“The proposal follows the recommendations of a detailed Planning Brief for the site and although it has been the subject of strong objection from some quarters it has attracted a satisfactory response from English Heritage, an enthusiastic response from CABE, and would deliver the redevelopment and regeneration of one of Britain’s ‘Worst Wasted Spaces’ (CABE). The proposal has also met the technical requirements of specialist consultees such as the Environment Agency and Surrey County Council as Highways and Transportation Authority. The application has been considered against all the relevant national and local policies as well as the representations and consultation replies, and in all the circumstances it is concluded that on balance there are insufficient overriding reasons to refuse planning permission in the public interest.”
“In considering whether to grant planning permission for development which affects a listed building or its setting, the local planning authority or, as the case may be, the Secretary of State shall have special regard to the desirability of preserving the building or its setting or any features of special architectural or historic interest which it possesses.”
“There is no dispute that the intention of section 277(8) is that planning decisions in respect of development proposed to be carried out in a conservation area must give a high priority to the objective of preserving or enhancing the character or appearance of the area. If any proposed development would conflict with that objective, there will be a strong presumption against the grant of planning permission, though, no doubt in exceptional cases the presumption may be overridden in favour of development which is desirable on the ground of some other public interest. But if a development would not conflict with that objective, the special attention required to be paid to that objective will no longer stand in its way and the development will be permitted or refused in the application of ordinary planning criteria.”
“The setting is often an essential part of the building’s character, especially if a garden or grounds have been laid out to complement its design or function. Also, the economic viability as well as the character of historic buildings may suffer and they can be robbed of much of their interest, and of the contribution they make to townscape or the countryside, if they become isolated from their surroundings, eg. by new traffic routes, car parks, or other development.”
“The setting of individual listed buildings very often owes its character to the harmony produced by a particular grouping of buildings (not necessarily all of great individual merit) and to the quality of the spaces created between them. Such areas require careful appraisal when proposals for development are under consideration, even if the redevelopment would only replace a building. Where a listed building forms an important visual element in a street, it would probably be right to regard any development in the street as being within the setting of the building. A proposed high or bulky building might also affect the setting of a listed building some distance away, or alter views of a historic skyline. In some cases, setting can only be defined by a historical assessment of a building’s surroundings.”
“1. To promote a comprehensive development of the site, to include a comprehensive solution to access. 2. To enhance the site’s role as a transport interchange. 3. To ensure that the development enhances the East Molesey Conservation Area and provides a scheme of the highest architectural quality which respects its location opposite Hampton Court Palace and adjacent to Hampton Court bridge. 4. To ensure that development maximises the opportunity to improve the frontage of the River Thames and to encourage a range of uses which promote the enjoyment of the River. 5. To encourage environmental improvement of the site and the immediately adjacent highway. 6. To enhance the site as a gateway to the borough, particularly for tourists visiting Hampton Court. 7. To encourage a mix of uses appropriate to the site’s location.”
“However, as Plan 5 shows, the Jolly Boatman site is highly visible and therefore particular regard will be paid to the Jolly Boatman site and that part of the site fronting the Cigarette Island Park, given its location opposite Hampton Court Palace, adjacent to the Grade II Lutyens Listed Bridge, on the River Thames and within the East Molesey Conservation Area. Buildings of the highest quality of design will be required for these prominent locations and the applicants are encouraged to employ the services of architects who have a track record of designing excellent buildings in historic settings.”
“The most important building frontage is along the Thames, where the site is particularly visually prominent when viewed from Hampton Court Bridge and Palace.”
“…few would be likely to question the desirability of a restored station building in an open parkland setting as envisioned by the Royal Palace [sic] in the long term. However, the proposal is not supported by any convincing evidence that its achievement would be financially feasible, and its long term pursuit … would be contrary to the [Town Planning] Committee’s previously expressed desire to promote an urgent and comprehensive development of the site after many years of neglect.”
“In particular, it would help to ensure that all new development within the sites were of a high standard of design and in harmony with surrounding buildings, whilst protecting the Park and its trees, together with the setting of Hampton Court Palace, the River Thames and River Mole.”
“3.2 The appearance of the Surrey bank is a vital part of the arcadian setting of the Palace. Walking along Barge Walk, ever conscious of a backdrop of magnificent buildings and formal grounds, the observer sees the southern shore beyond the shining Thames. The ambience sought is an illusion to trees and meadow stretching away from the river. This same ambience is perceived in inviting glimpses from the West Front forecourt, the southern end of the Privy Garden or looking out from several magnificent windows within the Palace itself. 3.6 The Palace and its setting should also be enjoyed when walking from Hampton Court Station towards the bridge. To this end views of the Palace across the river need to be opened up from the Surrey bank, framed by foreground and middle ground group of trees.”
“Substantial development on the Jolly Boatman and station sites, as promoted by the development brief, would effectively preclude the restoration of the historic landscape character of the area and further erode the arcadian setting of Hampton Court Palace in perpetuity.”
“APPROACH FROM EAST MOLESEY ACROSS HAMPTON COURT BRIDGE Assessment This is perhaps the most important approach today, given the high number of visitors who arrive by train at Hampton Court Station and walk across the bridge to the Palace from East Molesey. It also has the greatest potential for opening tree-framed views across the River Thames to the Tudor Palace, that would help to orientate visitors and create a positive first impression that might better meet their expectations when arriving at an internationally important historic palace. However, the dereliction of the prominent Jolly Boatman site and the air of neglect that pervades the Hampton Court train station currently dominate the character of the approach to the Palace from East Molesey. The busy flow of traffic on the intimidating and imposing A309 further detracts from the appearance of this area and from first impressions of East Molesey in particular. Views across to the Palace from Hampton Court Bridge are blocked by the avenue of Norway Maples within the West Front of the Palace.”
“Hampton Court Palace (Scheduled Monument and Grade I) The proposed development may be seen from certain viewpoints within the palace grounds. There will be an indirect effect on the setting of the palace. The effect on the setting of the palace is considered to be minimal as generally the development would be largely obscured by existing and proposed planting on Cigarette Island and the site itself. The point at which the headland development will come into fuller view is as one becomes aware of East Molesey and the high volumes of traffic on the road bridge. Thus the development will be associated with that urban experience, not the leafier stretches around the Privy Garden. The setting of the Palace consists of the River Thames, Hampton Court Park, the bridge and the settlements to the west and on the Surrey bank. The proposed development would not therefore introduce a new urban character into the setting of the Palace. The views assessment of agreed vistas presented later in this section also indicate that the effect on the views from Hampton Court Palace is minimal change only, and increasing nearer the bridge and with the main entrance area. The proposed improvements to the station will provide a much enhanced environment for users, many of whom will be visiting the Palace. Hampton Court Bridge (Grade II) The Proposed development will have an indirect effect on the setting of the listed bridge. A new public space, Riverfront Square, will be created in front of the new hotel building and adjacent to the bridge. This will be an attractive, well designed area that will enhance the bridge’s setting and provide improved viewing places for the bridge and the surrounding riverside environs”
“…keen to encourage proposals which will improve significantly the currently extremely poor visitor experience of those arriving at Hampton Court Station, the currently semi derelict public realm between the Station, the River Thames and Cigarette Island Park, the setting of the grade II listed Hampton Court Bridge and preserve the existing semi-rural nature of views from Hampton Court Palace across the River to the Jolly Boatman site. Particular attention during these discussions has been given to the setting of the Palace, a scheduled ancient monument and its grade I Registered Gardens and Parkland, all of outstanding national and international importance.”
“…less harmful in its impact than initially feared, but English Heritage continues to have significant and fundamental concerns regarding a number of aspects of the scheme. The hotel building proposed between the Station and the River is in terms of its height, scale, bulk and massing entirely inappropriate to this highly sensitive location. The introduction of such a substantially scaled structure onto a site which is currently undeveloped will have a major, adverse impact upon the established character and appearance on the setting of Cigarette Island Park, the Station and Hampton Court Bride and in cross river views. This harm is particularly exacerbated by the detailed design of the building which is entirely inappropriate to the conservation areas and the wider setting in which it sits”
“that if the principle of such development is accepted in this location, the outstanding significance of Hampton Court Palace and its environ will be preserved and protected”
“English Heritage does not wish to raise any objections to the proposed residential and commercial development to either side of the railway tracks and welcomes the erection of a new Royal Star and Garter Home, which will maintain the historic links of the Royal British Legion with this part of south west London. Also to be welcomed are much needed works of improvement and restoration to Hampton Court Station and the withdrawal of the previously proposed works of hard landscaping between Hampton Court Bridge and Cigarette Island Park, which we considered to be of a scale and design inappropriate to this stretch of the Thames. English Heritage has long felt that the objective of enhancing the setting of the Palace, the Station and the appearance of this part of East Molesey would best be achieved by creating a landscaped public park or space between the Station and the Thames, containing a number of modest and sympathetically designed structures to provide facilities for visitors and residents alike. We continue to feel, as a matter of principle, that your Council should consider this approach very carefully.”
“English Heritage has been working closely with Gladedale Group Ltd and Francis Terry in the evolution of this redesigned building. We recognise that the floor space of the latest, proposed hotel building remains largely the same as the building we commented upon in 2007 but we feel that its design, appearance and architectural vocabulary all respond in a significantly more sympathetic fashion to this highly sensitive location and to the prevailing character of the place. The vernacular adopted harmonises with the varied but domestic scale of the architecture along this stretch of the Thames and, if built would have an infinitely less damaging impact upon views to and from the Palace and the environs of the Jolly Boatman site than the original proposal. English Heritage considers that the latest proposals for the hotel building respect this advice and are based on a proper understanding of the significance of the place. The design for the new hotel is appropriate to its immediate and wider setting on both sites of the Thames Should your Council decide to approve the proposal which includes the hotel designed by Quinlan and Francis Terry Architects it is essential that the high quality of their design for the hotel building and associated structures is matched by an equally high quality of detailing and execution. There needs to be a firm commitment from the Applicants to retain the service of these architects as the scheme develops.”
“English Heritage wishes to secure a scheme which will complement the setting of significant heritage assets identified above and consider that if development on the site between the Station and Thames is acceptable as a matter of principle, the designs submitted by Quinlan and Francis Terry Architects for a new hotel building, in conjunction with the designs submitted by Allies and Morrison for the residential and commercial development represent the most appropriate response to the site.”
“An adopted Planning Brief is a material consideration in the assessment of any subsequent planning application. The normal assumption is that any application that follows the specifications in the Brief would be approved, unless there had been a material change in the planning circumstances that rendered the Brief outdated or contrary to latest adopted policies. However, an adopted Brief does not prevent the grant of permission for a development that departs from it, so long as that alternative development accords with adopted policies in the current development plan.”
“Confirms that there is no objection to the residential/commercial development either side of the railway tracks and welcomes the Royal Star & Garter home. Continues to believe that a park between the station and the river, with only modest structures would achieve the most enhancement to the Palace and the area. However, the design and appearance of the Quinlan and Francis Terry hotel building is more sympathetic to the character of the area and less damaging to the impact on views to and from the Palace. The latest proposal respects English Heritage guidance and is appropriate to its immediate and wider setting. Suggests that the Allies & Morrison hotel scheme (2007/2970) be withdrawn and states that a call-in to the Secretary of State will be requested in the event that it is recommended for permission.”
“Consider that the Jolly Boatman site should be landscaped to reinforce and extend the rural parkland character of the River Thames and the site should not be redeveloped as it is considered that any development on the site would have a detrimental effect on the immediate setting of the Palace and the historical adjoining character of the area. The hotel building would dominate the river frontage due to its orientation, bulk, external materials and the urban style landscaping and would have a detrimental effect upon the historic setting of the Palace as it would result in a proposal much larger than the existing buildings. The buildings on the railway site are considered to be a high density, monolithic scheme that will appear as a continuous wall when viewed from Hampton Court Palace. It is considered that the views from and to the Palace are significant and should be protected and the development by virtue of its scale, massing and height would have a significant impact upon the views of the Palace from the station and surrounding areas. The scale of the proposals also fails to maintain or enhance the unique character of the river and the terrace will further fail to contribute to the riverside ambience or rural character of the area.”
“One of the reasons why the sites have remained undeveloped in over 20 years has been the unusual costs associated with a comprehensive development.”
“In policy terms, there is no reason why, in principle, a hotel would have an adverse impact on the character and amenity of the area, including taking account of its riverfront setting and the proximity to Hampton Court Palace. As such, the provision of a hotel in this location would not conflict with local or national policy. However, the hotel must be of a suitable design and scale to accord with the very special characteristics and constraints of the site. Both proposals include a hotel of the same height and scale but with different architectural treatment of the elevations. Each will be considered in turn.”
“The visual improvement of the site would indeed have a benefit but the design of the hotel must take account of the character of the area, which in this case includes the Conservation Area, the riverside frontage and the setting of Hampton Court Palace.”
“must be reached in light of this very strong objection from English Heritage, in its capacity as the Government’s statutory adviser on the historic environment.”
“Accordingly, it is considered that the appearance of the ‘Boathouse’ scheme for the hotel would not protect and enhance the historic character of the area, including the views from Hampton Court Palace.”
“In light of the comments from both CABE and English Heritage, as the Government’s advisers on design and heritage issues, the conclusion must be that the ‘Classical’ scheme for the hotel meets the policy criteria for achieving good design that respects its historic setting. There remains objection to this scheme from other interested parties and consultees, such as Historic Royal Palaces, the Hampton Court Rescue Campaign and the East Molesey CAAC, together with many letters from local residents. Yet there are also comments from the Council’s own conservation advisers and the Strategic section of Surrey County Council, who commend the high quality design of the ‘Classical’ hotel and conclude that less visual intrusion would result.”
“This is a highly sensitive site, which because of its location opposite Hampton Court Palace has more than local significance. But it is also important to the community of East Molesey.”
“There has been a very frustrating period in excess of 29 years during which it has been run-down. No successful scheme for development and improvement has emerged that has been good enough to achieve both planning permission and viability.”
“Nevertheless, after considering representations from bodies such as English Heritage, CABE and the Thames Landscape Strategy as well as Historic Royal Palaces, the Council confirmed in the 1999 Planning Brief that it was satisfied that a 3 storey (plus roof) landmark building could be erected on the Jolly Boatman site in a forward position, so long as the architecture was of the highest quality. A further complication has been the unusual development costs associated with the site. This has been one of the longstanding impediments to development, and even before the ‘credit crunch’ it is evident that the scheme contained in the current application is only of limited viability. It is understood that at an early stage the applicant considered the possibility of not adding any building on the Jolly Boatman part of the site but unless significantly higher buildings had been built to the rear, the scheme would not have been viable.”
“ Much weight must be given to the advice of the main national and county-level consultees: CABE, English Heritage, the Environment Agency and Surrey County Council’s Highway and Transportation Section. These have all examined the schemes independently from the Planning Brief. With the exception of English Heritage and the Boathouse scheme (see below), all these consultees are supportive of the applications. CABE in particular is enthusiastic, commending all aspects of the schemes – the design, mix, quantum, distribution of massing, high quality and public realm improvements. This is an unusually positive endorsement of a development of this type from such a body and obviously stands in direct contrast to the objections from Historic Royal Palaces – loss of opportunity for landscaped riverside, size, loss of views, harmful to setting of the Palace, traffic etc. English Heritage advice is more considered and reflects the fine balance that ultimately exists between those with strong views in favour and those against. They have considered the likely impact of the development upon views to and from Hampton Court Palace (including its gardens and parks), the setting of the listed Hampton Court Bridge, the banks of the River Thames and impact upon the character of East Molesey. They confirm they have no objection to the residential/commercial redevelopment either side of the railway tracks and welcome the Royal Star & Garter home. They acknowledge the aspiration to create a park between the station and river, and comment that if this could be achieved it would deliver the most enhancement of the Palace and the areas. But they also acknowledge that the design and appearance of the ‘Classical’ hotel building has taken account of their advice and is appropriate in its immediate and wider setting’. Conversely they still feel that the original ‘Boathouse’ design for the hotel would have an adverse impact upon the character and appearance of Cigarette Island Park, the station and Hampton Court Bridge as well as cross river views. In all these circumstances, and on balance, a recommendation is made to Grant permission for the revised scheme (2008/1600) – the ‘Classical’ Hotel building.”
“The aim of the Sequential Test is to steer new development to areas at the lowest probability of flooding. The applicants argue that the development is driven by improvements to the railway station and so no alternative sites within Flood Zones 1 and 2 are suitable. There is a Planning Brief that encourages the comprehensive development of the site, which is required in order to provide visual enhancement and improvements to access. The proposed development is specific to the requirements of the application site and inextricably linked to the railway station. PPS25 states that if development is needed for wider sustainable development reasons in flood risk areas, it must satisfy the three criteria of the Exception Test. The criteria required that (a) it is demonstrated that the development provides wider benefits to the community that outweigh flood risk, (b) the development is on developable or previously developed land, and (c) the Flood Risk assessment demonstrates that the development will be safe without increasing flood risk elsewhere and, where possible, reducing flood risk overall. In assessing Criterion (a), the Planning Brief is, again, relevant. The Council has prepared this document in order to see the site developed in a comprehensive manner to meet the conservation and transportation needs of the area. At present, it is a ‘wasted space’ (CABE) and does little to enhance the very special nature of its surroundings. It is considered that the development would provide wider sustainability benefit to the community, economy, tourism and the area, in view of the advantages in visual terms and by meeting the aims of the Planning Brief, thus it meets the criterion.”
“(1) When the local planning authority give notice of a decision or determination on an application for planning permission or for approval of reserved matters and – a) planning permission is granted, the notice shall include a summary of their reasons for the grant and a summary of the policies and proposals in the development plan which are relevant to the decision;”