"I acknowledge that the proposed surface water drainage strategy has the potential to result in betterment. It is proposed to regulate surface water run off flows through the use of attenuation basins and tanks so that run off will be attenuated on site up to and including the 1 in 100 year plus 50% climate change event. This would have post development benefits as it would reduce peak flows which contribute to existing flooding downstream and ensure the development does not increase the risk of flooding elsewhere. Furthermore, the proposed re alignment of Ou Beck from the rear gardens of properties on Knowle Hill Crescent and Barnacre Close would assist to alleviate the current risk of flooding. These improvements form a positive aspect of the scheme providing wider sustainability benefits. Whilst they do not alter my finding that a Sequential Test is required, I take account of them in the planning balance." f. At DL58 she noted that neither the Environment Agency nor the Lead Local Flood Authority had objected to the development. Although she says, correctly, that that is not relevant as to whether a Sequential Test is required; g. As DL59-60 she references the fact that there had been a Strategic Flood Risk Assessment ("
"98. In light of the lack of a 5-year housing land supply, the tilted balance in paragraph 11d) of the Framework is engaged. However, as I have found that a Sequential Test is required and none has been submitted, in line with Footnote 7, this provides a clear reason for refusing the development proposed. The failure to provide a Sequential Test is also in conflict with Policy DM33 of the LP2, Policy SP8 of LP1 and section 14 of the Framework. 99. The appellant has submitted that if I determine that a Sequential Test is required and Footnote 7 engaged, this forms a material consideration and one factor in the planning balance. It is further argued that no harm results from this policy failure, since there is no risk of flooding to the development due to the design, layout and mitigation measures proposed and a betterment would be provided should the development proceed. The parties could not point me to an appeal decision where Footnote 7 had been engaged and yet permission had been granted. Such an approach would be unprecedented and would undermine national flood risk policy. 100. In the case of Appeal A, the overriding consideration is the failure to undertake a Sequential Test. Appeal A conflicts with the development plan and the material considerations do not indicate that the appeal should be decided other than in accordance with it. As I am dismissing Appeal A, I also dismiss Appeal B."
"11. Plans and decisions should apply a presumption in favour of sustainable development. For plan-making this means that: a) all plans should promote a sustainable pattern of development that seeks to: meet the development needs of their area; align growth and infrastructure; improve the environment; mitigate climate change (including by making effective use of land in urban areas) and adapt to its effects; b) strategic policies should, as a minimum, provide for objectively assessed needs for housing and other uses, as well as any needs that cannot be met within neighbouring areas, unless: i. the application of policies in this Framework that protect areas or assets of particular importance provides a strong reason for restricting the overall scale, type or distribution of development in the plan area (footnote 7); or ii. any adverse impacts of doing so would significantly and demonstrably outweigh the benefits, when assessed against the policies in this Framework taken as a whole. For decision-taking this means: c) approving development proposals that accord with an up-to-date development plan without delay; or d) where there are no relevant development plan policies, or the policies which are most important for determining the application are out-of-date, granting permission unless: i. the application of policies in this Framework that protect areas or assets of particular importance provides a clear reason for refusing the development proposed; or ii. any adverse impacts of doing so would significantly and demonstrably outweigh the benefits, when assessed against the policies in this Framework taken as a whole. Footnote 7: The policies referred to are those in this Framework (rather than those in development plans) relating to: habitats sites (and those sites listed in paragraph 187) and/or designated as Sites of Special Scientific Interest; land designated as Green Belt, Local Green Space, an Area of Outstanding Natural Beauty, a National Park (or within the Broads Authority) or defined as Heritage Coast; irreplaceable habitats; designated heritage assets (and other heritage assets of archaeological interest referred to in footnote 72); and areas at risk of flooding or coastal change."
"The aim of the sequential test is to steer new development to areas with the lowest risk of flooding from any source. Development should not be allocated or permitted if there are reasonably available sites appropriate for the proposed development in areas with a lower risk of flooding. The strategic flood risk assessment will provide the basis for applying this test. The sequential approach should be used in areas known to be at risk now or in the future from any form of flooding."
"The application of the exception test should be informed by a strategic or site-specific flood risk assessment, depending on whether it is being applied during plan production or at the application stage. To pass the exception test it should be demonstrated that: a) the development would provide wider sustainability benefits to the community that outweigh the flood risk; and b) the development will be safe for its lifetime taking account of the vulnerability of its users, without increasing flood risk elsewhere, and, where possible, will reduce flood risk overall."
"Where an assessment shows that flood risk is a consideration for a plan or development proposal, the process is set out below: Avoid • In plan-making, a sequential approach should be employed. This involves applying the 'Sequential Test' and, if needed, the 'Exception Test'. • In decision-making, where necessary, planning authorities apply the Sequential Test and, if needed, the Exception Test, to ensure that flood risk is minimised and appropriately addressed. • Where the sequential and the exception tests have been applied as necessary and not met, development should not be allowed."
"Even where a flood risk assessment shows the development can be made safe throughout its lifetime without increasing risk elsewhere, the sequential test still needs to be satisfied. Application of the sequential approach in the plan-making and decision-making process will help to ensure that development is steered to the lowest risk areas, where it is compatible with sustainable development objectives to do so, and developers do not waste resources promoting proposals which would fail to satisfy the test. Other forms of flooding need to be treated consistently with river and tidal flooding in mapping probability and assessing vulnerability, so that the sequential approach can be applied across all areas of flood risk."
"19. The relevant law is not controversial. It comprises seven familiar principles: (1) Decisions of the Secretary of State and his inspectors in appeals against the refusal of planning permission are to be construed in a reasonably flexible way. Decision letters are written principally for parties who know what the issues between them are and what evidence and argument has been deployed on those issues. An inspector does not need to "rehearse every argument relating to each matter in every paragraph" (see the judgment of Forbes J. in Seddon Properties v Secretary of State for the Environment (1981) 42 P. & C.R. 26 , at p.28). (2) The reasons for an appeal decision must be intelligible and adequate, enabling one to understand why the appeal was decided as it was and what conclusions were reached on the "principal important controversial issues"
"30. In our judgment, then, the policy stated in the WMS is not to be faulted on the ground that it does not use language which indicates that it is not to be applied in a blanket fashion, or that its place in the statutory scheme of things is as a material consideration for the purposes of s.38(6) of the 2004 Act and s.70(2) of the 1990 Act, and no more. It does not countermand or frustrate the effective operation of those provisions. The judge has, with respect, conflated what the policy says with how it may lawfully be deployed."
"38. Unlike others in the NPPF, the policy in paragraph 90 does not identify factors that may tell against the proposition that the application "should be refused"
"... 39(13). In other cases under limb (ii), the relevant "
"45. The following practical summary may assist practitioners in the field, so long as it is borne in mind that this does not detract from the more detailed analysis set out above:- • It is, of course, necessary to apply s.38(6) in any event; • If the proposal accords with the policies of an up-to-date development plan taken as a whole, then unless other considerations indicate otherwise, planning permission should be granted without delay (paragraph 11(c) of the NPPF); • If the case does not fall within paragraph 11(c), the next step is to consider whether paragraph 11(d) applies.
"43. It is also self-evident that national policy is not statute, it operates as a material consideration. Flood policy within the local plan is one policy among many. There is no axiomatic refusal if there is conflict, that too is a question of judgment, balancing up the various factors."
" (f) The benefits of the proposal and the planning balance 49. The Council acknowledge that the proposal will attract numerous benefits. However, the Council's case is that given there is a clear reason for refusal in respect to flood risk, the tilted balance is not engaged and there is a clear reason to refuse permission. The parties are unaware of an instance where there has been a clear reason to refuse and yet permission has been granted. It would be a dangerous precedent that would undermine flood risk policy."
"47. Taking the above considerations into account, I attach limited weight to the scheme's failure of the sequential test and resulting conflict with Policy G8, and greater weight to the scheme's compliance with Policy JP-S4 of the JDP, which amongst other things more generally seeks to locate and design development so as to minimise the impacts of current and future flood risk."
"36. Like the judge, I would not accept that, as a matter of law, the Secretary of State ought to be aware of every previous decision taken in his name, whether by himself or a ministerial predecessor or by one of the inspectors to whom his decision-making function is largely delegated. In my view that concept is unrealistic and unworkable, given the number of decisions on planning appeals that have been made, year upon year, since the modern statutory code came into existence under theTown and Country Planning Act 1947 . There will, however, be circumstances in which, having regard to the interests of consistency in decision-making, the court is prepared to hold that the Secretary of State has acted unreasonably in not taking into account a previous decision of his own. Whether this is so in a particular case will always depend on the facts and circumstances (paragraphs 102 to 104 of the judgment). A possible example would be a case in which, within a short span of time, the Secretary of State has called in applications for his own determination, or recovered jurisdiction in appeals, in cases of a sufficiently similar kind, to which the same policies of the development plan apply."