“Notice of Readiness (NOR) may be tendered after arrival of the vessel at Loading Port, at any time, ……provided that the vessel is ……cleared by the Port Authorities……. ”
“5.10 Time lost as a result of all or any of the causes hereunder shall not be computed as laytime, unless vessel is already on demurrage: ……… (iv) Accident at the mines, railway or ports; ……… (viii) Partial or Total interruptions on railways or port; ……… (ix) Any cause of whatsoever kind or nature, beyond the control of Seller, preventing cargo preparation, loading or berthing of the vessel.”
“The pier and the ore loading system were dimensioned to serve bulk carriers in the range of 40,000 DWT to 230,000 DWT……The berthing pier has a total length of 143 meters and three berthing dolphins equipped with Sumitomo Type fenders spaced 60 meters one from another plus four mooring dolphins..… ”
“Vessels must always berth on the starboard side; the damaged dolphin [D3] will be lit and must not be touched by the vessel during the berthing operation. Four tugs to be used for berthing operations – two of them at least 45 tons tbp. Wind conditions of 15 knots or more must be assessed during the operation by the pilot. …… The vessel’s portside anchor must always be used as an aid in the berthing operation in order to limit the distance from the dolphin and reduce the approach speed. …… During berthing, the vessel must always contact Dolphin D1 first”
“In case of strikes, lockouts, civil commotions, or any other causes or accidents beyond the control of the consignee which prevent or delay the discharging, such time is not to count unless the vessel is already on demurrage…”
“…by reason of the word “other”, the words “beyond the control of the consignee” are capable of referring both to the specified events and to the unspecified causes.”
“The meaning which a document (or any other utterance) would convey to a reasonable man is not the same thing as the meaning of its words. The meaning of words is a matter of dictionaries and grammars; the meaning of the document is what the parties using those words against the relevant background would reasonably have been understood to mean.”
“In our view the clause refers to clauses which, by the contract, are under the control of the merchant; the effect of clause 3 is that, as between the owners and the merchant, the stevedores are under the control of the merchant. The situation then is that the cause of the delay may or may not have been caused by something which was not under the control of the merchant. We cannot tell which. The defence is therefore not made out and the claim for demurrage succeeds.”
“However, for reasons which have not been made clear, but which would appear to relate to commercial rather than engineering issues, CPBS appear to have chosen not to repair/replace dolphin D3 immediately.”
“A master will endeavour to bring his ship to her berth parallel to the quay and moving very slowly. Nevertheless there are many occasions when a ship approaches a berth slightly angled to the quay and moving sideways under the force of high wind or as a result of tug pushing…..”
“Maybe half a knot, but how can I measure it?”
“Subject: Vine c/p dated December 2007 Account: Wellmix Shipping Ltd.,……Hong Kong We, [GIS] hereby guarantee the full and complete performance execution and fulfilment of charterers obligations under the said charterparty VINE cp dated December 2007 and the payments of all amounts due to you thereunder.”
“This Charter Party shall be governed by English Law and any dispute arising out of or in connection with Charter shall be submitted to the exclusive Jurisdiction of the High Court of Justice of England and Wales.”