“18. Although the provision of new homes, including affordable housing, would be an important social and economic benefit, the Secretary of State concludes that granting permission for either of the appeal schemes would be contrary to the Development Plan, so that it is necessary to consider whether there are material considerations sufficient to warrant a decision contrary to that. 19. With regard to Appeal A, the Secretary of State concludes that the benefits of the scheme are significantly and demonstrably outweighed by the adverse impacts including that on the Council’s overall spatial strategy for housing, their economic objectives and the portfolio of employment land, and the urbanising impact on North Ferriby. In the case of Appeal B, the Secretary of State concludes that these disbenefits would be compounded by the reduced quantum of housing while the funding for a bridge across a railway line would not be a proportionate or reasonable response to any harm to the supply of employment land.”
“As such, providing the proposals were accepted to be a form of sustainable development, the planning balance to be applied would be that permission should be granted unless any adverse impacts of doing so would significantly and demonstrably outweigh the benefits.”
“13.63. With regard to the five year housing requirement, I consider that the Council’s figure of just over 10,000 for the housing market area is to be preferred, on the basis that it accords most closely with the relevant national policy and offers a reasonably robust, full, objective assessment of need. Use of an HMA-based figure should be understood as part of the first stage of formulating the requirement according to national policy rather than the second stage of applying a constraint on the basis of local policy making. The Secretary of State may conclude that the requirement should be based on the ERYC administrative area, in which case the Council’s figure of just under 14,000 is to be preferred over the Appellant’s figure of 15,300. 13.64. The Appellant’s approach to the assessment of housing land supply is fundamentally flawed so that the Council’s assessment of supply, at almost 15,000, is also to be preferred. Thus, whether the analysis is based on the HMA or the ERYC area, I consider that the Council has demonstrated the existence of a five year housing land supply. Even if the Appellant’s five year housing requirement of 15,300 is taken, the shortfall of 300 would be modest in the context of the overall requirement, making it debatable whether any adverse effect on housing delivery due to supply constraints would be identifiable in practice. 13.65. Since it has not been shown that there is any pressing need for additional sites to come forward to sustain the local supply of housing, I consider that the appeal proposals would not deliver additional benefits by virtue of their contribution to that supply. The contribution of the proposals to the supply of affordable housing is a different matter. Here, significant need has been demonstrated and it seems likely that such need will persist. For that reason, substantial weight should attach to the proposals, in proportion to the extra contribution they would make to the supply of affordable housing.”
“To boost significantly the supply of housing, local planning authorities should: • use their evidence base to ensure that their local plan meets the full objectively assessed needs for… housing “in the housing market area so far as is consistent with the policies set out in this Framework…”; • local planning authorities were required to identify and update annually a “supply of specific deliverable sites sufficient to provide 5 years’ worth of housing against their housing requirements…” • use their evidence base to ensure that their local plan meets the full objectively assessed needs for… housing “in the housing market area so far as is consistent with the policies set out in this Framework…”; • local planning authorities were required to identify and update annually a “supply of specific deliverable sites sufficient to provide 5 years’ worth of housing against their housing requirements…”
“11. To be considered deliverable, sites should be available now, offer a suitable location for development now, and be achievable with a realistic prospect that housing will be delivered on the site within five years and in particular that development of the site is viable. Sites with planning permission should be considered deliverable until permission expires, unless there is clear evidence that schemes will not be implemented within five years, for example they will not be viable, there is no longer a demand for the type of units or sites have long term phasing plans.”
“34. The issue for the inspector was whether the strategic sites were "deliverable" as defined by Footnote 11 so that they fell within the meaning of [47] and should have been included in the assessment of housing land supply. Footnote 11 is not entirely straightforward, but the following points are relevant to its interpretation: • It is common ground that planning permission is not a necessary prerequisite to a site being "deliverable". This must be so because of the second sentence of Footnote 11 and because it would be quite unrealistic and unworkable to suggest that all of the housing land supply for the following five year period will have achieved planning permission at the start of the period; • The parties are agreed that a site which is, for example, occupied by a factory which has not been derequisitioned, or which is contaminated so that housing could not be placed upon it, is not "available now" within the meaning of the first sentence of Footnote 11. However, what is meant by "available now" is not explained in Footnote 11 or elsewhere. It is to be read in the context that there are other requirements, which should be assumed to be distinct from the requirement of being "available now", though there may be a degree of overlap in their application. This suggests that being available now is not a function of (a) being a suitable location for development now or (b) being achievable with a realistic prospect that housing will be delivered on the site within five years and that development of the site is viable. Given the presence of those additional requirements, I would accept Ms Busch's submission for the Secretary of State: "available now" connotes that, if the site had planning permission now, there would be no other legal or physical impediment integral to the site that would prevent immediate development;… ” • It is common ground that planning permission is not a necessary prerequisite to a site being "deliverable". This must be so because of the second sentence of Footnote 11 and because it would be quite unrealistic and unworkable to suggest that all of the housing land supply for the following five year period will have achieved planning permission at the start of the period; • The parties are agreed that a site which is, for example, occupied by a factory which has not been derequisitioned, or which is contaminated so that housing could not be placed upon it, is not "available now" within the meaning of the first sentence of Footnote 11. However, what is meant by "available now" is not explained in Footnote 11 or elsewhere. It is to be read in the context that there are other requirements, which should be assumed to be distinct from the requirement of being "available now", though there may be a degree of overlap in their application. This suggests that being available now is not a function of (a) being a suitable location for development now or (b) being achievable with a realistic prospect that housing will be delivered on the site within five years and that development of the site is viable. Given the presence of those additional requirements, I would accept Ms Busch's submission for the Secretary of State: "available now" connotes that, if the site had planning permission now, there would be no other legal or physical impediment integral to the site that would prevent immediate development;… ”
“What constitutes a ‘deliverable site’ in the context of housing policy? Deliverable sites for housing could include those that are allocated for housing in the Development Plan and sites with planning permission (outline or full that have not been implemented) unless there is clear evidence that schemes will not be implemented within five years. However, planning permission or allocation in a Development Plan is not a prerequisite for a site being delivered in terms of the five-year supply. Local planning authorities will need to provide robust, up to date evidence to support the deliverability of sites, ensuring that their judgments on deliverability are clearly and transparently set out. If there are no significant constraints (e.g. infrastructure) to overcome such as infrastructure, sites not allocated within a development plan or without planning permission can be considered capable of being delivered within a five-year timeframe. The size of sites will also be an important factor in identifying whether a housing site is deliverable within the first 5 years. Plan makers will need to consider the time it will take to commence development on site and build out rates to ensure a robust five-year housing supply.”
“What factors should be considered when assessing availability? A site is considered available for development, when, on the best information available (confirmed by the call for sites and information from land owners and legal searches where appropriate), there is confidence that there are no legal or ownership problems, such as unresolved multiple ownerships, ransom strips tenancies or operational requirements of landowners. This will often mean that the land is controlled by a developer or landowner who has expressed an intention to develop, or the landowner has expressed an intention to sell. Because persons do not need to have an interest in the land to make planning applications, the existence of a planning permission does not necessarily mean that the site is available. Where potential problems have been identified, then an assessment will need to be made as to how and when they can realistically be overcome. Consideration should also be given to the delivery record of the developers or landowners putting forward sites, and whether the planning background of a site shows a history of unimplemented permissions.”
“13.49. Sites in the PSAD have been subjected to a four-stage assessment which includes deliverability. An example of this can be seen in the discussion of potential sites at Melton at Chapter 3 of Mr Hunt’s PoE. However, although this methodology may support inclusion of a site within the emerging local plan, it does not demonstrate the likelihood of its delivery in the next five years, as indicated by the Council’s own acceptance that some sites should be discounted. 13.50. Turning to the SHLAA, two key assumptions underpin its reliance on emerging local plan allocations in the five year housing land supply figures: that, since few sites require infrastructure to be provided prior to commencement of development, most of the allocations in the emerging local plan can be regarded as being free from significant constraints; and that the Council is committed to affording weight to the emerging local plan when determining planning applications. 13.51. Infrastructure constraints are identified in the emerging local plan (see eg PSSD policy A1). Although the responses to the PSAD have resulted in comments on many of the allocations, the general tenor of these does not indicate a failure to identify constraints. In addition, the Appellant’s scrutiny of these allocations during the course of the inquiry indicated a need for relatively little change in the Council’s assessment of sites which should be discounted (from 373 in ERYC 16 to 419 in ERYC 38a). As such, I consider that the first key assumption has been shown to be reasonable. 13.52. As to the second, a comparison between the information provided in April 2014 and the update to the inquiry three months later provides a useful illustration of the extent to which the Council is standing by its commitment to afford weight to the emerging local plan. The table below shows that the number of sites with planning permission or expected to obtain such permission has risen significantly (by almost 1100 in three months) and the trend for those under consideration is also upward. On that basis, I consider that the second key assumption in the SHLAA is also reasonable. 13.53. Clearly, given the number of sites involved, it may well turn out that not all allocations currently identified as deliverable will in fact be delivered. However I consider that, overall, the Appellant has not shown that this part of the evidence base is lacking in robustness. As a result, the Council’s figure of 11,156 dwellings on sites identified in the emerging local plan should carry substantial weight.”
“13.53. Clearly, given the number of sites involved, it may well turn out that not all allocations currently identified as deliverable will in fact be delivered….” “13.56… However, the assessment of supply is distinct from that for delivery.”
“13.56. Whilst the Council’s supply figure has fluctuated over the period of the inquiry, a fair reading of Mr Hunt’s first proof shows that the discussion of a 12 year supply took place in the context of the weight which could be attached to sites in the emerging local plan (StM16). In a situation where a Local Plan is under preparation, it is not surprising that data will be subject to revision. As such, the fluctuations of themselves should not be seen as indicative of a lack of reliability. It is also suggested that the 15,000 figure should be seen as absurd in comparison with the housing trajectory. However, the assessment of supply is distinct from that for delivery.”
“Prepare a Strategic Housing Market Assessment to assess their full housing needs, working with neighbouring authorities where housing market areas cross administrative boundaries. The Strategic Housing Market Assessment should identify the scale and mix of housing and the range of tenures that the local population is likely to need over the plan period which: -meets household and population projections, taking account of migration and demographic change; -addresses the need for all types of housing, including affordable housing and the needs of different groups in the community (such as, but not limited to, families with children, older people, people with disabilities, service families and people wishing to build their own homes); and - caters for housing demand and the scale of housing supply necessary to meet this demand; • Prepare a Strategic Housing Land Availability Assessment to establish realistic assumptions about the availability, suitability and the likely economic viability of land to meet the identified need for housing over the plan period.” • Prepare a Strategic Housing Land Availability Assessment to establish realistic assumptions about the availability, suitability and the likely economic viability of land to meet the identified need for housing over the plan period.”
“any cross-boundary migration assumptions, particularly where one area decides to assume a lower internal migration figure than the housing market area figures suggest, will need to be agreed with the other relevant local planning authority under the duty to co-operate. Failure to do so will mean that there would be an increase in unmet housing need.”
“13.82. In addition, the specific land identified by the Appellant is that to the south of the appeal site and across the railway line. The offer of funds to improve the accessibility of this land is made to overcome any harm associated with the use of 24ha of land within the appeal site for non-employment purposes (Appeal B(ii)). The area of land to benefit from improved access would be in the region of 142ha, some six times greater than that proposed for use for housing. Even allowing for the fact that some of this land is already in use, the scale and cost of this compensatory measure appears disproportionate to the potential harm it is intended to address. In addition, as Mr Garness’ evidence makes clear, there are several other locations along the East-West multi-modal transport corridor which could be seen as candidates for a key employment site, not least of which would be the proposed extension to Melton West being promoted by Wykeland through the Local Plan process. 13.83. For these reasons, I consider that the offer of funding for a bridge across the railway line would not be a proportionate or reasonable response to any harm to the supply of employment land. However, for completeness, I set out my assessment of the case as made. To do so it is necessary to evaluate the substitute land in terms of its location and deliverability.”
“13.87. The appeal site comprises a substantial proportion of the Melton site, one of only four key employment sites in the East Riding and one of only two identified for general industrial uses. Melton is highly accessible and is available now, capable of responding to any interest arising either directly or, more likely, indirectly as a result of the Siemens investment. It represents a logical choice in relation to the spatial strategy of the emerging local plan. If the appeal site was developed for housing, whether along the lines of Appeal A or Appeal B, the status of Melton as a key employment site would be much diminished so that it would have a significant, detrimental effect on the portfolio of employment land. The likelihood of a lengthy delay in delivery of the suggested bridge over the railway line and the characteristics of the land itself mean that it would not immediately represent a comparable substitute for the land at Melton. Although there is potential for other land to come forward, this would have to be on an ad hoc basis rather than as part of a plan-led approach. As such, the proposed developments would be likely to cause substantial harm to wider economic development objectives, with some scope for more limited harm to the aim of assisting the Humber to become established as a centre for renewable energy.”
“14.10. … Where employment development is the predominant use, priority can be given to the needs of prospective developers for similar uses. Under the appeal proposals, the Melton industrial area would take on a mixed use character. In such circumstances, the needs of prospective industrial developers would become only one consideration amongst others, including the protection of residential amenity. In this respect therefore, I do not agree that the harm would be materially less in the case of Appeal B. In both instances, this harm should carry substantial weight.”