send it before your leave, that would be great. Do you have something you could put together on a spreadsheet giving the cost breakdown, then add contingency to come up with a number (less than 5m if possible), that we will say ‘say USD 5 million’.”
“The term “perils of the seas” refers only to fortuitous accidents or casualties of the seas. It does not include the ordinary action of the winds and waves.”
“It is beyond question, that if a vessel strikes upon a sunken rock in fair weather and sinks, this is a loss by perils of the sea”
“there must be some casualty that could not be foreseen as one of the necessary incidents of the adventure. The purpose of the policy is to secure an indemnity against accidents that may happen, not against events which must happen”
“even in fine weather and fair seas, sooner or later every powerless vessel will drift into something”
“Where a ship sinks through its own inherent weakness, there is no loss recoverable under the ordinary form of policy. It is not enough for this purpose that the vessel is unseaworthy. The loss must be dissociated from any peril of wind or water, even if those form the immediate context of the loss, and constitute the immediate agency (for example, the percolation of water through an existing flaw in the hull) by which the loss takes place.”
“If, for example, the incident was associated with the watch-keeping activities on the bridge being too slack, they had taken bearings every hour and that was related - the investigation of the near miss report revealed that that was an issue, then completing the report would allow you to put in corrective action so it doesn’t happen again”
“1.1 A main source of electrical power of sufficient capacity to supply all the [electrical ancillary services necessary for maintaining the ship in ordinary operational and habitable conditions] shall be provided. This main source of electrical power shall consist of at least two generator sets. 1.2 The capacity of these generating sets shall be such that in the event of any one generating set being stopped it is still possible to supply those services necessary to provide normal operational conditions of propulsion and safety. Minimum comfortable conditions of habitability shall also be ensured which include at least adequate services for cooking, heating, domestic refrigeration, mechanical ventilation, sanitary and fresh water”
“A main source electrical power is to be provided, of sufficient capability to supply all electrical auxiliary services necessary for maintaining the ship innormal operational and habitable conditions and for the preservation of the cargo without recourse to the emergency source of electrical power”, and that: “The main source of electrical power is to consist of at least two generating sets. The capacity of these generating sets is to be such that in the event of any one generating set being stopped it will still be possible to supply those services necessary to provide: a) normal operational conditions of propulsion and safety … b) minimum comfortable conditions of habitability … c) preservation of the cargo …. Such capacity is, in addition, to be sufficient to start the largest engine without causing any other motor to stop or having any adverse effect on other equipment in operation”
“In no 5 double bottom tank, the tank top and hopper plating were set up and most internal strengthening members (including longitudinal frames, girder, floor plates, hopper tank web frames, floor plates and stiffeners) were distorted and/or buckled. In way of frames 94-112 [sc. the frames of hold no 5] all structural strengthening members were severely buckled across the width of the vessel, with numerous and severe cracks and welding detachments. In no 6 double bottom tank, the bottom and tank top plating were set up, and most internal strengthening members were distorted and/or buckled.”
“If a ship is so injured that it cannot sail without repairs, and cannot be taken to a port at which the necessary repairs can be executed, there is an actual total loss, for that has ceased to be a ship which never can be used for the purposes of a ship; but if it can be taken to a port and repaired though at an expense far exceeding its value, it has not ceased to be a ship, and unless there is a notice of abandonment there is not even a constructive total loss”