“171A.(1) For the purposes of this Act – (a) carrying out development without the required planning permission; or (b) failing to comply with any condition or limitation subject to which planning permission has been granted, constitutes a breach of planning control. 171B.(1) Where there has been a breach of planning control consisting in the carrying out without planning permission of building, engineering, mining or other operations in, on, over or under land, no enforcement action may be taken after the end of the period of four years beginning with the date on which the operations were substantially completed. (2) Where there has been a breach of planning control consisting in the change of use of any building to use as a single dwellinghouse, no enforcement action may be taken after the end of the period of four years beginning with the date of the breach. (3) In the case of any other breach of planning control, no enforcement action may be taken after the end of the period of ten years beginning with the date of the breach.”
“I am bound to say that seems to me a conclusion which accords with not only the merits of this case but prevents a particular sort of fraud being perpetrated because otherwise Mr Beesley would have got away with a plot to breach the planning laws and to obtain a dwelling house in breach of the Green Belt policies and a development that he would never have been able to achieve if he had gone about things in an honest fashion.”
“In four specific cases, there is immunity four years after the breach (all operations; breaches of conditions ‘relating to the carrying out of operations’; changes of use to single dwellings; and breaches of a condition prohibiting such a change) …. The logic behind these exclusions is not entirely clear. Special protection was no doubt thought desirable for people’s homes. In the case of operations, the governing considerations presumably were the relative ease of detection, the potential costs involved in reinstating the land, and the need to provide certainty for potential purchasers.”
“I can entirely understand the local planning authority’s sense of frustration about this. Their planning department is not a police station, and the discovery that a person such as Mrs Brown has – not to put too fine a point on it – cheated on a conditional grant of permission, to detriment of her neighbours and of planning control, may well be a matter of time and of chance. The ordinary ten-year period might well have been thought reasonable for such cases, but – in circumstances which Carnwath LJ’s judgment illuminates – it is not what Parliament decided to provide.”
“15. The inspector rightly did not investigate the intentions of Mr Sage at various stages in the history nor the uses he had made of the structure from time to time. The character and purpose of a structure falls to be assessed by examining its physical and design features. The relevance of the assessment is to determine whether or not the building operation is one requiring planning permission. The actual use made of the building does not alter the answer to be given. Keeping a pig in the sitting-room or hens in the kitchen does not turn a dwelling house into an agricultural building even if the humans move out. Permission for a change of use may have to be applied for but that would be a separate question ….”
“23. When an application for planning consent is made for permission for a single operation, it is made in respect of the whole of the building operation. There are two reasons for this. The first is the practical one that an application for permission partially to erect a building would, save in exceptional circumstances, fail. The second is that the concept of final permission requires a fully detailed building of a certain character, not a structure which is incomplete. This is one of the differences between an outline permission and a final permission …. As counsel for Mr Sage accepted, if a building operation is not carried out, both externally and internally, fully in accordance with the permission, the whole operation is unlawful. She contrasted that with a case where the building has been completed but is then altered or improved. This demonstrates the fallacy in Mr Sage’s case. He comes into the first category not the second.”
“39. For example, under theTown and Country Planning General Development Order 1988 …, planning permission is in general not necessary for the erection of a building which is reasonably necessary for the purposes of agriculture. A farmer who commenced the construction of such a building would not, by doing so, be in breach of planning control. But if, before the building operations were complete, his intentions changed and he began to install a bathroom and other features indicative of a dwelling, the operations would be in breach of planning control ….”
“In the course of his judgment, with which the other members of the court agreed, Lord Parker C.J. said, at p. 491, [East Barnet Urban District Council v British Transport Commission[1962] 2 QB 484 ] that when considering whether there has been a change of use ‘what is really to be considered is the character of the use of the land, not the particular purpose of a particular occupier’. These words have rightly been recognised as extending beyond the issue of change of use: they are accepted as a statement of general principle in the planning law.”
“Personal circumstances of an occupier, personal hardship, the difficulties of businesses which are of value to the character of a community are not to be ignored in the administration of planning control. It would be inhuman pedantry to exclude from the control of our environment the human factor. The human factor is always present, of course, indirectly as the background to the consideration of the character of land use. It can, however, and sometimes should be given direct effect as an exceptional or special circumstances. But such circumstances, when they arise, fall to be considered not as a general rule but as exceptions to a general rule to be met in special cases. If a planning authority is to give effect to them, a specific case has to be made and the planning authority must give reasons for accepting it.”