“And whereas the sport of yachting, cruising and boating is expanding and is likely to continue to expand around the south east of England and it would be of public and local advantage to increase the existing facilities therefore at Brighton: And whereas the county borough of Brighton and its environs constitute an important holiday and residential centre and it would be of public and local advantage to expand the existing facilities for the accommodation and enjoyment of tourists and visitors and of residents on the sea front in the said county borough: And whereas it is expedient that the Company should be authorised to construct the marina and the recreational, residential and other facilities and the road and harbour works described in this Act and to reclaim land from the sea, as by this Act provided:”
“5 (1) Subject to the provisions of this Act the Company may make and maintain in the lines and situations and upon the lands delineated on the deposited plans and described in the deposited book of reference, and according to the levels shown on the deposited sections the following works, that is to say:-…”
“Work No. 6 A pier or breakwater commencing at a point 390 yards measured in an east-south-easterly direction from the commencement of Work No 1 and terminating at a point 220 yards measured in a southerly direction from the point of commencement; Work No. 7 A reclamation embankment commencing by a junction with Work No. 1 at a point 195 yards measured in a southerly direction from the commencement of that work, extending in an easterly direction and terminating by a junction with Work No. 6 at a point 30 yards measured in a southerly direction from the commencement of that work.”
“(2) The Company may within the limits of deviation for the said works extend, enlarge, alter, replace or relay the same. (3) The Company may by means of Works Nos. 1, 3, 7 and 8 and of that part of Work No. 6 which extends from the termination of Work No. 7 to the commencement of Work No. 8, enclose, in and reclaim from the foreshore and bed of the sea so much of the foreshore and bed of the sea as lies between Works No. 1 and 3 and is situate within the limit of deviation of Works Nos. 7 and 8 and landward of those works.”
“(1) If the works authorised by section 5 (Power to construct works) of this Act are not completed before1st October 1979 , then on that day the powers by this Act granted to the Company for making and completing those works shall cease, except as to so much thereof as is then completed. (2) On the application of the Company the Minister may by order extend the period referred to in subsection (1) of this section. (3) An order, under subsection (2), of this section shall be subject to special parliamentary procedure.”
“(1) A tidal work shall not be constructed, altered, extended, enlarged, replaced or relaid except in accordance with plans and sections approved by the Board of Trade and subject to any conditions and restriction imposed by the Board before the work is begun.”
“(1) Subject to the provisions of this Act the Company may lay out and develop any lands to which this section applies (or any part of Works Nos. 1 to 9 inclusive) by the erection thereon of buildings and other structures and works, including without prejudice to the generality of the foregoing, car parks (either over or underground), filling stations, hotels, restaurants, club premises, offices, theatres, cinemas, casinos, dance halls, ice rinks, playgrounds, boatyards, bowling alleys, shops, houses, flat and other residential accommodation and in connection with such development may construct, sewer, pave, flag, channel and kerb streets, bridges, and ways: Provided that any development authorised by this section shall not by virtue only of this section be deemed for the purposes of the Town and Country Planning General Development Orders, 1963 to 1965 and any enactment amending or replacing the same, to be carried out in pursuance of an Act which designated specifically both the nature of the development and the land upon which it may be carried out. (2) The lands to which this section applies are those parts of the foreshore, the bed of the sea and other lands which lie between Works 1 and 3 and are situate within the limits of deviation of Works 7 and 8 and landward of those works (but excluding any part of Undercliff Walk).”
“The Company shall not construct or erect, to the south of the cliff face, any work, building or structure to a greater height than the height, at the time of such construction or erection, of that part of the cliff face which lies immediately to the north thereof.”
“…[T]he existing pier is being extended so as to produce a platform on which buildings F1 and F2 will eventually be located. Within the extended pier will be located the underground car park. The extended pier will continue to serve at all times existing the breakwater function. Phase 1….comprises an extended pier (in which will be located an underground car park) on which will be located Buildings F1 and F2 which will accommodate one hundred and ninety two residential units, of which twenty will be affordable homes, with food and drink units at ground floor level. Whilst it will replicate the important function of the pre-existing pier as the western breakwater, members of the public will be able to walk along the improved landscape pier, which will be an animated place from morning to late evening as a result of the residential unit occupiers accessing their buildings from the pier, and due to the ground floor food and drink units within Buildings F1 and F2. These will have good views of the waterfront and the boating berths within the marina. A public amenity space and the yacht club will also be located within Building F2, and of course the new RNLI boathouse will be accessed at the end of the pier.”
“As can be seen from the drawings …. the Phase 1 Development will be fully connected to, and reliant upon, the existing pier and quay for support. The access ramp is built over and supported by the quay. In particular: (a) it comprises a three sided extension connected to and built over the existing West Quay forming the underground car park; (b) the podium structure and buildings above the car park are connected to and supported by the existing West Quay; and (c) the only entrance to the new buildings are over and through the existing quay wall. Upon completion, the Phase 1 Development will provide all of the facilities normally associated with a quay or pier in terms of a landing place for boats, leisure activity and residential amenity. The works are clearly an extension of the pre-existing pier.”