"A supply of goods or services is zero-rated by virtue of this subsection if the goods or services are of a description for the time being specified in Schedule 5 to this Act or the supply is of a description for the time being so specified."
"Item No.
"... constructed of plain London brick with most of the first and second floors between horizontal brick panels taken up with long patent metal framed single glazed windows. At ground floor level apart from the two loading bay entrances, there was a main entrance about eight feet wide and two large windows of similar construction."
"The parts of the existing structure which were retained were as follows:
"Photographs taken during demolition and examination of the plans show that with the exception of the party walls and the retained ground floor wall on the east and west sides a person standing in the street could have seen right through the remaining structure and a person standing inside would have seen the sky through the substantial gaps in the floor and ceiling where the old lifts and stairs had been removed and the new ones were to be inserted. It might fairly be described as an incomplete skeleton albeit of substantial construction."
"The works comprise the complete refurbishment and enlargement of an existing building, giving approximately 34,700 sq ft of gross area on five floors including the basement. The existing reinforced concrete frame is being reused, with the addition of a steel frame mansard level and plant room. The external fabric of the building, all internal walls, lift, stairs and services are being replaced and brought up to present standards. A core area to all floors, the reception, and the ground floor offices are being completely fitted out. The office areas to the 1st, 2nd and 3rd floors will be left suitable for complete fitting out to tenants' choice."
"Leaving aside the basement, some 15 per cent. of the concrete slabs were new. The basement floor was in effect new. One third of the structural frame was new; some of the outermost columns and beams were found to be out of alignment and had to be replaced."
"There is substantially more brick than before and of a much better quality, namely Red Leicester Ibstock, with black mortar. Instead of the long window effect there are rectangular windows at regular intervals, ten each on the first and second floors and eight on the ground and third floor. There is a new front entrance and a circular window above and central at third floor level."
"The question which we must ask ourselves is whether the work done by Marchday at No. 44/52 Banner Street amounted to the conversion, reconstruction, alteration or enlargement of the existing building, in the sense in which these words are commonly used or whether the end result is a new building. We must compare the end result with the building as it was.
"Subject to the 'newness' point, we do accept that the work had elements of all four words in Note (1A) although the element of reconstruction was very limited."
"If the matter were res integra , my view of the relationship between item 2 and Note (1A) would be as follows: (1) the notion of "the construction... of any building" is capable of embracing the notion of "the conversion, reconstruction, alteration or enlargement of any existing building" since otherwise Note (1A)(a) would be redundant. (2) Note (1A)(a) excepts from item 2 a case where works falling within the meaning of any of the four nouns in Note (1A)(a) are carried out to an existing building, and such works may plainly be very substantial. (3) The touchstone for the application of Note (1A)(a) is whether a reasonable person, apprised of all the facts, would conclude that the building which existed before the works started still retains its identity - in that sense, still exists - at their completion, though it may have been transformed by conversion, etc. Whether that is the correct conclusion in any particular case will be a matter of fact and degree. The key is the continuity or otherwise of the identity of the building which was there before the works started."
"His position entails the proposition that the continuity of the pre-existing building's identity is not at all the touchstone for the proper application of the note. The difficulty with this argument, in my judgment, is not only that it fails to give due weight to the expression 'existing building', but also that it fails to confront the very sense of the four nouns used in the note - or at least three of them. The words 'conversion', 'alteration' and 'enlargement' seem to me to connote a state of affairs in which the building upon which such works are done necessarily remains after they are done. One cannot sensibly ascribe any of these three descriptions to a case where the old building is, in effect, destroyed; it continues to exist though it may have been substantially transformed."
"With regard to the various matters referred to in the note to Group 8, it is important to bear in mind that there can be a considerable overlap. However, being concerned in this appeal only with reconstruction, it appears to me important to recognise that what is required is first of all to look at the area covered by the new building, which it is accepted is being constructed, and then look at what was on that area before. Is what has been substituted properly describable as a reconstruction"
"Where, as will ordinarily be so, it is beyond argument that a building was in existence before the work began, all that para (a) of note (9) requires is to consider the building as it was, to consider the end result and to ask whether the work done amounts to the conversion, reconstruction, alteration or enlargement of the original building in the sense in which those words are commonly used or whether the end result is a new building. If a number of buildings existed before the work began the question will be whether the work amounted to the conversion, reconstruction, alteration or enlargement of one or more of them. The matter is one of fact and degree."
"In answering this question it will, in most cases, be helpful to look at the finished work and ask how much of the original has survived. If there happens to have been a stage during the work when all the demolition had been done and none of the new work had started, it may be useful to consider how the site would then have looked."
"Put shortly, the issue is whether Marchday constructed a building or carried out works to an existing building."
"the question which we must ask ourselves is whether the work done by Marchday ... amounted to the conversion, reconstruction, alteration or enlargement of the existing building, in the sense in which these words are commonly used or whether the end result is a new building."
"Once what constitutes the relevant 'building' has been identified, 'construction'... in the absence of any reference to 'part of a building', means erecting the building as a whole and 'demolition' means destroying it as a whole, so 'alteration' is left to cover all works to the fabric of the building which fall short of complete erection or complete demolition."
"The supply, in the course of the construction, alteration or demolition of any building..."
"It seems to us that the concept of a new building is simply the converse of an existing building."