“on the basis that the existing tenants of Vanbrugh Court have a well organised Tenant’s Association … we would expect there to be reasonable resistance to any disruption to the occupiers, especially regarding the top floor flats. We would therefore expect the developer to have to “decant” the occupiers of the top floor flats for the period of the construction works into similar accommodation locally and cover all expenses accordingly.”
“….. As you are aware this application has been subject to objection and one of the particular concerns is in relation to construction impact. Whilst you have supplied a construction management plan we feel that it needs to be more detailed and address some specific concerns raised including the following; 1) Is the existing building structurally capable of accommodating a further storey? Do you have evidence to this effect? 2) Will it be necessary for the existing residents to decant into other accommodation during construction due to excessive noise and disturbance and any other reasons? … We firmly believe that without answers to these questions in advance, then Members are unlikely to make a decision.”
“…From our initial observations, it is considered that the existing building should be structurally capable of accommodating the proposed lightweight steel-framed storey on top by means of a steel frame spanning between the existing parapets to transfer the loads to the external brick walls. This system has the added benefit of potentially not affecting the existing roof in any way, as the metal frame would be above and detached from the existing roof, which will also reduce the noise disturbance to existing residents on the floors below. It is the intention of the developer to adopt this system if further investigation of the existing structure allows it. [It is important to note that as in any other construction project we will need to secure Building Control approval before works proceed on site, and the structural design will of course be part of that approval.] ….Considering our response to your first question above, it is highly unlikely that residents of the top floor will need to vacate their premises during construction, and we confirm that the Design Team will work towards that goal. However, should the existing roof require some localised repairs during the works, it may be necessary to temporarily relocate the affected residents for a limited time.”
“8.8.4 The applicant has submitted a draft Construction Management plan (CMP) providing details about the construction logistics/methods which has been reviewed by the Council’s Transport Officer …… 8.8.9 In addition, the applicant has stated that the existing building should be structurally capable ofaccommodating the proposed lightweight steel-framed storey on top by means of a steel frame spanningbetween the existing parapets to transfer the loads to the external brick walls. This system has theadded benefit of potentially not affecting the existing roof in any way, as the metal frame would beabove and detached from the existing roof, which will also reduce the noise disturbance to existingresidents on the floors below. It is the intention of the developer to adopt this system. It is highlyunlikely that residents of the top floor will need to vacate their premises during construction, and weconfirm that the Design Team will work towards that goal. …. 8.8.11 On this basis officers recommend a condition (Condition 4) for the submission and approval of a final Method of Construction Statement covering each of the above matters. Subject to a Method of Construction Statement being secured by condition, it is considered that the proposed construction works would not result in an unacceptable level of harm to highway safety or the amenity of surrounding properties”
“Vanbrugh Court The Planning Officer gave a presentation which included a summary of the report and subsequent addenda. Members were advised of the key material planning issues for consideration … Following the officer’s presentation, the objectors raised the following concerns: Following the officer’s presentation, the objectors raised the following concerns: • Vanbrugh Court Residents Association was united in opposing the unreasonable and speculative application which breached planning rules and legal rights of residents to peaceful enjoyment of their homes. • Resident engineers stated that it was not possible for a steel frame base to be used across the building and stay within the stipulated 3.1m extra height. The applicant’s agent had previously concluded the same, but now was proposing the removal of the roof and decanting all top-floor residents. • Residents were concerned that no structural survey had been undertaken. … Officers then provided the following information in response to questions from members: • If the proposal could not achieve compliance with Building Regulations, the applicant would likely need to seek amendment to the planning consent if permission were granted. A revised application would be submitted to the Local Planning Authority for its consideration. The Committee considered points raised by speakers and information provided by officers in conjunction with the report before making the following observations: • Members understood that the structural impacts were outside planning consideration and they struggled with the scale of the project, as it would have a significant impact to residents’ amenity. • A Member was cautious of construction works above existing buildings but understood the extent that Building Regulations covered the construction of the extension and alteration of the building and was satisfied that the scheme must comply with these regulations. • Members expressed concern that there had not been a full structural survey, the time it would take to resolve and how the asbestos removal would affect the timeline.”
“No development shall commence until full details of the proposed construction methodology, in the form of a Method of Construction Statement, have been submitted to and approved in writing by the Local Planning Authority. The Method of Construction Statement shall include details regarding: a) The notification of neighbours with regard to specific works and a named contact point b) Advance notification of road closures; c) Details regarding parking, deliveries, and storage; d) Details regarding dust mitigation e) Details of measures to prevent the deposit of mud and debris on the public highway; f) Details of coordination with surrounding developments and their construction timelines; g) Details of measures to protect the street trees during the demolition and construction periods; h) Details of delivery times, with strategies to minimise disruption to the local road network particularly during peak hours and avoid conflicts with pedestrians and traffic at the beginning and end of the school day; and i) Any other measures to mitigate the impact of demolition and construction upon the amenity of the area and the function and safety of the highway network.”
“Making effective use of land 119 Planning policies and decisions should promote an effective use of land in meetingthe need for homes and other uses, while safeguarding and improving theenvironment and ensuring safe and healthy living conditions. Strategic policiesshould set out a clear strategy for accommodating objectively assessed needs, in away that makes as much use as possible of previously-developed or ‘brownfield’land. 120 Planning policies and decisions should: … e) support opportunities to use the airspace above existing residential andcommercial premises for new homes. In particular, they should allow upwardextensions where the development would be consistent with the prevailingheight and form of neighbouring properties and the overall street scene, is well-designed (including complying with any local design policies and standards),and can maintain safe access and egress for occupiers.”
“Policy Q8 - Design quality: construction detailing a) When negotiating schemes the council will seek to ensure that proposed building designs and submitted details are buildable and visually attractive. Poorly-detailed and undeliverable built forms will be resisted. b) When considering the details of proposals the council will: i) resist ‘value engineering’ approaches which dilute the design quality and integrity of approved schemes; and ii) seek construction detailing that is unified, visually attractive, robust and maintenance free.” i) resist ‘value engineering’ approaches which dilute the design quality and integrity of approved schemes; and ii) seek construction detailing that is unified, visually attractive, robust and maintenance free.”
“10.26 The council recognises that in the realisation of buildings their design quality can often be compromised by poorly-considered detailing and inappropriate materials. 10.27 Failure to deliver good design at construction stage often robs schemes of their quality and results in poorly-considered detailing which can be visually unattractive and difficult to maintain. Common issues include: no consideration being given to roof drainage, parapet gutters and down pipes being unsympathetically placed as a result; integrated detailing being substituted for stick-on ornamentation which looks insubstantial, does not weather well and is vulnerable to damage; unattractive soffits, poorly placed meter boxes, boiler flues and gas pipes; and inadequate weathering detailing on cills, parapets and mouldings. 10.28 The council will normally request, as a condition of approval, detailed drawings including section of all external construction detailing 1:20 scale. See also CABE’s document ‘Protecting Design Quality in Planning’ (2003).”
‘Representation: “The construction period would negatively affect those that work from home and the elderly who spend most of their time in their homes.” Officer Response: “This matter is discussed at section 8.7 of this report. In summary a condition (condition 4) is recommended to ensure the submission and approval of a Method of Construction Statement which will need to detail measures to protect the amenity of surrounding properties.” Representation: “The construction period would negatively affect those that work from home and the elderly who spend most of the time in their homes. This is not detailed in section 8.7 of the report.” Officer response: “A condition (Condition 4) is recommended to ensure the submission and approval of a Method of Construction Statement which will need to detail measures to protect the amenity of the surrounding properties. The details required to safeguard surrounding neighbouring properties is outlined in this section.”’
“The proposals would require vacating top floor flats”
“construction will cause damage and water infiltration to top floor unit”
“This is not a material planning consideration. This would be covered by theConstruction (Design and Management) Regulations 2015 to ensure the development is built safely and to required standards.”
“Construction will cause damage to the external fabric of the building.”
“This is not a material planning consideration. This would be covered by the construction (Design and Management) Regulations 2015 to ensure the development is built safety and to required standards.”
“Condition 45 (boiler flues) does not ensure a boiler flue for the existing flats is provided…” utilities and boiler flues.”
‘Officer:…just going back to Policy Q8, it was really written with regard to the discharge of conditions for applications, so that we’re negotiating schemes, that we have some comfort that the construction detail and that is the external construction detailing is robust and well detailed and deliverable. Often we get fanciful forms in architectural submissions that are very difficult to detail. So really Q8 is more about external appearance construction detailing than it is about structural integrity?”’
“Paragraph 118 of the NPPF refers to effective use of land and sets out 5 points (points a to e) that planning polices and decisions should do to promote and effective use of land. Under point (e) which is most relevant to this site, there is support for “upward extensions” to utilise airspace of existing residential premises where this is consistent with the prevailing height and form of neighbouring properties. The proposed roof addition is considered in keeping within the existing context of surrounding building heights and would not interrupt the skyline.”