“101. The aim of the Sequential Test is to steer new development to areas with the lowest probability of flooding. Development should not be allocated or permitted if there are reasonably available sites appropriate for the proposed development in areas with a lower probability of flooding. The Strategic Flood Risk Assessment will provide a basis for applying this test. A sequential approach should be used in areas known to be at risk from any form of flooding.”
“162. The aim of the sequential test is to steer new development to areas with the lowest risk of flooding from any source. Development should not be allocated or permitted if there are reasonably available sites appropriate for the proposed development in areas with a lower risk of flooding. The strategic flood risk assessment will provide a basis for applying this test. The sequential approach should be used in areas known to be at risk now or in the future from any form of flooding.”
“What is a “reasonably available” site? ‘Reasonably available sites’ are those in a suitable location for the type of development with a reasonable prospect that the site is available to be developed at the point in time envisaged for the development. These could include a series of smaller sites and/or part of a larger site if these would be capable of accommodating the proposed development. Such lower-risk sites do not need to be owned by the applicant to be considered ‘reasonably available’. The absence of a 5-year land supply is not a relevant consideration for the sequential test for individual applications.”
“After considering the comments received in relation to reasonably available sites, we will shortly be updating planning practice guidance to clarify the definition of reasonably available sites that should be considered as part of the sequential test.”
“… Development in zones 2 and 3 of the Environment Agency Flood Map will only be permitted where it is demonstrated that it complies with the sequential test set out in the National Planning Policy Framework and associated technical guidance and, where applicable, the Exception Test, unless it is: • development of a category for which National Planning Policy Framework and associated technical guidance makes specific alternative provision; or • development of the same or a similar character and scale as that for which the site is allocated, subject to demonstrating that it will be safe from flooding, without increasing flood risk elsewhere, and, where possible, will reduce flood risk overall. For the purposes of the Sequential Test: … • development of a category for which National Planning Policy Framework and associated technical guidance makes specific alternative provision; or • development of the same or a similar character and scale as that for which the site is allocated, subject to demonstrating that it will be safe from flooding, without increasing flood risk elsewhere, and, where possible, will reduce flood risk overall. … 2. A site is considered to be ‘reasonably available’ if all of the following criteria are met: • The site is within the agreed area of search. • The site can accommodate the requirements of the proposed development. • The site is either: a) owned by the applicant; b) for sale at a fair market value; or c) is publicly-owned land that has been formally declared to be surplus and available for purchase by private treaty. Sites are excluded where they have a valid planning permission for development of a similar character and scale and which is likely to be implemented.”
“22. Taking these factors together, I conclude that there is insufficient evidence to demonstrate that any of the alternative sites proposed as reasonable alternatives by the Council meet all of the bulleted criteria set out in the second section of Policy CS3.”
“23. Moving on to consideration of the proposal against national planning policy, the second section of Policy CS3 is now inconsistent with the Framework. Although the wording of national planning policy on flood risk in the Framework is largely the same as it was when Policy CS3 was adopted, the interpretation of it has been clarified by more recent guidance contained in the PPG. 24. In the PPG, reasonably available sites are defined as those in a suitable location for the type of development with a reasonable prospect that the site is available to be developed at the point in time envisaged for the development. 25. The PPG says that these could include a series of smaller sites and/or part of a larger site if these would be capable of accommodating the proposed development. There is nothing in the PPG that requires smaller sites to be adjacent to one another, as suggested by the appellant. A series of separate small residential sites would still provide suitable alternative land for equivalent development at a lower risk of flooding. 26. The PPG also says that such lower-risk sites do not need to be owned by the applicant to be considered reasonably available. Reasonably available sites can include ones that have been identified by the planning authority in site allocations or land availability assessments. There are no exclusions in the PPG relating to sites with planning permission or that publicly owned land must be formally declared to be surplus. 27. Paragraph 219 of the Framework states that due weight should be given to development plan policies, according to their degree of consistency with the Framework. In this case, because of the inconsistency between the documents as to what is meant by reasonably available, I give lesser weight to the second section of Policy CS3 than I do to the newer and more up to date Framework as interpreted by the PPG.”
“36. Drawing these matters together, I consider that for the purposes of applying the sequential test in this appeal, a reasonably available alternative site is one whose location lies within the district of North Somerset, can accommodate residential development, and would be available for development at the point in time envisaged for the proposal as interpreted above. The alternative sites could include a series of smaller sites so long as collectively they are capable of accommodating the proposed development. There is no need for such smaller sites to be contiguous. Sites do not need to be owned by the applicant, nor are they excluded because of an extant planning permission or resolution to grant. So long as a site is available to be developed there is no need for further evidence that they are for sale or, in the case of publicly owned land, declared to be surplus and available for purchase by private treaty. 37. Applying those criteria to the alternative sites put forward by the Council, I find that many fall within the meaning of reasonably available in the Framework, as set out in the PPG. 38. Even if a more restrictive definition of the type of development were to be used, taken to mean residential development of a suburban nature, and the availability of sites for development was taken to be now, in the sense that they either have extant planning permission (or a resolution to grant) for residential development in the current development plan with delivery expected at least in part by 2025, then there are still many alternative sites that would meet the Framework definition of reasonably available. 39. Other than in specific instances, individual sites were not discussed in detail at the inquiry as both main parties accepted that the question of whether a site was deemed to be reasonably available depended largely on my conclusions on the differences in interpretation of the wording of the PPG, and the respective weight given between Policy CS3 on the one hand, and the Framework as informed by the PPG on the other. 40. I conclude that the proposed development fails the sequential test as set out in the Framework because there are reasonably available sites for residential development appropriate to the proposed development on land with a lower risk of flooding than the appeal site. 41. The first part of Policy CS3 requires that development will only be permitted where it is demonstrated that it complies with the sequential test set out in the Framework. As I have concluded that the Framework’s sequential test would not be complied with, it follows that the proposed development is in conflict with the first part of Policy CS3. Other than for the definition of the area of search being North Somerset-wide, I consider the remainder of the second part of Policy CS3 to be out-of-date because it is inconsistent with the Framework. I therefore conclude that the proposed development conflicts with Policy CS3 overall. As Policy CS3 was agreed as being the most important policy in determining this appeal, I conclude that the proposal also conflicts with the development plan when taken as a whole.”
“55. Set against those benefits is the harm that would arise if the development were to flood. Evidence provided by the Council indicates that tidal flood waters could be deep. Such flooding would enter dwellings and surcharge drains. Standing water would be likely to be present for some time before water levels returned to normal. Such flooding would cause extensive damage both to buildings and their contents, requiring significant repair or replacement. There may also be adverse health and environmental impacts. The risk of this harm occurring weighs significantly against the proposal. 56. Irrespective of the degree of risk of flooding occurring or measures that could be taken to make the development resilient to flooding during its lifetime, the Framework is clear that development should not be permitted if there are reasonably available sites appropriate for the proposed development in areas with a lower risk of flooding. I have found that there are such sequentially preferable sites available. This weighs heavily against the proposal. … 59. Although the benefits of providing housing, including affordable housing, in an area with an acknowledged shortfall of housing land would be significant, I conclude that the failure to meet the sequential test and the significant harm that would arise if the development were to flood outweigh those benefits and the other advantages outlined above.”
“141. I see no possible legal error in the Inspector’s conclusion that the proposal conflicted with the first part of policy CS3 because it conflicted with the sequential test in the NPPF read together with the PPG. It was not suggested by Mead that policy CS3 should be interpreted as referring solely to the 2012 version of the NPPF and ignoring any alterations to that document. So if the NPPF had been amended by including the text contained in para. [7-028] of the PPG, Mead could have no legal complaint. I have explained that there is no legal principle which prevents national policy in the NPPF being altered by a WMS and/or PPG. In any event, para. [7-028] of the PPG is consistent with the open-textured language of para.162 of the NPPF properly understood. The former has merely clarified the latter. The Inspector correctly treated the PPG as having elucidated the NPPF. 142. For essentially the same reasons, the Inspector did not commit any error of law when he concluded that the criteria in the second section of policy CS3 are out of date because they are inconsistent with the NPPF read together with the PPG (DL 23 to DL 27 and DL 41). 143. [Counsel] submits that the Inspector erred because in treating the PPG as interpreting the NPPF (or defining “reasonably available” sites) he was applying the PPG as a “binding code[”.] I have already explained why that argument is unsustainable … ”
“a series of smaller sites and/or part of a larger site if these would be capable of accommodating the proposed development”