“Proposed demolition of existing school, development of 48 dwellings (43 flats and five houses) and associated works”
“2000mm high timber fence”; and the Boundary Key on the drawing stated that the line represented: “TYPE 07 – 2000mm high timber close boarded fencing”
“2000mm high brick wall & timber fence added to western side of site”
“• As detailed in our previous responses of the25 January 2019 and9 August 2019 : ‘We advise that a detailed mitigation strategy would need to be submitted upfront in support of any planning permission sought. Mitigation should be appropriate and proportionate to the bat species and roost types on site.’ A detailed mitigation strategy must include: ◦ Details of the permanent bat house to be provided including: all dimensions of the bat house and volume of bat roost areas, details of bat access points, materials to be used (i.e. earth floors, double skin walls), internal structure, and human access points for monitoring, how the bat house sits within the surrounding landscape. ◦ Details of provisions for the long-term maintenance and site security of the permanent bat house. • As detailed in our previous responses of the25 January 2019 and9 August 2019 , we note that a complete lighting plan has not been submitted with the application as detailed in our previous response: ‘A lighting and landscaping plan would need to be submitted with a planning application. This should look to reduce lighting over the site as a whole and avoid lighting completely in proximity to the bat house and the boundaries of the site, ensuring that a vegetated dark corridor would be maintained to the bat house which connects to the wider landscape. The plans should also include: the type of luminaire (including the exact specification), the location and height of the luminaire.’ Due to the presence of several light intolerant species of bat on site we advise that this information will need to be provided prior to planning permission being given. We note that 3 pages of what appears to be a 24-page lighting report have been included in the appendix of the amended hibernation survey. Without the submission of the whole report, the submitted pages have no context and do not effectively demonstrate that adjacent habitat will remain unlit.’”
“We welcome the planting proposed for the western boundary in drawing 3703/PA/210 rev A and 3702/PA/010 that show the inclusion of 7 larger trees included along the western boundary in addition lower level vegetation interspersed between them. However this does not appear to be consistent with the planting outlined in the ‘Planting plan 421.01 rev A’ which only indicates three large trees will be planted. All three plans are appended to the ‘the Hibernation Survey, Addendum report, dated12 Nov 2019 by Soltys Brewster Ecology. In order to give greater confidence that the bat house can function in the south of the site, it should be demonstrated that a sufficient dark vegetated corridor will be retained. We note that part of an amended lighting plan has been submitted, however we note that only 2 pages of a 20-page report have been submitted. In addition we note that the Isolux modelling was undertaken with a device maintain of 0.80 (80% of full power), rather than the 100% outlined in the meeting held between ourselves, the LPA and developer on the27 March 2020 . In addition we note that that the modelling shows that the majority of the western boundary of the site is still to be lit to over 1 lux. Given that 3 of the 5 species recorded using this site currently would be considered light sensitive, the success of the mitigation is reliant on the provision of a robust dark vegetated [corridor] along the western boundary of the site.” ◦ Details of the permanent bat house to be provided including: all dimensions of the bat house and volume of bat roost areas, details of bat access points, materials to be used (i.e. earth floors, double skin walls), internal structure, and human access points for monitoring, how the bat house sits within the surrounding landscape. ◦ Details of provisions for the long-term maintenance and site security of the permanent bat house. [corridor] along the western boundary of the site.”
“A revised lighting plan has been produced by Tamlite Ltd (Drawing no: 319/2/E1) to address these comments. A commitment has been made that: • All external lights shall be 100% downward directional luminaires • External lights to be contractor controlled as follows – western boundary to be switched off between 8pm and 6am (April to September) and dimmed to 25% (Oct to March). • All other external lighting to be controlled via PIR and timer (set to 1min max). With the adoption of these measures, the enclosed lighting plan demonstrates that a dark corridor can be maintained along the western boundary of the site, providing connectivity between the proposed bat house and the immediate local area. The lux plots illustrate that light reflected at ground level up to the red line boundary is around 1.0 lux, reducing further west. However it should be noted that the bollard lights are 1m high and throw light down and as such there would be virtually no lux level increase above a height of 1m. During the April – September period, these lights would be switched off and dimmed to 25% (i.e. a 75% reduction) from October to March thereby further reducing any risk of light spill and maintaining the dark corridor.”
“The Council’s Ecologist initially raised a holding objection stating that the applicant liaise with NRW regarding further survey required for bats and the provision of mitigation/compensation and that when NRW are satisfied with the proposals, and remove their significant concerns, LPA ecologist will then be in a position to assess the application with respect to bats and other protected/priority species and habitats. In addition, given the importance of the site for numerous lightsensitive species of bats, there is a requirement that the applicant design the (external) lighting for the scheme prior to determination. … Following re-consultation based on: • Proposed Bat Roost’ Drawing No 3703/PA/230 Revision A, dated Aug 19, by Pentan Architects • ‘Proposed Site Layout Aberthin Road, Cowbridge’ Drawing No 3703 / PA / 210 Version E, dated Aug 19, by Pentan Architects • Soltys Brewster Ecology Response Ltr dated23 August 2022 , uploaded as September 2021 NRW are now satisfied that their concerns can be overcome, if the documents identified above are included in the approved plans and documents condition on the decision notice. NRW welcome the proposal, set out in the Soltys Brewster Ecology response letter to turn off the lights along the western boundary between 8pm and 6am between April and September inclusive and the intention to dim the lights to 25% in the remaining months of the year. Bats and their breeding sites and resting places are protected under theConservation of Habitats and Species Regulations 2017 (as amended). Where bats are present and a development proposal is likely to contravene the legal protection they are afforded, the development may only proceed under licence issued by Natural Resources Wales, having satisfied the three requirements set out in the legislation. A licence may only be authorised if: i. The development works to be authorised are for the purpose of preserving public health or safety, or for other imperative reasons of overriding public interest, including those of a social or economic nature and beneficial consequences of primary importance for the environment. ii. There is no satisfactory alternative and iii. The action authorised will not be detrimental to the maintenance of the population of the species concerned at a favourable conservation status in its natural range. Paragraph 6.3.7 of Technical Advice Note 5: Nature Conservation and Planning (TAN5) states that a Local Planning Authority should not grant planning permission without having satisfied itself that the proposed development either would not impact adversely on any bats on the site or that, in its opinion, all three conditions for the eventual grant of a licence are likely to be satisfied. … With regard to test no 3, as stated above, NRW do not consider that the development is likely to be detrimental to the maintenance of the population of the species concerned at a favourable conservation status in its natural range, subject to identifying the approved plans and documents on the decision notice. In line with the ‘Dear CPO’ letter issued by Welsh Government on1st March 2018 , NRW request that an informative is attached to any planning permission granted, advising that planning permission does not provide consent to undertake works that require an EPS licence. This shall be secured by way of an Informative.”
“In terms of the amenity space there are some instances where we get very little. This has actually got quite a reasonable amount of amenity space. But as a point of clarification that we made yesterday in the matters arising note, the plan does indicate a 2m high fence, which some concern was raised how this amenity space and this more informal area beyond be accessed, but there is no fence will be around here and all this will be … you’ve got the seating area, but the rest will be albeit it’s supposed to be a dark corridor and quite naturalistic is going to form extended amenity space.”
“The submitted Proposed Site Layout Plan Rev I shows a 2m high fence to the back edge of the parking area. The agent has confirmed that this is in fact a drafting error and is not shown in the coloured boundary key. The agent has therefore confirmed that this fence will not be erected. Furthermore, Notwithstanding the submitted plans, details of all means of enclosure are however required by condition (Condition 5).”
“Notwithstanding the submitted plans, prior to the commencement of development (including any demolition) full details of all means of enclosure around and within the site, including details of any existing enclosures which are to be retained/altered, in addition to details of the works to reinstate / alter the existing low level stone wall, stone piers and railings and a 1.8m high stone wall along eastern boundary of Plot 1 shall be submitted to and approved in writing by the Local Planning Authority. Where the agreed means of enclosure forms the site boundary with adjacent dwellings, this means of enclosure shall be erected prior to the commencement of development (including any demolition). All other means of enclosure as approved shall be completed in accordance with the approved details prior to first beneficial occupation of the respective houses and flats and shall thereafter be so retained. Notwithstanding the provisions of theTown and Country Planning (General Permitted Development) Order 1995 (as amended for Wales) (or any order revoking and re-enacting that Order with or without modification), no other fences, gates or walls shall be erected within the site other than those agreed.”
“Other than demolition, no construction works shall commence on site until a detailed scheme for the surface water drainage of the site, showing how road and roof / yard water will be dealt with has been submitted and approved in writing by the LPA. If infiltration techniques are used, then the plan shall include the details of field percolation tests. Any calculations for onsite attenuation or discharge should also be included together with the details on the management of the drainage system. The approved scheme shall be implemented prior to first beneficial occupation of any unit.”
“(1) Construction work which has drainage implications may not be commenced unless a drainage system for the work has been approved by the approving body. (2) For the purposes of sub-paragraph (1)— (a) construction work means anything done by way of, in connection with or in preparation for the creation of a building or other structure, and (b) construction work has drainage implications if the building or structure will affect the ability of land to absorb rainwater.
“(1) On considering an application for approval the approving body must— (a) grant it, if satisfied that the drainage system if constructed as proposed will comply with national standards for sustainable drainage, or (b) refuse it, if not satisfied.” (a) construction work means anything done by way of, in connection with or in preparation for the creation of a building or other structure, and (b) construction work has drainage implications if the building or structure will affect the ability of land to absorb rainwater. (a) grant it, if satisfied that the drainage system if constructed as proposed will comply with national standards for sustainable drainage, or (b) refuse it, if not satisfied.”
“A withdrawal and resubmission would require a new scheme to comply with Sustainable Drainage legislation brought in in January 2019. The applicant’s competitive bid for the site was based on pre-application advice and as the number of dwellings had already been significantly reduced through negotiation, it was considered that incorporating sustainable drainage on site could render a new scheme unviable.”
“I think some mention was made about the drainage being deficient. The drainage certainly isn’t deficient. As correctly said, I can’t remember who raised it but the scheme was submitted prior to SAB [Sustainable Drainage Approval Body]. Nevertheless, we can’t help that. And as a result of that, the scheme will be dealt with under planning and the relevant planning conditions as opposed to being delt with by the separate SAB body. In essence, if it was to go down the SAB route, it would possibly likely mean that more open space and both surface drainage features would have to be provided, which would mean as a result you would probably have less of the area that could be developed, less parking, so you could even perhaps get the same number of units, but you wouldn’t have any provision for parking, which would actually—being in a sustainable location—would be not necessarily be a problem with as offices.”
“This outcome accords with the purpose of the [2010] Act and the transitional provisions. The Act required a new system of drainage approvals meeting national standards because the problems of flooding could not be left just to the planning system. The transitional provisions protect existing planning permissions and applications for construction works which were being considered at the time. They do not protect a different scheme which is put forward later, as the amended application was. There is no transitional protection for new schemes if an earlier scheme had planning permission: if the 48 dwelling planning application had been approved then [if] a planning application was made for the 34 unit scheme it would need drainage approval.”
“65. There are three ways in which a planning permission may be granted for such a development [i.e. a development other than that for which an application was originally made]: the initial application may itself be amended; permission may be granted only for part of the development applied for; and permission may be granted subject to a condition that modifies the development applied for. Quite apart from any requirements for notification and consultation, there are substantive limitations on the changes that can be effected by such methods. These limitations have been variously described but they are all concerned with whether the result is the grant of permission for a development that is in substance something different from that for which the application was initially made. That is because the legislation only gives power to local planning authorities to determine the application describing the development for which permission is sought which was made to them in the prescribed form and manner: see paragraphs [8]-[12] and [20] above.”