“5. Any reserved matters application submitted in respect of layout shall be accompanied by a connectivity and implementation plan, the details of which shall include: - Detailed plans to scale, including levels (to an agreed off site datum) showing a continuation of the estate road beyond the details shown on plan reference - Site Access - Priority Junction Drawing No 19479-02-GA Rev C, including footways and cycle routes within the site, including a connection between the development site indicated on plan reference Location Plan B9812-AEW-SI-XX-DR-A-501 Rev P1 and the remaining Primary Employment Area Land allocation (accessed off Lockett Road) to the north west terminating at the most northern point.”
“The land to the immediate east which has planning permission includes a 3m shared facility for pedestrians and cyclists on one side of the access to the A58 Bolton Road. There is a standard 2m footway on the other side of the carriageway. This standard of infrastructure is required to serve the proposed development and any future parcels of land that come forward as part of the wider employment allocation. Furthermore, this is also the standard required for the access road to become adopted highway.”
“ Summary In view of the above, there are outstanding issues queries and issues relating to car parking, access to bus services via Woods Lane, a vehicular connection to land to the immediate east and a commitment to deliver improvements at the A58 Gerard Street/A49 Warrington Road/A58 Liverpool Road/Bryn Street junction that must be addressed.”
“The capacity assessments contained within the submitted Transport Assessment have indicated that such a vehicular link is not required to mitigate any highway capacity issues, this is not disputed by the highways authority - the highways impact is not ‘severe’ and there is no justification to refuse planning permission on highways grounds. Notwithstanding, the highways officer has indicated that a planning condition is required and that it should have the same wording as Condition 5 which is was attached to the neighbouring ‘land to the east’ planning application (LPA ref: A/21/92036/OUTMAJ)’. We do not agree with the officer’s conclusion – as such condition is clearly not necessary to make the development acceptable in highways terms. Further, the applicants have confirmed their willingness to accept a condition to ensure that pedestrian / cycle access is provided between the two sites and safeguard the opportunity to provide a vehicular route through both sites if required in the future.”
“The parameters plan shows how access can be continued within the development site, which shows a continuation of the road network running almost parallel to the north-western boundary of the application site. The internal arrangements on the parameters plan also show a point of connection up to the north-east and south-west boundaries of the application site, which will not prejudice the new road junction arrangement at Lockett Road and will provide potential links to the wider PEA land, ensuring permeable connections can be made in combination with the consented appeal development site to the east, and remaining undeveloped land to the south-west of this application site. In overall terms, these connectivity arrangements, which are to be controlled via condition, will achieve good planning from a design perspective for the PEA allocation, providing potential alternative routes of travel in the future, which in turn will provide highway network operation betterment around the application site and PEA allocation locally (than without a connecting through road in the PEA), and it will also safeguard future development on the remaining SLIE land within the PEA allocation.”
“Footways are located on Lockett Road and the B5207 Bryan Road in the vicinity of the application site. These footways have a minimum width of 2 metres and are located on both sides of the carriageway. It is proposed for Lockett Road to be extended into the site to serve the development and the wider employment allocation. The land to the immediate east which has planning permission includes a 3m shared facility for pedestrians and cyclists on one side of the access to the A58 Bolton Road. This standard of infrastructure will also serve the proposed development, providing a connection to Lockett Road and any future parcels of land that come forward as part of the wider employment allocation.”
“To complete the bypass a vehicular connection from the proposed development to the adjacent land to the east that was granted planning permission in 2023 is required. The importance of this connection was referenced in the Appeal Decision for land to the immediate east with the Inspector including a condition to ensure any future reserved matters application in respect of layout shall be accompanied by a connectivity and implementation plan, the details of which should include a connection between the development and the remaining PEA allocation (accessed off Lockett Road) to the north west terminating at the most northern point. This connection has been secured via planning condition.”
“Condition 5 of A/21/92036/OUTMAJ (planning permission reference), granted on appeal was suggested and worded to ensure the estate road would make a connection through to Lockett Road, once proposals for the wider allocation came forward. The main reason was to achieve routes through the allocation, preventing a cul de sac arrangement or a potential ramson situation as a result of not building a connection up to the site boundary. The key point is that a condition was required to ensure a road connection was constructed up to the application site boundary, the neighbouring land. Reference is made to the drafting and wording of the planning condition, “terminating at the furthest edge of (the) application site on the northwest boundary of the development site, with the aim of providing a future connection to Lockett Road”
“There is no objection from the Highways Policy Officer on the access arrangement. The parameters plan shows how access can be continued within the development site, which shows a continuation of the road network running almost parallel to the north-western boundary of the application site. The internal arrangements on the parameters plan also show a point of connection up to the north-east and south-west boundaries of the application site, which will not prejudice the new road junction arrangement at Lockett Road and will provide potential links to the wider PEA land, ensuring permeable connections can be made in combination with the consented appeal development site to the east, and remaining undeveloped land to the south-west of this application site.”
“The scheme includes an internal access road shown on the parameters plan which formed part of the original submission. A further internal arrangement plan was submitted detailing the access road, with a termination point at the north-eastern boundary of the application site. The north-eastern provision would align with the planning requirements of the Appeal Decision site to the east, which requires under the consented scheme a continuation road / pedestrian/cycle link to the remaining PEA land within the allocation.”
“The representation received on the application refers to the above planning condition. The content of the representation has been considered within the overall assessment of this application, with the main issue being the interpretation of the planning condition and its specific wording. The representation refers to a connection point along a north-west boundary within the consented scheme, which when compared to the Caddick application would be along the south-east boundary of the Caddick application site (in the interpretation of the representation and image provided). This is where the difference in the interpretation exists. The applicant (Caddick) for this application have submitted a parameters plan to conform with the wording of the above planning condition, based on their interpretation of the above condition, with an internal access arrangement extending up to the north-eastern boundary of their application site. Following Counsel advise sought by the Local Authority, it has been advised that the internal road layout at this stage, as shown on the submitted parameters plan reference Land Use and Building Height Parameters Plan Ref: 2387/2005/Rev F under this application (Caddick), would adhere with the wording of the above planning condition and its requirements, and therefore does not form conflict with the wording or the objectives of the condition. It is also key to note that the existing condition also forms a requirement of the consented scheme and not one of this current application.”
“Any reserved matters application submitted in respect of layout shall be accompanied by a site-specific connectivity plan, the details of which shall include: Detailed plans to scale, showing highway, pedestrian and cycle connectivity up to and including the application site south-west boundary as shown on plan reference - Land Use and Building Height Parameters Plan Ref: 2387/2005/Rev F”
“No development hereby approved shall be brought into first use, until the vehicle access provision from Lockett Road, into the application site as shown on plan reference - Site Boundary Plan with Proposed Site Access Arrangement Ref 3578-F01 Rev A and Proposed Site Access Plan Ref 3578-F05 Rev B, up to and including the application site's north-east boundary and the full extent of the land in the applicant's control in this location, has been implemented in full.”
“Where amendments are made which significantly alter the nature or impact of the proposal – We will carry out further consultations as appropriate and again consider the views received before making a decision.”