“It is considered that within the area identified as Multi Activity Hub area on the submitted Parameters Plan the intensity of activity, the extent of built development (see indicative Schedule of Accommodation) and height of buildings (up to 12m in parts) would result in a development that was visually intrusive, particularly from the public footpath which runs directly to the west of this part of the site and in wider views from Eaves Lane to the north and from public footpaths to the west and east. It would fail to respond to and respect this small scale landscape which the Churnet Valley Landscape Character Assessment confirms to be particularly sensitive to change. Similarly the area identified as Black Plantation occupies an elevated location, visually and physically isolated from the remainder of the proposed development. In this location and notwithstanding the submitted Woodland Approach Notes setting out a proposed phasing approach to development within this woodland, it is considered that there is potential for development to be readily visible near the skyline in near and more distant views to the south. As such the proposal is in conflict with Polices DC3 and SS7 of the Adopted Core Strategy Development Plan Document, the Adopted Churnet Valley Masterplan SPD and the National Planning Policy Framework which seeks to protect and enhance valued landscapes.”
“The main changes between this application and the previous submission, SMD/2014/0682 are as follows: - 1. The Parameter Plan now identifies within the Multi Activity Hub Area various zones within which buildings will be sited and gives maximum heights for these buildings. Reference to buildings within this area having a height of up to 12m has been removed. The zone for the Main hub building and Visitor centre refers to a maximum height for buildings of up to 6m above finished floor level (FFL). 2. The area in which the Main hub building and visitor centre can be located has been reduced (see Parameters Plan) 3. Additional landscaping is shown illustratively within the Hub area (see Illustrative Landscape Detailed Plan - The Hub) 4. The 14 lodges proposed at Black Plantation and the proposed vehicular access from Blackley Lane have been removed. Whilst both the land at Black Plantation and Blakeley Lane remain within the site edged red, Black Plantation is shown as “Existing Woodland to be Retained” on the Parameter Plan; 5. The total number of lodges for which planning permission is sought as part of this application re-submission remains at up to 250 lodges. The 14 lodges removed from Black Plantation have been re-distributed within Quarry 2, The Upper Lakes (see Parameter Plan and the Illustrative Detail Plan – Upper Lakes) 6. A “no right turn” vehicular access arrangement is proposed onto Eaves Lane. The revised vehicular access design is shown on the Eaves Lane Access Plan 7. A Tunnel Stability Report is provided 8. Further detail has been provided to clarify the alignment of the proposed footpaths, cycleways and bridleways at the site. This detail is provided on the Detailed Footpath Connection Plans and the Overall Footpath Connection Plan.”
“7. In the previous application, Members raised significant concern about the amount of traffic that would be generated by the development and accessing the surrounding road network. Particular concern was raised with regard to Eaves Lane/ Carr Bank to the east of the site access which would provide a direct route from the development to Alton Towers and Farley Lane. It formed one of the reasons for refusal of that application. The applicants have sought to address this concern in this revised application by providing for a ‘no right turn’ out of the site. This would be achieved by the introduction of a traffic island on the site access road which would physically prevent visitors and staff from turning right out of the site towards Carr Bank and Alton Towers. (see Drawing PB5196-0100A) These works are the subject of a separate planning application (SMD/2016/ 0388) which is considered elsewhere on the Agenda. Off-site improvements to the Whiston Eaves Lane/A52 junction are also proposed. Visibility at this junction is currently substandard. Works involve the provision of a no right turn facility into Whiston Eaves Lane when travelling from the west, increased visibility to the west and traffic calming measures. The works associated with the right turn and improved visibility are shown on drawing PB 1608-SK001C.”
“What I am suggesting there is, in light of some of the comments this morning is that we actually ask for a scheme to be submitted and approved by us so that we can look more closely at the traffic island to make sure that vehicles can’t go over that and then for it to be implemented prior to occupation.”
“23. The development hereby permitted shall not be brought into use until such time that details (including signage and road markings) of the works to realign the main site access on Eaves Lane, indicated on drawing no PB 5196-0100 Rev C hereby approved, so as to prohibit vehicles from turning right out of the site into Carr Bank Lane have been submitted to and approved in writing by the Local Planning Authority. The highways works shall be completed in accordance with the approved details and shall thereafter be retained for the life of the development. Reason:- To comply with the policies contained within the National Planning Policy Framework, the principles contained within Manual for Streets and Policies contained within the Staffordshire Moorlands Core Strategy Development Plan 2014.”
“5.4 The application is supported by a Transport Statement (TS). This confirms that surveys undertaken in May 2016 have demonstrated that the existing site access junction is lightly trafficked and that there is no capacity issue associated with the operation of the junction either as existing or if the proposed improvement were implemented. Although not directly relevant to the consideration of this application, the TS has tested the impact of the leisure scheme proposed on the Moneystone site (submitted under SMD./2016/0378 and to be considered elsewhere on this Agenda) on this junction which shows that, based on the projected 2020 traffic flows, in capacity terms the proposed site access junction is shown to operate satisfactorily. 5.5 The Local Highway Authority have carefully considered the application and submitted TS. They agree with its conclusions and raise no objection to the application. There are as such no objections to the application on highway safety and access grounds and proposal accords with Policy T1 of the Core Strategy and advice in the NPPF.”
“1. The proposal in isolation would be likely to lead to unsafe manoeuvres on the public highway and be likely to worsen highway safety in the locality contrary to policies DC1 - Design Considerations and T1 - Development and Sustainable Transport of the Staffordshire Moorlands Core Strategy Informatives 1. The Local Planning Authority (LPA), in reaching this decision, has followed the guidance in paragraphs 186 and 187 of the National Planning Policy Framework. The Framework advises that the LPA should work proactively with applicants to secure developments that improve the economic, social and environmental conditions of the area. Despite advice it has not been possible to negotiate a form of development which overcomes the environmental and social harm referred to above.”
“… a local planning authority is an administrative body, determining an individual application for planning permission. Its reasons ought to state why planning permission was granted, usually by reference to the relevant planning policies. But it is not conducting formal adjudication in a dispute between an applicant … and objectors and so it is not required to give reasons for rejecting representations made by those who object … I … consider that it would be unduly onerous to impose a duty to give detailed reasons … where a local planning committee gives reasons for a grant of planning permission kit need only summarise the main reasons for the decision and can do so briefly. The committee is not required to set out each step in its reasoning nor indicate which factual matters are accepted or rejected …”
“In summary and not surprisingly, the TA concludes that traffic is expected to increase on the local roads around the site. The percentage increases set out above are all noted in the TA to be from relatively low baseline traffic flows. These increases have been considered against a set of traffic capacity significance criteria in the TA. The operational capacity assessment (which includes consideration of driver delay) of both of these junctions using the significance criteria concludes that the application is expected to have low operational impact on these junctions. To help mitigate the impact of trips caused by the development a Travel Plan Framework (TPF) and Travel Plan (TP) accompany the TA and include a number of measures that will encourage travel by non car modes (staff car share, cycle storage, Alton Towers bus for example). With these measures, the residual impact is predicted to be Minor Adverse in respect of the impact on traffic flows and a Negligible impact on driver delay. In respect of pedestrian delay and amenity, pedestrian severance, accidents and safety the residual impact is predicted to range form negligible to minor beneficial. The TA notes that although the existing A52/Whiston Eaves Lane junction could cater for the additional traffic demand in capacity terms, highway works are proposed at the junction to accommodate a right turn facility and increase the visibility splay to the west. The highway works are aimed at improving the existing sub-standard layout in highway safety terms (para 7.5.4).”
“The LHA advise that although no objection was raised to the previous application on highway grounds, this application has sort to introduce additional measures which may impact on the highway, including improvements to the existing site access to prohibit the right turn out of the site onto Eaves Lane and removal of Blakeley Lane to service part of the development. The vehicular traffic previously assigned to Blakeley Lane has now been assigned to Eaves lane. The LHA conclude by saying that the modelling in the TA of the access junctions and surrounding network shows that they will operate within their practical capacity. The existing access to the development from the A52 will be upgraded and different proposals for this improvement have been considered. It is also considered that transport mitigation measures can be secured through the TPF. It is for these reasons that the LHA raise no objection subject to conditions and a Section 106 Agreement to secure a contribution of£11 000 towards the monitoring of the Travel Plan and£5 000 in the event that a Traffic Regulation Order is pursued for speed reduction on the A52.”