"The differences between the building approved and that built formed a large part of the cases put by the parties and interested persons. In my opinion the differences between the two buildings in particular the locations of the two buildings, their heights and the level of the land on which they are/would be built (although I accept that the appellant does not agree that the permitted building would be built at a lower level) are such that I give little weight to the approval save for [the] fact that it established the principle of a three-car garage with storage above on the appeal site."
"26 The fall-back position is that the appellant could build the building approved in November 2007. Whatever the perceived drawbacks of that building may be as submitted by the appellant, it has been approved by the council (subject to conditions) and therefore it is acceptable in terms of, among other things, the Conservation Area and the setting of the Listed Building."
"26 In particular I note that the approved plan shows the approved building would be at the same ground level as the gates leading to the rear of the site and it would therefore be at a lower level and also that it would have less height and therefore less volume than the building that is the subject of these appeals."
"26 In view of the explanations given by the appellant for the differences between the approved building and the building as built, which include the need for the windows in the rear elevation to comply with Building Regulations regarding escape from fire and the width of the garage doors being reduced because of the need to increase the width of the piers to support the arches, it appears to me that it may not be possible to build the garage as approved; but these are matters for the future should the appellant decide to proceed with building the garage."