“for regulating the development or use of any land under the control of the applicant (whether or not it is land in respect of which the application was made) or requiring the carrying out of works on any such land, so far as appears to the local planning authority to be expedient for the purposes of or in connection with the development authorised by the permission”
“73 Determination of applications to develop land without compliance with conditions previously attached (1) This section applies, subject to subsection (4), to applications for planning permission for the development of land without complying with conditions subject to which a previous planning permission was granted. (2) On such an application the local planning authority shall consider only the question of the conditions subject to which planning permission should be granted, and— (a) if they decide that planning permission should be granted subject to conditions differing from those subject to which the previous permission was granted, or that it should be granted unconditionally, they shall grant planning permission accordingly, and (b) if they decide that planning permission should be granted subject to the same conditions as those subject to which the previous permission was granted, they shall refuse the application.” (a) if they decide that planning permission should be granted subject to conditions differing from those subject to which the previous permission was granted, or that it should be granted unconditionally, they shall grant planning permission accordingly, and (b) if they decide that planning permission should be granted subject to the same conditions as those subject to which the previous permission was granted, they shall refuse the application.”
“Installation of a ground mounted solar park to include ancillary equipment, inverters, substation, perimeter fencing, CCTV cameras, access tracks and associated landscaping Woodington Farm, Woodington Road, East Wellow”
“Prior to the commencement of the development hereby permitted, full details of the proposed siting, external materials, external lighting and mean of access/enclosure for the sub-station, as shown on drawing DIS000, shall be submitted to and approved in writing by the Local Planning Authority. Implementation shall be in accordance with the approved details.”
“The primary purpose of the s 73 permission under challenge (the 2022 Permission) was to remove any physical inconsistency between the solar park permitted in 2017 and the 2021 Permission. It did so by removing development from the area covered by the 2021 Permission; by amending the approved plans under condition 2 so they did not include a 33kV substation; and by omitting a condition which had originally been attached requiring details (including siting) of the substation to be provided. The intended effect of the 2022 Permission was to allow the solar park and the 2021 substation to be built out, and operate, in tandem.”
“the planning permission is unclear and Wednesbury unreasonable on its face as it does not grant planning permission for the excavation of the cabling trench route to the south.”
“In my judgment, there is nothing unusual or unlawful about the defendant’s way of proceeding or its grant of planning permission. The wording of the permission is clear, but it has to be read in conjunction with the conditions attached to it. Condition 20 expressly removes the southern cabling route from the main site to Aberbeeg. There is nothing ambiguous in the language used. It is clear and not confusing. Using conventional principles of construing a planning permission a planning consent was granted for the photovoltaic park, as applied for, but without the southern track which was removed from the planning permission. The reason why that was done is clearly set out in the reason for condition 20 so that a reasonable reader is left in no doubt as to what has happened and why.”
“A condition may have the effect of modifying the development proposed by the application provided that it does not constitute a fundamental alteration in the proposal.”
“Faced with the imposition of such a condition there can be little doubt that Marks & Spencer would have replied to the local planning authority: “Whilst you have purported to grant planning permission for one variety store the condition negates the effect of that permission. You may not lawfully grant planning permission with one hand and effectively refuse planning permission for that development with the other by imposing such an inconsistent condition.”
“Whatever the planning merits of this new proposal, which can, of course, be incorporated into a new “full” application, I am satisfied that the council had no power under s.73 to vary the conditions in the manner set out above. The variation has the effect that the “operative” part of the new planning permission gives permission for one variety superstore on the one hand, but the new planning permission by the revised conditions takes away that consent with the other.”
“Thus the variation had the effect that the operative part of the new planning permission gave their permission for one variety superstore but the new planning permission by the revised conditions would take away that consent. 14. Thus, Arrowcroft (supra) in my judgment does no more than make the clear point that it is not open to the council to vary conditions if the variation means that the grant (and one has therefore to look at the precise terms of grant) are themselves varied.”
“The question is one of statutory interpretation. Section 73(1) is on its face limited to permission for the development of land “without complying with conditions” subject to which a previous planning permission has been granted. In other words the purpose of such an application is to avoid committing a breach of planning control of the second type referred to in s.171A. As Circular 19/86 explained, its purpose is to give the developer “relief” against one or more conditions. On receipt of such an application s.73(2) says that the planning authority must “consider only the question of conditions”
“If the inspector had left the description of the permitted development intact, there would in my judgment have been a conflict between what was permitted (a 100 metre turbine) and what the new condition required (a 125 metre turbine). A condition altering the nature of what was permitted would have been unlawful. That, no doubt, was why the inspector changed the description of the permitted development. But in my judgment that change was outside the power conferred by section 73 .”